• Title/Summary/Keyword: heat exchange system

Search Result 332, Processing Time 0.024 seconds

The Characteristics of Indoor Temperature and Airflow Distribution for Air Supply and Return System in Dome Stadium (돔경기장의 급배기방식에 따른 기류분포 및 실내온도 특성)

  • Chae, Mun-Byoung;Yang, Jeong-Hoon;Seok, Ho-Tae
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.434-439
    • /
    • 2008
  • Dome stadiums give thermal unpleasant feeling to occupants because of the radiant heat and the indoor and outdoor haet exchange from roogs or lightweight building envelopes of sidewalls. This study analyzed the indoor temperature and velocity distribution according to various air supply and return sustems in dome stadiums in summer.

  • PDF

Case study on construction and economic analysis of geothermal heat pump system (지열 시공 사례 및 동절기 경제성 분석)

  • Park, Chen-Kwan;Shin, Yang-Han;Woo, Ju-Sik;Jeong, Hyo-Min;Chung, Han-Shik
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.7 no.1
    • /
    • pp.17-22
    • /
    • 2011
  • Renewable energy is growing based on low-carbon green energy government policies. According to this policy, geothermal energy is highly efficient and environmental friendly energy which is being recently expanded. However, construction companies are generated disorderly but their ability has not been verified due to the poor geothermal facility which was reported in the media. In the this paper introduce on Busan region's largest geothermal facility, it was confirmed that thermal efficiency of the underground is close to heat exchanger performance. Therefore the study improving the efficiency of underground heat exchange found progressed. The results showed voids between borehole and ground heat exchanger should not be raised. And then geothermal facilities were installed very successfully through the principle grouting operation. As compared to the energy consumption on the basis of operating results energy usage was less than any other heat sources.

Study on the Frosting Phenomenon of the Fin and Tube Heat Exchanger with a Louvered Fin (루버형 휜을 가진 휜관형 열교환기의 착상현상 연구)

  • Kim, Jung-Kuk;Kuwahara, Ken;Koyama, Shigeru;Park, Byung-Duck
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.11 no.4
    • /
    • pp.157-163
    • /
    • 2008
  • The present study investigated the pressure drop and the total frost mass of the louvered fin type heat exchanger, which is widely used at the air-conditioning system. The pressure drop due to the frosting phenomenon and the total frost mass were investigated by changing the wet bulb temperature condition of the inlet air. Hence the brain of 55wt% was used as a cooling solution instead of a common refrigerant. The temperature difference between the brine and the tube outside wall at the outlet of heat exchanger was $10^{\circ}C$, at maximum, higher than that at the inlet of heat exchanger. As the wet bulb temperatures were increased, the pressure drop was linearly increased due to the increment of frost mass. And the increment of heat exchange rate was smaller than that of inlet air enthalpy due to the increment of frost mass. The pressure drop of air side was rapidly increased due to the progress of frosting phenomena. The run time that the pressure drop occurred rapidly was decreased by the growth of frost.

  • PDF

Development of a Conversion Unit converting the existing air conditioner to Heat Pump System for the Emergency Shelter (재해임시주거 냉난방을 위하여 기존 에어컨을 열펌프로 전환하는 변환기 개발)

  • Song, Heon
    • Journal of the Korean Solar Energy Society
    • /
    • v.31 no.5
    • /
    • pp.77-84
    • /
    • 2011
  • Korea and some other countries located in the northern hemisphere employ the air conditioner for the space cooling in the hot summer season and also some kinds of heaters for the space heating in the cold winter season. Especially in Korea, a great number of air conditioners of about 12,700,000 sets have been used these days. However, they are used for a short operation period of only 58 days a year, which results in the material and economic losses. To solve this problem and employ this system for the emergency shelter, a new conversion unit which could convert the existing air conditioner to a heat pump system for simultaneous heating and cooling was developed in this study, and the thermal performance was tested. The results indicated that the indoor air could be heated from $27^{\circ}C$ to $39^{\circ}C$ by the air conditioner converted to a heat pump system with the ambient temperature variation of $-10^{\circ}C{\sim}10^{\circ}C$, and cooled from $20^{\circ}C$ to $15^{\circ}C$ by the converted system with the ambient temperature variation of $20^{\circ}C{\sim}35^{\circ}C$. And also the heating COP increased from 3.3 to 5.3 in case of the heat exchange of the super cooling(HESC) circuit and from 3.0 to 4.0 in case of the By-pass with the ambient temperature variation of $-10^{\circ}C{\sim}10^{\circ}C$, respectively, whereas the cooling COP decreased from 3.1 to 2.1with the increase of the ambient temperature from $20^{\circ}C$ to $35^{\circ}C$.

