• Title/Summary/Keyword: earth-work

Search Result 622, Processing Time 0.024 seconds

Recovery of Rare Earth Metal from Used Automotive Three-Way Catalyst (자동차용 폐 삼원촉매로부터의 희귀금속 회수공정 기술 동향)

  • Hong, Yeon Ki
    • Journal of Institute of Convergence Technology
    • /
    • v.1 no.1
    • /
    • pp.13-17
    • /
    • 2011
  • The car industry is one of the technological applications which more rare earth metals employes as three-way catalysts. Therefore, the recovery of rare earth metals from the used automotive three-way catalysts could be important source to obtain these metals. This work presents the analysis of market and demand for rare earth metal in automotive three-way catalyst and introduces the dry and the wet processes for the recovery of rare earth metals from used three-way catalyst. Finally, the alternative methods to conventional wet processes was simply suggested based on the economic and ecological point of view.

  • PDF

The Ground Reinforcement on Daylight Collapsed Block in Driving Work at the National Road No. 3 Line (국도 3호선 터널건설 공사 중 붕락구간에 대한 지반보강)

  • 천병식;정덕교;이태우;정진교
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.02a
    • /
    • pp.14-22
    • /
    • 1999
  • Daylight collapse have been occurred by about 6.$^{0}$ m deep at ground surface which connected to the ground surface and excessive overbreak have been occurred by the space and height of 3.$^1$~6.$^2$m at crown head part of the tunnel during tunnelling of lower-half part after completing upper-half part on tunnelling of a phyllite mountain by NATM method at the construction work of two way-double track national road. This study is a successful illustration case of earth improvement by confirming structural safety of the tunnel in a whole through solving the cause of the tunnel collapse and the work have completed successfully through applying such earth strengthening method as cement mortarㆍcement milk injection, S.G.R, steel pipe reinforced multi-step grouting etc.

  • PDF

The Effect of Remedial Works to Control the Leakage Problem in Earth Fill Dam by Compaction Grouting (콤팩션 그라우팅에 의한 흙댐의 누수복원 공사효과 분석)

  • Chun, Byung-Sik;Lee, Yong-Jae;Chung, Ha-Ik
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.11
    • /
    • pp.13-23
    • /
    • 2006
  • The sinkhole and leakage in dam core were detected at one of earth fill dams in Korea. The damage areas in the core of the dam were repaired by compaction grouting method. This study is to evaluate compaction grouting activity by in-situ and laboratory experiments before, during and after the remedial work. The intensive site investigation and geophysical survey were conducted during and after the compaction grouting work. The compaction grouting work was carried out for the damaged dam core between June 16 and August 24, 2000. The leakage reduction generally occurred in the core of the dam after the remedial work. The use of compaction grouting was considered the proper countermeasures for repairing the damaged dam. It shows that the loose or voided zones have been properly filled and the leakage has been reduced by about 96% of that before the treatment of the remedial work performed at dam core by compaction grouting.

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • v.11 no.2
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

The Analysis of the Important Problems on Designing and Constructing Earth Retaining Structures (지반굴착 흙막이 구조물 설계 및 시공시 중요문제점 분석)

  • Lee, Song;Kim, Ju-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.2
    • /
    • pp.167-174
    • /
    • 2002
  • Earth retaining structure is constructed structure in order to construct a multistoried building, the subway, a subterranean downtown for effective use and obtainments of the limited ground. Recently, many kinds of research have been actively developed for a standardization and a database on designing and constructing of bridge, tunnel, road. With the works of database construction of that, many kinds of data with respect to statistics is cumulated. However, Database work of designed and constructed earth retaining structure in the construction field is wholly lacking and lagged behind in the works of database construction. This paper suggested classification system on indication data in connection with designing and constructing earth retaining structures a hundred fields. On the basis of that, code work with classification system was practised and DB program of indication data in connection with designing and constructing earth retaining structures was developed.

