Case study on construction and economic analysis of geothermal heat pump system

지열 시공 사례 및 동절기 경제성 분석

  • Park, Chen-Kwan (Graduate School, Department of Mechanical and Precision Engineering, Gyeongsang National University) ;
  • Shin, Yang-Han (Graduate School, Department of Mechanical and Precision Engineering, Gyeongsang National University) ;
  • Woo, Ju-Sik (Graduate School, Department of Mechanical and Precision Engineering, Gyeongsang National University) ;
  • Jeong, Hyo-Min (Department of Mechanical and Precision Engineering, Gyeongsang National University, Institute of Marine Industry) ;
  • Chung, Han-Shik (Department of Mechanical and Precision Engineering, Gyeongsang National University, Institute of Marine Industry)
  • 박진관 (경상대학교 대학원 정밀기계공학과) ;
  • 신용한 (경상대학교 대학원 정밀기계공학과) ;
  • 우주식 (경상대학교 대학원 정밀기계공학과) ;
  • 정효민 (경상대학교 정밀기계공학과.해양산업연구소) ;
  • 정한식 (경상대학교 정밀기계공학과.해양산업연구소)
  • Received : 2011.04.18
  • Accepted : 2011.05.30
  • Published : 2011.06.01

Abstract

Renewable energy is growing based on low-carbon green energy government policies. According to this policy, geothermal energy is highly efficient and environmental friendly energy which is being recently expanded. However, construction companies are generated disorderly but their ability has not been verified due to the poor geothermal facility which was reported in the media. In the this paper introduce on Busan region's largest geothermal facility, it was confirmed that thermal efficiency of the underground is close to heat exchanger performance. Therefore the study improving the efficiency of underground heat exchange found progressed. The results showed voids between borehole and ground heat exchanger should not be raised. And then geothermal facilities were installed very successfully through the principle grouting operation. As compared to the energy consumption on the basis of operating results energy usage was less than any other heat sources.

Keywords

References

  1. Ministry of Knowledge Economy, 2007 strategy of new and renewal energy R&D 2030.
  2. Alyssa K, 2007, Overview Geothermal Generation and Potential, POWER-GEN Renewable Energy & Fuels 2007.
  3. Alyssa K, Diana B, Karl G, 2007, A Guide to Geothermal Energy and the Environment
  4. Burns, K. L. et al, 2000, Status of the Geothermal Industry in Australia, World Geothermal Congress 2008.
  5. Daniel S, Prame C, and Doone W, 2000, Initial Calculations of performance for an Australian HDR Reservoir, World Geothermal Congress 2000, 3907-3912.
  6. H.J. Ahan, Evaluation geothermal heat pump operation performance in office building.