Heat Exchanging Performance as Affected by Arrangement of Heat Exchanging Pipe (열회수장치의 열교환 파이프배치 형식별 열교환 성능)

  • 윤용철;강종국;서원명
    • Journal of Bio-Environment Control
    • /
    • v.11 no.3
    • /
    • pp.101-107
    • /
    • 2002
  • This study was carried out to improve the performance of heat recovery device attached to exhaust gas flue connected to combustion chamber of greenhouse heating system. Three different units were prepared far the comparison of heat recovery performance; A-type is exactly the same with the typical one fabricated for previous study of analyzing heat recovery performance in greenhouse heating system, other two types (B-type and C-type) modified from the control unit are different in the aspects of airflow direction (U-turn airflow) and pipe arrangement. The results are summarized as follows ; 1. In the case of Type-A, when considering the initial cost and current electricity fee required for system operation, it was expected that one or two years at most would be enough to return the whole cost invested. 2. Type-B and Type-C, basically different with Type-A in the aspect of airflow pattern, are not sensitive to the change of blower capacity with higher than 25m$^3$.min$^{-1}$ . Therefore, heat recovery performance was not improved so significantly with the increment of blower capacity. This was assumed to be that air flow resistance in high air capacity reduced the heat exchange rate as well. Never the less, compared with control unit, resultant heat recovery rate of Type-B and Type-C was improved by about 5% and 13%, respectively 3. Desirable blower capacity of these heat recovery units experimented were expected to be about 25m$^3$.min$^{-1}$ , and at the proper blower capacity, U-turn airflow units showed better heat recovery performance than control unit. But, without regard to the type of heat recovery unit, it was recommended that comprehensive consideration of system's physical factors such as pipe arrangement density, unit pipe length and pipe thickness, etc., was required for the optimization of heat recovery system in the aspects of not only energy conservation but economic system design.

Evaluation of a Ground Heat Exchanger Appropriate for the Site of the Third Stage Construction of Incheon International Airport (인천국제공항 3단계 건설부지에 적합한 지중열교환기 시스템 평가 연구)

  • Cho, Nam-Hyun;Song, Jung-Tae;Yoon, Seok;Lee, Seung-Rae
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.5
    • /
    • pp.23-33
    • /
    • 2015
  • In the present study, a ground heat exchanger was installed for each heat source in the system at the site to evaluate ground heat conductivity, constructability, and economic feasibility; the factors considered in the study included ground heat, groundwater, fillers (such as bentonite and pea pebbles) and the shape of the heat exchange pipe (e.g., U and D-U). The aim was to determine the ground heat exchanger appropriate for the geothermal system in the 3rd-phase construction of Incheon International Airport. A comparative cost analysis of the initial costs based on the above information showed that although the initial costs of the regular vertical closed loop-II and modified vertical closed loop were lower than those of the regular vertical closed loop-I, they could not be expected to deliver high economic efficiency from the viewpoint of constructability (filler injection, heat exchange pipe insertion). The initial costs proved to be higher in the case of Geohil.

A Study on the Optimal Design and Performance Analysis of the Solid-Gas Chemical Heat Transformer (고-기 화학열변환기의 최적설계 및 성능해석에 관한 연구)

  • Choi, S.H.;Lee, S.I.;Baek, I.H.;Choi, I.S.
    • Applied Chemistry for Engineering
    • /
    • v.8 no.5
    • /
    • pp.729-736
    • /
    • 1997
  • For the recovery of industrial waste heat, a chemical heat transformer based on the reversible reaction between metal chlorides and ammonia gas was designed and a pilot scale unit of 1 kW-1hr was developed. A static calculation, which determined the amount of reacting materials and operating condition of system, and dynamic simulations were performed for the optimal design. The temperature and output power of generator in the system were varying with the amount of salt and heat exchange area. Optimum conditions such as the amount of salt-graphite, apparent density and size of mechanical unit were determined by the dynamic simulation for the system. According to the operating cycle of 4 stages, experimental results of temperature and output power were well agreed with the simulation values. This chemical heat transformer is turned out to be a very promising system for recovery of industrial waste heat because of its effective feature of lifting temperature.

