• Title/Summary/Keyword: planning model

Search Result 4,295, Processing Time 0.034 seconds

Development of Optimal Path Planning for Automated Excavator (자동화 굴삭기 최적경로 생성 알고리즘 개발)

  • Shin, Jin-Ok;Park, Hyong-Ju;Lee, Sang-Hak;Hong, Dae-Hee
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.78-83
    • /
    • 2007
  • The paper focuses on the establishment of optimized bucket path planning and trajectory control designated for force-reflecting backhoe reacting to excavation environment, such as potential obstacles and ground characteristics. The developed path planning method can be used for precise bucket control, and more importantly for obstacle avoidance which is directly related to safety issues. The platform of this research was based on conventional papers regarding the kinematic model of excavator. Jacobian matrix was constructed to find optimal joint angles and rotation angles of bucket from position and orientation data of excavator. By applying Newton-Raphson method optimal joint angles and bucket orientation were derived simultaneously in the way of minimizing positional errors of excavator. The model presented in this paper was intended to function as a cornerstone to build complete and advanced path planning of excavator by implementing soil mechanics and further study of excavator dynamics together.

  • PDF

An Integrated Production Management Model for a Manufacturing System (제조시스템을 위한 통합형 생산관리모형 구축)

  • Ahn, Jae-Kyoung
    • IE interfaces
    • /
    • v.16 no.1
    • /
    • pp.111-116
    • /
    • 2003
  • Business integration has been considered as one of the most critical success factors that enable the firms to gain competitive edges. Despite this trend, it has also been found among not a few companies that the activities that should be functionally tied with are performed even independently. In this study, an integrated model of production planning and inventory has been developed. Computerization of the production planning activities is proposed and implemented. We also proposed the reasonable inventory levels of each item using historic data of the items, which are composed of safety stock from the given fill-rate, operating stock from the production patterns, and reserved stock from the production planning. This study has helped the firm to have clearer job definition of the related processes, to tightly control the inventory by setting and tracing the reasonable fill rates for every product, and to quickly respond to the market changes through the computerized production planning process.

Systems Engineering Approach to Develop Intelligent Production Planning Scheduling Model linked to Machine and Quality Data (설비 및 품질 데이터 연계 지능형 생산계획 스케줄링 모델 개발을 위한 시스템엔지니어링 접근 방법)

  • Park, Jong Hee;Kim, Jin Young;Hong, Dae Geun
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.17 no.2
    • /
    • pp.1-8
    • /
    • 2021
  • This study proposes a systems engineering approach for the development of an advanced planning & scheduling (APS) system for a cosmetic case manufacturing factory. The APS system makes production plans and schedules based on the injection process, which consists of 27 plastic injection machines in parallel to control recommended inventory of products. The system uses machine operation/failure information and defective product/work-in-process tracking information to support intelligent scheduling. Furthermore, a genetic algorithm model is applied to handle the complexity of heuristic rules and machine/quality constraints in this process. As a result of the development, the recommended inventory compliance rate is improved by scheduling the 30-day production plan for 15 main products.

Improved Gauss Pseudospectral Method for UAV Trajectory Planning with Terminal Position Constraints

  • Qingquan Hu;Ping Liu;Jinfeng Yang
    • Journal of Information Processing Systems
    • /
    • v.19 no.5
    • /
    • pp.563-575
    • /
    • 2023
  • Trajectory planning is a key technology for unmanned aerial vehicles (UAVs) to achieve complex flight missions. In this paper, a terminal constraints conversion-based Gauss pseudospectral trajectory planning optimization method is proposed. Firstly, the UAV trajectory planning mathematical model is established with considering the boundary conditions and dynamic constraints of UAV. Then, a terminal constraint handling strategy is presented to tackle terminal constraints by introducing new penalty parameters so as to improve the performance index. Combined with Gauss-Legendre collocation discretization, the improved Gauss pseudospectral method is given in detail. Finally, simulation tests are carried out on a four-quadrotor UAV model with different terminal constraints to verify the performance of the proposed method. Test studies indicate that the proposed method performances well in handling complex terminal constraints and the improvements are efficient to obtain better performance indexes when compared with the traditional Gauss pseudospectral method.

Preliminary Construction Cost Prediction Model Based on Module for Modernized Hanok (초기 기획단계의 신한옥 공사비 예측 모델 - 모듈(칸) 기반의 목공사 개략 물량 산출 중심으로 -)

  • Kang, Seunghee;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.48-56
    • /
    • 2020
  • Prediction of construction cost in the planning stage that provides basic information for feasibility study, budgeting, and planning is an important factor for successful project execution. In this study, a prediction model was developed for the purpose of improving the accuracy of estimating the construction cost of Hanok in the planning stage. The cost of this model is estimated by two methods. First, the cost of wood work, which accounts for the largest portion of the total construction cost, is estimated by calculating the approximate quantity under various conditions (structure type, roof type, plane type, etc.). Second, the cost of the rest work sections except the wood work is estimated by using the unit cost model. The predictive model was verified by two case projects, and the error rate of total construction cost was -4%(case 1) and -6%(case 2). These results showed an error rate in the range that can be applied to practice in the planning stage.

