Journal of Construction Engineering and Project Management
/
제4권1호
/
pp.29-36
/
2014
Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.
The geotechnical engineering research group in Korea Institute of Construction Technology(KICT), which was first started as a small sub-division of the civil research group in KICT, became an independent research cluster with nearly 90 researchers including 25 doctors(Ph.Ds). Our geotechnical engineering research group has developed to be the best research center related to geotechnical engineering in Korea in terms of number of budget of projects performed annually. As a reaction to the rapid changes of domestic and international issues regarding geotechnical practices, our group established long-term plans which will lead national research projects. For the successful and efficient research and technology development, the group is subdivided by several specialty-divisions. The divisions under the geotechnical engineering research group are tunnels and underground structures, slopes and embankments, geo-environment, foundations, soil reinforcements, and constructions in extremely cold regions. Our research scopes includes planning, site investigation, design, construction, maintenance and management. The geotechnical engineering research group is continuously and successfully examining and analyzing the most recent trends of technology and is predicting and focusing on the researches of newly-developing fields; therefore, the group has been a leading research group in geotechnical engineering nationally.
For hard rock subsea tunnels the most challenging rock mass conditions are in most cases represented by major faults/weakness zones. Poor stability weakness zones with large water inflow can be particularly problematic. At the pre-construction investigation stage, geological and engineering geological mapping, refraction seismic investigation and core drilling are the most important methods for identifying potentially adverse rock mass conditions. During excavation, continuous engineering geological mapping and probe drilling ahead of the face are carried out, and for the most recent Norwegian subsea tunnel projects, MWD (Measurement While Drilling) has also been used. During excavation, grouting ahead of the tunnel face is carried out whenever required according to the results from probe drilling. Sealing of water inflow by pre-grouting is particularly important before tunnelling into a section of poor rock mass quality. When excavating through weakness zones, a special methodology is normally applied, including spiling bolts, short blast round lengths and installation of reinforced sprayed concrete arches close to the face. The basic aspects of investigation, support and tunnelling for major weakness zones are discussed in this paper and illustrated by cases representing two very challenging projects which were recently completed (Atlantic Ocean tunnel and T-connection), one which is under construction (Ryfast) and one which is planned to be built in the near future (Rogfast).
Recent years have shown great advances in the feasibility of long subsea tunnels. Projects such as the Channel Tunnel, the Stoerebelt Tunnel or the Bosporus Crossing have pushed the boundaries of TBM tunneling technology and fueled the work on feasibility studies for even more challenging projects such as crossing the Qiongzhou or Gibraltar Straits. There are numerous geotechnical challenges such as wide variations of ground conditions, high operation pressures or long tunnel distances and finally geological uncertainties which must be solved in order to attempt such projects. Several operational challenges such as large muck quantities interventions under difficult conditions and long transport distances also have to be tackled. TBM manufacturer and construction industry have developed a number of approaches to these challenges which point into the right technical direction and have been proven successfully in recent experiences. Their further development will allow attempting several megaprojects which are currently under discussion.
After the Rio declaration on environment and development in 1992, developed countries are undertaking 'environmentally sustainable transportation (EST)' projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents accumulated for last six years. The EIA for railroad construction projects .accounts for only $4.9\%$ of total project EIAs during 1998-2003. However, the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water quality, wast management, noise, etc. We also compared the characteristics of environmental impacts of railroad construction with those of vehicle road construction. The result shows that railroad construction usually requires 3${\~}$4 times longer tunnels and bridges for a given length than vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than $40\%$ of those in vehicle road construction. In order to develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly required.
NATM becomes one of the major methods of tunnel construction, such as that of subways and highways. However, a number of design and construction problems have been noticed and reported from the recent large-scale tunnelling projects. Some of them are presented and discussed in this report in order to call an attention to these problems and provide a sound basis for the improvement of current problems.
After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.
This case study presented a simplified failure mechanism approach used as a preliminary deformation prediction for the Mexico City's metro system expansion. Because of the Mexico City's difficult subsoils, Line 12 project was considered one of the most challenging projects in Mexico. Mexico City's subsurface conditions can be described as a multilayered stratigraphy changing from soft high plastic clays to dense to very dense cemented sands. The Line 12 trajectory crossed all three main geotechnical Zones in Mexico City. Starting from to west of the City, Line 12 was projected to pass through very dense cemented sands corresponding to the Foothills zone changing to the Transition zone and finalizing in the Lake zone. Due to the change in the subsurface conditions, different constructions methods were implemented including the use of TBM (Tunnel Boring Machine), the NATM (New Austrian Tunneling Method), and cut-and-cover using braced Diaphragm walls for the underground section of the project. Preliminary crown and excavation front deformations were determined using a simplified failure mechanism prior to performing finite element modeling and analysis. Results showed corresponding deformations for the crown and the excavation front to be 3.5cm (1.4in) and 6cm (2.4in), respectively. Considering the complexity of Mexico City's difficult subsoil formation, construction method selection becomes a challenge to overcome. The use of a preliminary results in order to have a notion of possible deformations prior to advanced modeling and analysis could be beneficial and helpful to select possible construction procedures.
This paper concerns a case study on the design concept, analysis, construction methodology of a subway tunnel excavated in the soft ground beneath an existing building where the distance between the bottom of the building and the crown of the tunnel is separated by about 3 meters only. The silot tunnels are excavated in advance, and side reinforced-concrete walls are installed. Then, main tunnels are excavated with ring cut method. The steel ribs are installed and supported by the side walls made in advance. Between the steel ribs and the side walls, the screw jack is installed to apply prestressing so that settlement can be controlled at minimum. Various in-situ seasurements are made and compared with computed values obtained by numerical methods. By choosing this underpinning method with very caraful construction control, tunnelling projects could be finished successfully without having any damage to the building located very closely to the tunnel crown.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.