  • PDF

Performance Analysis and Optimal Design of Heat Exchangers Used in High Temperature and High Pressure System

  • Kim, Yang-Gu;Choi, Byoung-Ik;Kim, Kui-Soon;Jeong, Ji-Hwan
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.11 no.1
    • /
    • pp.19-25
    • /
    • 2010
  • A computational study for the optimal design of heat exchangers (HX) used in a high temperature and high pressure system is presented. Two types of air to air HX are considered in this study. One is a single-pass cross-flow type with straight plain tubes and the other is a two-pass cross-counter flow type with plain U-tubes. These two types of HX have the staggered arrangement of tubes. The design models are formulated using the number of transfer units ($\varepsilon$-NTU method) and optimized using a genetic algorithm. In order to design compact light weight HX with the minimum pressure loss and the maximum heat exchange rate, the weight of HX core is chosen as the object function. Dimensions and tube pitch ratio of a HX are used as design variables. Demanded performance such as the pressure loss (${\Delta}P$) and the temperature drop (${\Delta}T$) are used as constraints. The performance of HX is discussed and their optimal designs are presented with an investigation of the effect of design variables and constraints.

A Study on Selection of Pipe Materials Considering EWT (EWT를 고려한 지중열교환기 파이프 선정에 관한 연구)

  • Ryu, Hyung-Kyou;Chung, Min-Ho;Lee, Byung-Seok;Choi, Hyun-Jun;Choi, Hang-Seok
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.10 no.2
    • /
    • pp.13-18
    • /
    • 2014
  • This paper proposes an optimum pipe material (PVC vs. PE) design & selection for open loop ground heat exchangers. Heat exchange efficiency and/or workability, and the need for trench insulation were investigated by comparing EWT (cooling mode) of each system. CFD simulations for the PVC and PE pipe with the same inner diameter show similar EWT. This is because the PVC pipe has a small thickness but a low thermal conductivity as compared to the PE pipe, and thus these two properties tend to offset each other. However, a hypothetically insulated pipe led to a meaningful drop of EWT. This means pipe insulation is of importance in performance of ground heat exchangers. From analyzing climate data and system operation, it is not advantageous to insulate trench pipes due to construction difficulties and ground temperature characteristics that are seasonally varied.

Prediction on gas exchange process of a multi-cylinder 4-stroke cycle spark ignition engine (다기관 4사이클 스파크 점화기관의 가스 교환과정에 관한 예측)

  • 이병해;이재철;송준호
    • Journal of the korean Society of Automotive Engineers
    • /
    • v.13 no.2
    • /
    • pp.67-87
    • /
    • 1991
  • The computer program which predicts the gas exchange process of multi-cylinder 4-Stroke cycle spark-ignition engine, can be great assistance for the design and development of new engine. In this study, the computer program was developed to predict the gas exchange process of multi-cylinder four stroke cycle spark ignition engine including intake and exhaust systems. When gas exchange process is to be calculated, the evaluation of the variation of the thermo-dynamic properties with time and position in the intake and exhaust systems is required. For the purpose, the application of the generalized method of characteristics to the gas exchange process is known as one of the method. The simulation model developed was investigated to the analysis of the branch system of multi-cylinder. The models used were the 2-zone expansion model and single zone model for in cylinder calculation and the generalized method of characteristic including area change, friction, heat transfer and entropy gradients for pipe flow calculation. The empirical constants reduced to least number as possible were determined through the comparison with the experimented indicator diagram of one particular operation condition and these constants were applied to other operating condition. The predicted pressures in cylinder were compared with the experimental results over the wide range of equivalence ratio and ignition timing. The predicted values have shown good agreement with the experimental results. The thermodynamic properties in the intake and exhaust system were predicted over the wide range of equivalence ratio and ignition timing. The obtained results can be summarized as follows. 1. Pressures in the exhaust manifold have a little influence on the equivalence ratio, a great influence on the ignition timing. 2. Pressures in the inlet manifold are nearly unchanged by the equivalence ratio and the ignition timing. 3. In this study, the behaviors of the exhaust temperature, gas in the exhaust manifold were ascertained.

  • PDF