• Title/Summary/Keyword: main-stream

Search Result 1,063, Processing Time 0.04 seconds

Water Quality Properties of Tributaries of Daechung Lake, Korea (대청호 유입지천의 수질 특성)

  • Shim, Moo Joon;Yoon, Jae Yong;Lee, Soo Hyung
    • Korean Journal of Ecology and Environment
    • /
    • v.48 no.1
    • /
    • pp.12-25
    • /
    • 2015
  • The tributaries of Daechung Lake play an important role in controlling eutrophication in the lake, which is used for agricultural purposes and as potable water. However, water quality properties were not extensively studied in the tributaries of Daechung Lake. The objectives of this study are to investigate spatial and temporal properties of water quality and to characterize streams which could threaten water quality of Daechung Lake. For this study, water samples were weekly or monthly collected from February 2014 to October 2014 in 9 streams. Water quality parameters analyzed in this study include biochemical oxygen demand (BOD), chemical oxygen demand (COD), total organic carbon (TOC), total nitrogen and phosphorus (TN and TP), suspended solids (SS), and chlorophyll a. Based on temporal distribution and principal component analysis, BOD, COD, TOC, SS, and TP were controlled by not only river discharge that increased during summer due to heavy rain fall, but also due to anthropogenic input (e.g., bridge construction and/or agricultural activity). Dilution is also one of the factors explaining TN and conductivity, both of which decreased with increased discharge. Generally, concentrations of contaminants (BOD, COD, TOC, TN and TP) in the tributaries were higher than those of Daechung Lake. However, pollution load indicated that only the main channel of Geum River and Sook Stream may largely influence lake waters, attributed mostly to their large volumes. This implies that the main channel and Sook Stream are the major influences on the water quality of Daechung Lake.

Studies on Debris Flows by Heavy Rainfall in Osaek Area in July 2006 (2006년 7월 집중호우로 인한 오색천 유역의 토석류 발생과 그 특성)

  • YANG, Heakun;PARK, Kyeong
    • Journal of The Geomorphological Association of Korea
    • /
    • v.15 no.2
    • /
    • pp.25-35
    • /
    • 2008
  • Typhoon Ewiniar and Bilis followed by heavy rainfall in July 2006 triggered massive slope failures and debris flows along the Osaek valley within Seoraksan National Park. Since national road 44 is constructed along the fault-line, the susceptibility of hazard in the area is very high. Debris flows in Osaekcheon are mobilized from landslides near the ridgelines and peaks when heavy rainfall elevates pore pressure and adds weight to the hillslopes, causing failure. Stream flows falling onto the existing colluvium or channel-margin deposits also trigger debris flows. Steep slopes constructed along the road and thin regolith in the slope is the main reason for the landslide in the upper stream. In middle reaches of stream, under-fit drainage utilities and narrow bridges cause the overflow, this then triggers debris flow. Overflowing and erosion in the channel margin deposits is main reasons for the debris flow. The intensities and frequencies of heavy rainfall are certain to increase, so early warning and management system for the landslide-related hazard is urgently needed.

Multi-level Load Shedding Scheme to Increase Spatial Data Stream Query Accuracy (공간 데이터 스트림 질의 정확도 향상을 위한 다단계 부하제한 기법)

  • Jeong, Weonil
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8370-8377
    • /
    • 2015
  • In spatial data stream management systems, it is needed appropriate load shedding algorithm because real-time input spatial data streams could exceed the limitation of main memory. However previous researches, lack regard for input ratio and spatial utilization rates of spatial data streams, or the characteristics of data source which generates data streams with spatial information efficiently, can lead to decrease the performance and accuracy of spatial data stream query. Therefore, multi-level load shedding scheme for spatial data stream management systems is proposed to increase the spatial query performance and accuracy. This proposed scheme limits overloads in relation to the input rate and the characteristics of data source first, and then, if needed, query data representing low query participation probability based on spatial utilizations are dropped relatively. Our experiments show that the proposed method could decrease load shedding frequency for previous researches by more than 11% despite query results accuracy and query performance are superior at 0.04% and 3%.

