Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.10
/
pp.68-73
/
2006
As in the measurement of ground resistance by using the 3 point fall-of-potential method, it is known that the distance of current electrode should be at the point of showing the plateu on the potential curve. But the problem is that it my be practically impossible to meet the condition in actual sites. For solving such a situation, this paper provides the least distance of current electrode according to the analysis for the test-field measurement showing that it is feasible to measure the ground resistance in the two in current electrode distance as the length of driven-rod type electrode and the some district length of mesh electrode.
Knowledge of ground thermal properties is most important for the proper design of BHE(borehole heat exchanger) systems. The configure type, pipe size and thermal performance of the BHE is highly dependent on the ground source heatpump system-efficiency and instruction cost. Thermal response tests with mobile measurement devices were developed primarily for in-situ determination of design data for Standing Column Well apply. The main purpose has been to determine in-situ values of effective ground thermal conductivity and thermal resistance, including the effect of ground-water flow and natural convection in the boreholes. The test rig is set up on a some trailer, and contains a sub-circulation pump, a boiler, temperature sensors, flow meter and a data logger for recording the temperature and circulation fluid flow data. A constant heating power is injected into the SCW through the test rig and the resulting temperature change in the SCW is recorded. The recorded temperature data are analysed with a line-source model, which gives the effective in-situ values of rock thermal conductivity and thermal resistance of SCW.
Knowledge of ground thermal properties is most important for the proper design of large scale BHE(borehole heat exchanger) systems. The type, pipe size and thermal performance of the BHE is highly dependent on the ground source heatpump system-efficiency and instruction cost. Thermal response tests with mobile measurement devices were developed primarily for insitu determination of design data for large diameter BHE for triple-U spacer apply. The main purpose has been to determine insitu values of effective ground thermal conductivity and thermal resistance, including the effect of ground-water flow and natural convection in the boreholes. The test rig is set up on a some trailer, and contains a circulation pump, a inline heater, temperature sensors, flow meter, power analysis meter and a data logger for recording the temperature, fluid flow data. A constant heat power is injected into the borehole through the tripl-U pipes system of test rig and the resulting temperature change in the borehole is recorded. The recorded temperature data are analysed with a line-source model, which gives the effective insitu values of rock thermal conductivity and borehole thermal resistance of large diameter BHE for spacer apply.
Local heating transportation pipe has sensor and return lines to detect water-leakage. There are impulse and resistance comparison measurement types for a water-leakage detection. The impulse type shows large detection error within a measurement range. Since the resistance comparison type can find a comparative accurate single water-leakage point in the measurement range of heating pipe, it has been used to detect water-leakages these days. However if the multi water-leakages are happened in the measurement range of transportation pipe. the resistance comparison type shows a detection error point by the parallel resistance between a detection sensor line and ground. But the detection error will be minimized by the divided transportation pipe loops. In this research, it suggests the design of remote controlled detection system which can divide a large pipe loop and a possible single water-leakage measurement process in each divided loops.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.19
no.1
/
pp.203-209
/
2019
In this work, a new land-specific resistance measuring device (GM) and a measuring probe (Grounding Rod) are connected to the WENNER quadrant as power-line communication (PLC). In groups of two (P1,P2) probes, five to ten probes are installed in series on the ground at intervals of 1m, 2m, 4m, 8m, and 16m, respectively. If the PLC signal from the GMD is detected by the receiver of the Probe 1 (P1) for measurement, the minute voltage and current for measurement flow from the PSD (power supply) attached to the probe to the ground, and then, through the soil between P1 and P2, enters the Probe 1 (P2). The resistance value is then measured by the principle of voltage drop due to ground resistance. Measure the earth resistance every T seconds up to 1 trillion and store the measured data on the Arduino Server mounted on the main equipment. Stored measurement data can be derived from formulas by Ohm's Law and from inherent resistance (here,). Data obtained in real time will be linked to CDGES programs installed on Main PC, enabling data analysis and real-time monitoring of the ground environment on land. In addition, a three-dimensional display is possible with 3D graph support by identifying seasonal characteristics such as temperature and humidity of land (soils). The limitations of the study will require specific application measures of Test Bed for commercial access to a model that has been developed and operated experimentally.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.23
no.1
/
pp.36-40
/
2009
Concrete poles(CP) are popular supports for distribution lines. Various types of grounding electrode, such as copper-clad rods, have been used to maintain CP's ground resistance under the required value. The buried part of CP can also have structural grounding effect because of its iron reinforcing rods inside CPs. In this paper, we measured the total ground current injected into CP ground while measuring the ground current splitting to the metal electrode as well as the total injecting current. By this, it was able to measure the ground current splitting to CP structure. Based on the measured results, interrelationship between ground resistance of metal electrodes and current split factor to CP structure was analyzed.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.15
no.2
/
pp.97-104
/
2001
The effects of the position of potential probe on the measurements of the ground resistance in the fa11-of-potential method are described. The ground resistance is theoretically calculated by applying the 61.8[%] rule, and then the potential probe is located on the straight line between the grounding electrode to be measured and the current probe. However, sometimes the grounding electrode to be measured and the measuring potential and current probes in on-site test might not be arranged on the straight line with adequate distance because there are building, roadblock construction and other establishments. Provided that the grounding electrode to be measured and the measuring potential probes are out of position on the straight line, the measurement of the ground resistance classically falls into an error and the measured ground resistance should be corrected. In this work, measurements were focused on the grounding electrode system made by the ground rods of 2.4 m long. The measuring error was increased with increasing the angle which is made by the 3-points of the grounding electrode to be measured, the potential anti current probes, and it was a negative. That is, all of the measured ground resistances ware less than the true ground resistance.
Concrete poles(CP) are popular supports for distribution lines. Various types of grounding electrode, such as copper-clad rods, have been used to maintain CP's ground resistance under the required value. The buried part of CP can also have structural grounding effect because of its iron reinforcing rods inside CPs. In this paper, we measured the total ground current injected into CP ground while measuring the ground current splitting to the metal electrode as well as the total injecting current. By this, it was able to measure the ground current splitting to CP structure. Based on the measured results, interrelationship between ground resistance of metal electrodes and current split factor to CP structure was analyzed.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.1
/
pp.713-719
/
2015
The change in induced voltage according to the relationship of ground connection between the aluminum sheath layer and a conductor pair in a general telecommunication cable is analyzed. When a measurement is practiced under the condition of separated sheath grounds with an averaged ground resistance of $42.6{\Omega}$, the induced voltage decreases 10 % to the induced voltage without sheath grounds. The induced voltage decreases approximately 50 % in the case of a one-sided common ground and decreases by more than 90 % in the case of a both-sided common ground. This experimental result is similar to the values calculated using the methods of the ITU Directives. In addition, according to a comparison analysis utilizing this ITU method, the measurement error range will be below 10 % in the state of ground resistance of central office less than $10{\Omega}$ and for the terminal side with $100{\Omega}$ less or more.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2008.10a
/
pp.193-196
/
2008
In these days, large structures are constructed and bonded with ground grid Because the distances between mesh and auxiliary electrodes are not enough in downtown areas, it is very difficult to measure the ground resistance of large scale grounding electrode systems. Actually the auxiliary electrodes for test are installed in grounding grid. This paper present the experimental results of ground resistance and impedance according to the location of auxiliary electrode. As a result, we get much lower resistances and impedances than real values the auxiliary electrodes are placed in the ground grid. In case that the auxiliary electrodes are located in the ground grid the resistances are very low and reactance only is inductive component.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.