BIM-based Lift Planning Workflow for On-site Assembly in Modular Construction Projects

  • Hu, Songbo;Fang, Yihai;Moehler, Robert
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.63-74
    • /
    • 2020
  • The assembly of modular construction requires a series of thoroughly-considered decisions for crane lifting including the crane model selection, crane location planning, and lift path planning. Traditionally, this decision-making process is empirical and time-consuming, requiring significant human inputs. Recently, research efforts have been dedicated to improving lift planning practices by leveraging cutting-edge technologies such as automated data acquisition, Building Information Modelling (BIM) and computational algorithms. It has been demonstrated that these technologies have advanced lift planning to some degree. However, the advancements tend to be fragmented and isolated. There are two hurdles prevented a systematic improvement of lift planning practices. First, the lack of formalized lift planning workflow, outlining the procedure and necessary information. Secondly, there is also an absence of a shared information environment, enabling storages, updates and the distribution of information to stakeholders in a timely manner. Thus, this paper aims to overcome the hurdles. The study starts with a literature review in combination with document analysis, enabling the initial workflow and information flow. These were contextualised through a series of interviews with Australian practitioners in the crane-related industry, and systematically analysed and schematically validated through an expert panel. Findings included formalized workflow and corresponding information exchanges in a traditional lift planning practice via a Business Process Model and Notation (BPMN). The traditional practice is thus reviewed to identify opportunities for further enhancements. Finally, a BIM-based lift planning workflow is proposed, which integrates the scattered technologies (e.g. BIM and computational algorithms) with the aim of supporting lift planning automation. The resulting framework is setting out procedures that need to be developed and the potential obstacles towards automated lift planning are identified.

  • PDF

Supply Chain Planning in Multiplant Network (다중플랜트 네트워크에서의 공급사슬계획)

  • Jeong Jae-Hyeok;Mun Chi-Ung;Kim Jong-Su
    • Proceedings of the Society of Korea Industrial and System Engineering Conference
    • /
    • 2002.05a
    • /
    • pp.203-208
    • /
    • 2002
  • In case of the problems with multiple plants, alternative operation sequence, alternative machine, setup time, and transportation time between plants, we need a robust methodology for the integration of process planning and scheduling in supply chain. The objective of this model is to minimize the tardiness and to maximize the resource utilization. So, we propose a multi-objective model with limited-capacity constraint. To solve this model, we develope an efficient and flexible model using adaptive genetic algorithm(AGA), compared to traditional genetic algorithm(TGA)

  • PDF

A Multiproduct Facility-in-Series Production Planning Model

  • Sung, C.S.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.9 no.2
    • /
    • pp.15-22
    • /
    • 1984
  • A deterministic multiproduct, facility-in series multiperiod production planning model is analyzed, where each period demand for the product of a facility appear in a fixed proportion of that for the product of the immediately following facility. The model considers concave production and inventory costs, which can depend upon the production in different facilities. No backlogging is allowed. It is shown that the model is represented via a single source network, which facilitates development of efficient dynamic programming algorithms for computing the optimal production schedule.

  • PDF

A Nonlinear Programming Model for the Solution of the Train Seat Capacity Distribution Problem (열차의 좌석용량 배분을 위한 비선형계획모형)

  • 김성호;홍순흠
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.72-79
    • /
    • 2001
  • In this paper we present a nonlinear programming model for the solution of the train seat capacity distribution problem (TSCDP) with a numerical example. The TSCDP model finds the optimal capacity distribution methods which minimize the sum of the differences between the demands and the seat capacities. Also the TSCDP provides the information on the degree of the discrepancy between the demand and the seat capacities. One can use the TSCDP model as a tool for planning train seat capacity planning.

  • PDF

Depvlopment of the Evaluation Model of Location Suitability for Protected Horticulture by AHP Method (AHP기법을 이용한 시설원예의 적지평가모델 개발)

  • 황한철;김정식
    • Proceedings of the Korean Society of Rural Planning Conference
    • /
    • 1998.10a
    • /
    • pp.9-11
    • /
    • 1998
  • It is necessary to evaluate the location suitability of protected horticulture facilities to guide and/or plan new protected horticulture facilities in rural areas.0 this study, as one of methodological approaches for objective and systematic evaluation for location suitability of protected horticulture, the evaluating model for location suitability of protected horticulture was formulated using AHP (Analytic Hierarchy Process) as the base technique. The evaluation model was made in three different selected regions; suburban, plain, and mountainous. The results showed that there were significant differences in evaluation model of location suitability for':ed horticulture among the three regions.

  • PDF