Development of a GIUH Model Based on River Fractal Characteristics (하천의 프랙탈 특성을 고려한 지형학적 순간단위도 개발(I))

  • Hong, Il-Pyo;Go, Jae-Ung
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.565-577
    • /
    • 1999
  • The geometric patterns of a stream network in a drainage basin can be viewed as a "fractal" with fractal dimensions. Fractals provide a mathematical framework for treatment of irregular, ostensively complex shapes that show similar patterns or geometric characteristics over a range of scale. GIUH (Geomorphological Instantaneous Unit Hydrograph) is based on the hydrologic response of surface runoff in a catchment basin. This model incorporates geomorphologic parameters of a basin using Horton's order ratios. For an ordered drainage system, the fractal dimensions can be derived from Horton's laws of stream numbers, stream lengths and stream areas. In this paper, a fractal approach, which is leading to representation of a 2-parameter Gamma distribution type GIUH, has been carried out to incorporate the self similarity of the channel networks based on the high correlations between the Horton's order ratios. The shape and scale parameter of the GIUH-Nash model of IUH in terms of Horton's order ratios of a catchment proposed by Rosso(l984J are simplified by applying the fractal dimension of main stream length and channel network of a river basin. basin.

  • PDF

Lag Time Estimation and Runoff Prediction Based on the Gemorphologic Parameters (유역(流域)의 지형학적(地形學的) 인자(因子)에 기초한 운체시간(運滯時間)의 산정(算定)과 유출예측(流出豫測))

  • Chon, Min Woo;Cho, Won Chul;Lee, Won Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.9 no.4
    • /
    • pp.93-102
    • /
    • 1989
  • A runoff model is estabilished for the direct runoff hydrograph at the watershed outlet. The watershed is divided into subareas bounded by watershed lines of stream segment. Different storage elements are used to represent the subareas which simply translate rain-fall excess to runoff and transmit flow from an upstream areas. For transmit, the relationship between flowsection and runoff is expressed by the exponential function to represent the nonlinearity of lag time, and the relationship between flowsection and stream length is expressed by the 1st order equation to represent the effect of the travel length. The parameters of lag time can be obtained by stream magnitude and the effective rain fall is routed through the main stream. Application of the model to the Bochung river basin gives accurate results, especially for the peak runoff and peak time, and is approved to be used for the prediction by stream magnitude of small watershed having no runoff records.

  • PDF

Contamination Sources of Several Potentially Hazardous Compounds Found at the Gap Stream and the Miho Stream, Two Major Tributaries of the Geum River (금강 수계 주요지류인 갑천과 미호천에서 잠정유해물질 오염원 확인 연구)

  • Lee, Jun-Bae;Lee, Jay-Jung;Cho, Yoon-Hae;Yoon, Jo-Hee;Hong, Seoun-Hwa;Lee, Dae-Hee;Lee, Dae-Hee;Cho, Young-Hwan;Shin, Ho-Sang
    • Korean Journal of Environmental Agriculture
    • /
    • v.35 no.1
    • /
    • pp.15-23
    • /
    • 2016
  • BACKGROUND: Water quality is of concern to water utility operators, public health officials, and populations using the water. If any contaminant is released from a point of entry, it could be spread rapidly throughout the water stream. So the identification of the location of the points of entry and its release history are critical informations to establish the management strategy.METHODS AND RESULTS: Aniline, nonylphenol, pentachlorophenol and formaldehyde in 39 surface water samples were analysed using Gas chromatography-mass spectrometry (GC-MS) methods. Formaldehyde, aniline and nonylphenol were mainly detected in the near sites where industrial waste water and domestic sewage were discharged into stream. But pentachlorophenol was detected in the downstream samples where pulp manufacturing plants were operated.CONCLUSION: Results indicate that pentachlorophenol found in main stream of Guem river was mainly introduced from pulp manufacture industries. Otherwise, formaldehyde, aniline and nonylphenol were mainly contaminated from the industrial waste water and domestic sewage.

