Construction of Exchange Table of Earth Quantity for Forest Road Plan

임도설계용(林道設計用) 토량환산표(土量換算表)의 제작(製作)

  • Received : 1987.08.20
  • Published : 1987.12.31

Abstract

A new simple method to estimate the earth quantity which is basic data for making the plan of mountain forest road is tried to develop as one of ways to reduce time cost of plan making. The zero-line surveying method, the concept of 2/3 road width in cut-away part and of same quantity between cut-away and fill-up earth which are the backgrounds to develop this method is introduced and explaned also it's theoritical propriety. Under the precondition which have to apply above concepts for constructing the mountain forest road the exchange table for estimating the earth quantity is made like table 3 and 4 through being calculated by a trigonometric function. Table 3 can be used to estimate the earth quantity on the cut-away road-width according to slope of terrain and different road-width, and table 4 can be applied to calculate the quantity of cut-away earth when to know the road-width of cut-away. When using these tables the performance of field surveying and office work for road plan will be highly increased.

산악지(山岳地) 임도설계(林道設計)의 시간(時間)과 인력(人力)을 절약하는 방법의 일환으로 토량(土量)을 간편하게 산출(産出)하는 방법(方法)을 강구하였다. 이 방법(方法)을 적용하는 이론적(理論的) 배경(背景)으로 0선측량법(線測量法)의 도입(導入)과 2/3 절토노폭개념(切土路幅槪念) 및 절토량(切土量) = 성토량(盛土量) 개념도입(槪念導入)의 타당성을 제시하고 이와같은 원리(原理)들을 산악지림도시공(山岳地林道施工)에 적용한다는 전제하에 삼각함수법을 적용하여 토량환산표(土量換算表)를 표(表) 3과 4와 같이 제작하였다. 표(表) 3은 노폭(路幅)을 0.5m 괄약으로 구분(區分)하여 시공지 경사도별로 절토량(切土量)을 추정(推定)한 것이고, 표(表) 4는 현지(現地)에서 절토폭(切土幅)을 측정하여 절토량(切土量)을 산출(算出)하는데 적용하는 환산계수표(換算係數表)이다. 동표(同表) 등을 적용하면 토량계산(土量計算)을 위한 현지측량(現地測量)과 내업시간(內業時間)은 단축시킬 수 있을 것이다.

Keywords