• Title/Summary/Keyword: housing repair

Search Result 150, Processing Time 0.025 seconds

Insulation Performance Evaluation of Apartment Housing Using Infra-red Camera (적외선 열화상을 이용한 공동주택 단열성능 평가 - TDR(온도상대비)을 중심으로 -)

  • Choi, Bo-Hye;Choi, Gyoung-Seok;Kang, Jae-Sik;Lee, Seung-Eon
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.718-723
    • /
    • 2009
  • The purpose of this study is to present an in-site evaluation method for building insulation performance using Infra-red camera. The research contents of this study are to evaluate validity and suitability of building insulation defect survey using Infra-red camera for apartment housing with temperature & heat flow pattern analyze method. By establishing the in-site evaluation method building insulation performance using infra-red camera, it is expected that 1) building envelope repair market will be activated by using developed method in ESCO and remodeling companies, 2) the method developed in this research will contribute to reduce national energy consumption by promoting old building insulation remodeling.

  • PDF

A Study on use state of Defect Deposite based on Actual use data - focused on 3 years after moving in apartment complex - (실적자료에 기초한 공동주택 하자보수보증금 사용실태 분석연구 - 3년차 단지를 중심으로 -)

  • Seo, Deok-Seok;Choi, Jung-Hyun;Kim, Ok-Kyue;Park, Kang-Woo;Cho, Jae-Hun;Park, Jun-Mo;Kim, Kwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.81-88
    • /
    • 2010
  • Under the law of Management of Apartment Complexes, the Apartment Supplier should satisfy the demands of residents for the repair of defects found in Apartment Housing. But in the cost of defect repair, the expense of resident complaints is not included, and only the actual defect repair expense is counted. So in this study, the actual use state of defect deposits for 3 years after moving in is analyzed based on the actual use data of 39 apartment complexes. The study shows that more than 50% of defect repair deposits are spent to satisfy expenses arising from complaints by residents. This is not only caused by irrational demands of residents, but also by the adoption of a stopgap policy by Apartment Suppliers.

Teachers' Recognitions on Experiment and Practice for Home Economics area of a Technology and Home Economics curriculum in Middle School (중학교 기술.가정 교과 중 가정 영역의 실험 실습에 대한 교사의 인식)

  • Lee, Joo-Hee;Shin, Hye-Won
    • Journal of Korean Home Economics Education Association
    • /
    • v.19 no.1 s.43
    • /
    • pp.81-97
    • /
    • 2007
  • This study investigated the Present status of laboratories for experiment and practice, and analyzed teachers' recognitions on experiment and practice for Home Economics area of a Technology and Home Economics curriculum according to majors of teachers. Questionnaires were mailed to middle school teachers who taught home economics part and they answered on the web. 220 replies were used for the final analysis. The findings were as follows: First, the facilities and teaching equipments of laboratories for home economics area were inferior, especially, for clothing and textiles part and housing part. Second, teachers recognized necessity to conduct experiment and practice highly. Food life part scored the highest, while housing part scored the lowest. Teachers who majored in home economics recognized more necessities of experiment and practice than teachers who didn't majored in home economics. Third, they recognized level of experiment and practice to be suitable to students, but 'maintenance and repair of housing' section was relatively less suitable than other sections. Fourth, 'making clothes and recycling' section was recognized to have the least suitability in quantities and hours of experiment and practice lesson, because of too much contents and lack of lesson hours. Fifth, teachers recognized that students were more interested in 'the basis of food preparation and practice' section, but they are less interested in 'maintenance and repair of housing' section. Sixth, teachers recognized that contents of experiment and practice were very useful to the real life. 'The basis of food preparation and practice' section was the most useful, while 'maintenance and repair of housing' section was the least useful. Seventh, experiment and practice lessons for food life part were put in practice very well, followed by the order of clothing and textiles part and housing part. Teachers who majored in home economics usually took more experiment and practice lessons than teachers who didn't major in home economics.

  • PDF

Teachers' Importance Perception of the Contents in Housing Unit of Middle School Technology and Home Economics Subject (중학교 기술 가정 교과의 주생활단원 내용에 대한 교사의 중요도 인식)