An Analysis on the Relationship between Discharge and Pollution Load on the Tributary Basin of Kum River (금강지류 유역에서의 유출량과 오염부하량의 상관관계 분석)

  • Jeong, Sang-Man;Im, Gyeong-Ho;Choe, Jeong-Hyeon
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.5
    • /
    • pp.527-536
    • /
    • 2000
  • This study estimates the pollution load in a basin by regional groups analyzing the relationship between the discharge and pollution load. The study area is placed in the Miho stream basin known as the main tributary of the Kum river. Four major Telemetary streamflow stations are chosen. In this research, discharge and water quality in a dry season and a flood season from the observed discharge in the stream are analyzed. The Rating-Curve and the Pollutograph are drawn analyzing discharge and water quality at the major stations. The characteristics of runoff for each stream are analyzed and the change of water quality are analyzed for rainfall period. The relationship between discharge and water quality has been investigated. The relationship between the discharge and pollution load is analyzed and a representative equation is derived. These relationships permit an estimates of the pollution load at the Miho stream basin. basin.

  • PDF

An Ecological Restoration of Urban Streams by Supplying Maintenance Water (도시하천의 유지용수 공급에 따른 생태복원)

  • Cho, Hong Je;Lee, Su Ji
    • Journal of Wetlands Research
    • /
    • v.15 no.3
    • /
    • pp.317-328
    • /
    • 2013
  • The aim of this study is to compare the effects of the maintenance water supply methods on the ecological restoration of 5 urban streams such as Mugeo cheon, Yaksa cheon, Yeocheon cheon, Myeongjeong cheon and Cheokgwa cheon in Ulsan metropolitan city. Water quality of the streams have been innovatively improved and the ecosystems have gradually been restored by supplying maintenance water constantly. However, we found that if the maintenance water was in a state of higher salinity or low quality, even enough supply was not helpful and even harmful for ecological restoration. We confirmed that the most important things to create or maintain from the urban stream to the ecological stream are that facilities like a walkway construction should be installed at least, supplying appropriate maintenance water, and a connection with the main stream.

Development of Flood Prediction Model using Hydrologic Observations in Cheonggye Stream (수문관측 기반의 청계천 홍수예측모델 구축)

  • Bae, Deg-Hyo;Jeong, Chang Sam;Yoon, Seong Sim
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6B
    • /
    • pp.683-690
    • /
    • 2008
  • The objectives of this study are to provide an observation-based urban flood prediction model and to evaluate their performance on a restored Cheonggye stream. The study area, which has its own unique hydrologic and flooding conditions that can be characterized the standard of flood occurrence by watergate opening and walk lane inundation, measured stream discharges at the 5 sites and watergate opening and walk lane inundation through the main stream since 2006. This study derived the relationship between precipitation intensity and watergate opening and walk lane inundation time by using the observations of 2006 and verified their performance on 2007 flood events. The result showed that the coefficients of determination are ranged on 0.57-0.75, which would be acceptable if considering the complexity of the area and the proposed model simplicity. It also suggested the continuous observation of these properties is required for further improvement of the models.

A Study on the Boulder Stream of Granitoid in Korea (한국 화강암질암류 산지에서 발달하는 암괴류에 관한 연구)

  • Jeon, Young-Gweon
    • Journal of the Korean association of regional geographers
    • /
    • v.6 no.2
    • /
    • pp.71-82
    • /
    • 2000
  • The purpose of this paper is to clarify geomorphic features and development on the boulder stream of granitoid in Korea. Considering the purpose and the method of this paper, three boulder streams are selected : Biseulsan(Mt. Biseul) boulder stream (Daegu city), Maneosan (Mt. Maneo) boulder stream(Gyeongnam province), Geumjeongsan(Mt. Geumjeong) boulder stream (Busan city). The boulder streams mentioned above are bigger in scale and more typical in shape than any other ones in the Korean Peninsula. The main results are summarized as follows. 1. The following are the main features of the boulder streams morphology : the mean gradient is $3{\sim}25^{\circ}$, the longer axes of the component boulders within the deposits averaged about 2m in length, the shapes of the component boulders may be both subangular and subrounded features. 2. The formation of the component boulders is associated with deep weathering of granitoid under warm humid conditions, and the downward movement of boulders occurred by solifluction and frost creep under periglacial conditions. 3. The geomorphic development stage of the boulder streams may be classified into four stages. These boulder streams come under fossil landform stage, the 4th stage ; evidence provided by lichens and weathering features indicate inactive or fossil landform. 4. In generally, boulder streams are well developed on shallow valley floors.

  • PDF