Construction of Exchange Table of Earth Quantity for Forest Road Plan (임도설계용(林道設計用) 토량환산표(土量換算表)의 제작(製作))

  • Ma, Sang Kyu
    • Journal of Korean Society of Forest Science
    • /
    • v.76 no.4
    • /
    • pp.348-356
    • /
    • 1987
  • A new simple method to estimate the earth quantity which is basic data for making the plan of mountain forest road is tried to develop as one of ways to reduce time cost of plan making. The zero-line surveying method, the concept of 2/3 road width in cut-away part and of same quantity between cut-away and fill-up earth which are the backgrounds to develop this method is introduced and explaned also it's theoritical propriety. Under the precondition which have to apply above concepts for constructing the mountain forest road the exchange table for estimating the earth quantity is made like table 3 and 4 through being calculated by a trigonometric function. Table 3 can be used to estimate the earth quantity on the cut-away road-width according to slope of terrain and different road-width, and table 4 can be applied to calculate the quantity of cut-away earth when to know the road-width of cut-away. When using these tables the performance of field surveying and office work for road plan will be highly increased.

  • PDF

STABILITY OF ASTEROID MOTIONS

  • KOZAI YOSHIHIDE
    • Journal of The Korean Astronomical Society
    • /
    • v.29 no.spc1
    • /
    • pp.351-354
    • /
    • 1996
  • In this paper it is explained how most of asteroids can avoid very close approach to Jupiter, to the earth for earth orbit crossing asteroids, and to Neptune for Kuiper-belt asteroids by mechanisms which work also for Neptune-Pluto system. In fact the mutual distance of the planets cannot become very small as the critical argument librates around $180^{\circ}$ because of 2:3 mean motion resonance and the argument of perihelion of Pluto librates around $90^{\circ}$. And it is found that among nearly 40 Kuiper-belt asteroids discovered in recent years $40\%$ have orbits similar to Pluto. For main-belt asteroids the distribution with respect to the semi-major axes has peculiar characteristics and the author tries to explain how their peaks and gaps are created. It is also found that $30\%$ of 80 earth orbit crossing asteroids which have minimum perihelion distances less than 1.04AU have no chance to collide with the earth. Still $30\%$ of them have a few probability to collide with the earth as they have dynamical characteristics of short-periodic comets.

  • PDF

A Study on the Selection Model of Retaining Wall Methods Using Support Vector Machines (Support Vector Machine을 이용한 흙막이공법 선정모델에 관한 연구)

  • Kim, Jae-Yeob;Park, U-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.118-126
    • /
    • 2006
  • There is a greater importance for underground work designed and built in the urban areas when it comes to considering the cost-effectiveness and the period of construction commensurate with an increasing trend of skyscrapers. At this stage of underground work, it's extremely necessary to choose a proper earth retaining method. Therefore, the study has suggested the rational retaining wall method by developing the support vector machine(SVM) model as a tool to choose a proper retaining wall method applied at the stage of selecting the earth retaining method. In order to develop the SVM model, the binary SVM classifier is expanded into a multi-class classifier. and to present the feasibility of our SVM model, we considered 129 projects. Applying the 'SVM Model' developed in the study to the designing and developing stages of the earth retaining work will contribute to the successful outcomes by decreasing any changes of design from implementing the earth retaining.

A Study on the Change of Work and Improvement in the Private Forest Road of Chungcheongnam Province (충청남도 민유임도에 적용된 공종의 변화 및 개선방안에 관한 연구)

  • Lee, Joon Woo;Kim, Ju Baek;Choi, Yeon Ho;Kim, Myeong Jun;Park, Bum Jin;Park, Jong-Min
    • Journal of Forest and Environmental Science
    • /
    • v.23 no.1
    • /
    • pp.21-28
    • /
    • 2007
  • In my study, I analysed and criticised the change of applied works based on a design drawing of a private forest road in Chungchengnam province from 1990 to 2003. The aim of this study is to obtain the fundamental resources for establishment the green forest road which is environment friendly. Working expenses of forest road was gradually increased by a business year. In particular, the working expenses dramatically increased in 1999-2000. In change rate of cost of construction by works, earth work rate of the cost of constructions was declined: from 25.4% in 1990-1999, to 18.5% in 2000-2003. However, the total cost of the construction of slope protection work and structural work increased. Nevertheless the rate of the cost of constructions are not increased where as the earth work rate of the cost of constructions were reduced. The rate of the price construction materials and the cost of construction was the main causes which was led by the extension of the standard requirement of applied work and the increase of the materials of applied work. In other word, materials of structural work and slope protection work increased. If the increase of the cost of construction has seem through the increase of contractual materials and extension of the standard requirement would led to weak competitiveness of forest road. Therefore, diverse method of constructions need to apply and a new method should be developed.

  • PDF