  • Jun, Kyung-Sook
    • Journal of Korean Home Economics Education Association
    • /
    • v.20 no.4
    • /
    • pp.223-237
    • /
    • 2008
  • The purpose of this research was to provide the information needed for improving the contents in housing unit of middle school technology and home economic textbook. For this purpose, a survey questionnaire was developed to examine teachers' importance perception of 48 contents in housing unit. A direct survey and an e-mail survey were used to collect data from teachers, and a total number of 233 data were analyzed. Conclusions were summarized as following: 1. Among the 48 contents in housing unit, the average score of teachers' importance perception of the 18 contents on 'interior environment and equipments' was 3.94; the average score of teachers' importance perception of the 15 contents on 'living space plan and use' was 3.78; and the average score of teachers'importance perception of the 15 content on 'housing maintenance and repair' was 3.42. Therefore, the 15 contents on 'housing maintenance and repair' must be revised. 2. Teachers' importance perception of 25 contents, among the 48 contents in housing unit, were significantly differentiated by gender, age, teaching experience, scholastic attainment, subject in charge(technology, home economics, technology and home economics), school type(boys' middle school, girls' middle school, coeducation), and region(city, county). Therefore, the 25 contents, of which importance perception were influenced by teachers' characteristics, must be revised in order to maintain the consistent importance perception. Suggestions were that the team teaching of technology and home economic textbook was more recommendable; that the local situations must be considered in the contents of housing unit and; that the contents of housing unit must be segmented into a minimum unit for the accurate evaluation.

  • PDF

The Effective Process of Apartment Housing Defect Management Using Smart Device (스마트 기기를 활용한 공동주택 하자 관리의 효율화 방안)

  • Suh, Jung-Il;Lee, Jae-Woong;Lee, Jeong-Ho;Kim, Young-Suk
    • Journal of KIBIM
    • /
    • v.2 no.2
    • /
    • pp.27-36
    • /
    • 2012
  • Recently, apartment housing tends to increase 3-4% every year by economic growth and development of construction technology in domestic construction industry. According to this tendency, construction enterprises are providing high-quality and various residential space, and residents also want high-quality apartment housing without any defect. Construction company make efforts to decrease construction defects in order to satisfy all the residents, and to improve company value. However, it is impossible to have no defect in construction because construction works are combination of many different complicated process. Because of the responsibility for the defect, conflicts between construction company and residents have been occurred. This study suggests defects management method that can be used from defect register phase to defect repair phase with a function of smart-device of the high penetration rate. The effectiveness use of the suggested method might save defects maintenance time and improve resident satisfaction about construction quality.

Flexible Unit Floor Plan of Off-Site Construction Housing Considering Long-Lasting Housing Certification System (장수명주택 인증을 고려한 OSC공법 주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun;Roh, Jeong-Yeol;Kwon, Soo-Hye;Kim, Seung-Mo
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.103-117
    • /
    • 2021
  • With the current rapid changes in population and technology, the long-lastig housing certification system is a means of prolonging the physical and functional lifespan of a building. The certification requires differentiation between the structure and infill elements to allow for variability and ease of repairs. This works well with prefabricated houses so this study investigated the possibility of applying the long-lastig housing certification requirements to apartment construction using off-site construction (OSC) methods focused on the installation of bathrooms (plumbing and toilet) that differ from the traditional wet method. This study examined three different sized floor plans at 22 m2, 46 m2, and a combined one resulting in 69 m2. The larger 69 m2 plan utilized a removeable non-load bearing wall to increase flexibility in the layout of the floorplan. The apartments are constructed of steel reinforced concrete composite columns on a 9 m × 10.5 m grid with integrated slabs. The exterior and interior infill walls are all non-load bearing with some containing plumbing. This separation of the structure and infill walls can help meet some of the criteria in the long-lastig housing certification, particularly with the ease of repairs. Technologies that facilitate the replacement of infill elements that contain plumbing and other building services can benefit the nation by reducing carbon emissions and therefore tax incentives should be introduced to increase the adoption of the proposed construction methods.

Repair of precracked RC rectangular shear beams using CFRP strip technique

  • Jayaprakash, J.;Samad, Abdul Aziz Abdul;Abbasovich, Ashrabov Anvar;Ali, Abang Abdullah Abang
    • Structural Engineering and Mechanics
    • /
    • v.26 no.4
    • /
    • pp.427-439
    • /
    • 2007
  • The exploitation of fibre reinforced polymer composites, as external reinforcement is an evergreen and well-known technique for improving the structural performance of reinforced concrete structures. The demand to use FRP composites in the civil engineering industry is mainly due to its high strength, light weight, and stiffness. This paper exemplifies the shear strength of partially precracked reinforced concrete rectangular beams repaired with externally bonded Bi-Directional Carbon Fibre Reinforced Polymer (CFRP) Fabrics strips. All specimens were cast in the laboratory environment without any internal shear reinforcement. The test parameters were longitudinal tensile reinforcement, shear span to effective depth ratio, spacing of CFRP strips, and orientation of CFRP reinforcement. It mainly focuses on the shear capacity and modes of failure of the CFRP strengthened shear beams. Results have shown that the CFRP repaired beams attained a shear enhancement of 32% and 107.64% greater than the control beams. This study underscores that the CFRP strip technique significantly enhanced the shear capacity of precracked reinforced concrete rectangular beams without any internal shear reinforcement.

A Study on the Improvement Direction of Life Safety Codes for High Fire Risk Building Applications (화재위험성이 높은 건축물의 용도를 대상으로 한 인명안전기준의 개선방향)

  • Kwon, Young-Jin;Jin, Seung-Hyeon;Lee, Byeong-Heun;Koo, In-Hyuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.53-54
    • /
    • 2021
  • Grenfell Tower was renovated in 2014 and 2016 at a high cost to replace the exterior materials, windows and co-heating facilities of the building. The exterior materials used during the repair work were sandwich panels filled with polyethylene and plastic, which were expanded on the aluminum metal surface. It is a product called Celotex RS 5000, a low-resolution but inexpensive repair material, and is currently an external material that cannot be used in high-rise buildings. Similar domestic fire cases began to focus social attention on the safety of high-rise buildings through the Busan Residential Complex Fire (2010), Uijeongbu Urban Living Housing Fire (2015), and Ulsan Residential Complex Fire (2020), and residents' safety concerns are increasing. In Korea, the occurrence and risk of similar fires are high, so setting up fire prevention measures through fire case investigation is considered the most basic measure in securing human safety. Therefore, the purpose of this study is to examine the status of fire damage caused by domestic and foreign eruptions, domestic and international research status and related regulations on external materials and windows starting from the Grenfell Tower fire in England.

  • PDF

A Study on the End of Defects Liability Exit Procedure in Apartment Buildings through Case Studies (사례분석을 통한 공동주택 하자담보책임 종료 절차연구)

  • Kim, Jin-kuk;Bang, Hong-Soon;Choi, Byung-Ju;kim, Ok-Kyue
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.10
    • /
    • pp.25-32
    • /
    • 2018
  • The ending of the warranty under the current Multi-Housing Management Act has a lot of problem as it is very disadvantageous to the business entity and it makes hard for the contractor to finish the repair work. It is almost none for the business entity to get the written confirmation of the expiration of warranty liability from the client even though it sincerely completed their warranty obligation. It is because the client asks for the works other than fair repair arising from the defect in the work, such as the upgrade work for the enhancement of the value of their assets and the repair work which the client should take care before it issues the written confirmation of the expiration of warranty liability to the contractor. "So, though there is the law specifying this matter, the parties are relying on the unnecessary civil agreement. This leads to the big social and economic losses. If there is no agreement made between the client and the contractor, that leads to the legal dispute. This research on cases of 10 apartments shows that the types of works which the apartment residents ask for depend on the characteristics and conditions of the apartments and that they ask for various kinds of compensational works. In addition, it was found that there were many cases in which even the civil agreement is not recognized as the ending of the warranty obligation even if the proper procedure is taken for the ending of warranty by the contractor or business entity. If the collateral is to be offered to the client, the contractor would get more hard because there is the additional cost other than the warranty obligation, thus damaging the legal objective of the laws trying to minimize the damage made to the resident of the apartments. It means that the increase in the unnecessary warranty cost would lead to the increase in the selling price of apartment and the ending of the dispute through the civil procedure would make the Multi-Housing Act ineffective.

Analysis of Importance by Defect Type in Apartment Construction (공동주택 건축공사 하자유형별 중요도 분석)

  • Kim, Do-Hyung;Lee, Dongyoun;Lee, Hak-Ju;Min, Yoon-Gi;Park, Insung;Cho, Hunhee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.4
    • /
    • pp.357-365
    • /
    • 2020
  • While numbers of apartment housing are continually rising in the domestic housing construction industry, apartment contractors are currently developing plane models, upgrading facilities, and relevant technology, and investing much efforts to meet the higher demands of consumers. However, the construction process of apartment housing involves the intricate properties of the construction industry such as materials, workforce, equipment, weather, and unpredictable situations. If any of these factors becomes discordant and results in interference and interruption of the construction process, then defects, both functional and aesthetic, are likely to occur due to errors in the plan of industry organizers and constructors. Therefore, this research identifies the types of defects in an apartment construction project and analyzes their relative importance. Firstly, this research reviews the previous research trends and will reduce the needs of this research. Afterward, defect repair costs corresponding to the different defect types are calculated by applying results of the research and performing frequency analysis on defect types included in 'Tenant preliminary research' on apartments constructed by Company A. As a result of analyzing the importance of defect type, the top six activities, including tile, floor, paper hanging, PL window, cabinetry, and kitchen cabinet, are found to be of high importance, and the top six activities in question need of repair and management of defects first. The results of this study will help establish a plan to initially respond to such problems as refusal to move in and filing a defect suit against delay in repairing defects.