• 제목/요약/키워드: contractor

검색결과 540건 처리시간 0.024초

의류기업의 협력업체에 대한 신뢰에 영향을 미치는 선행변인 (Examining the Antecedents of Trust in Apparel Manufacturer-Contractor Relationships)

  • 박나리;박재옥
    • 한국의류학회지
    • /
    • 제34권2호
    • /
    • pp.280-290
    • /
    • 2010
  • This study identifies the antecedents of trust in the examination of the effects of the antecedents of trust on trust in apparel manufacturer-contractor relationships. A total of 92 apparel manufactures participated in this study. A factor analysis, Cronbach's alpha coefficient, and multiple regression analysis were conducted for the statistical analysis. Five antecedents of trust were classified: flexibility, opportunistic behavior, communication, specific investment, reputation. Two factors of trust were identified: credibility and benevolence. Flexibility, communication, and reputation of a contractor positively influenced the credibility of an apparel manufacture in a contractor. Flexibility, communication, and specific investment of a contractor positively relate to the benevolence of an apparel manufacture in a contractor. However, the opportunistic behavior of a contractor did not relate to either the credibility of an apparel manufacture or the benevolence in a contractor. The results of this study provide empirical evidence of the impact of flexibility, communication, specific investment, reputation on trust in apparel manufacturer-contractor relationships, and additional insight for selecting contractors that seek to improve trust in apparel manufacturer-contractor relationships.

자동차산업 모기업-협력업체의 산업안전보건 실태조사 (A Survey Study on Occupational Safety and Health Management Activities in Contractor and Supplier Companies of the Car Industry)

  • 고원경;이광길;갈원모
    • 대한안전경영과학회지
    • /
    • 제15권2호
    • /
    • pp.47-53
    • /
    • 2013
  • This study is aimed to investigate the occupational safety and health management of contractor company in the car industry. The questionnaire survey was conducted on the suppliers and contractors of car industry. Data were collected from 10 contractor companies and their 291 contractor companies(each outside and inside company). From the survey result, it was found that the level of all-round safety and health management is above the average. To strengthen the relationship for safety and health management, it is needed that the supplier company employ the person in exclusive charge to support contractor. Also it is needed the active support of the contractor company and needed that the supplier company employ the person in exclusive charge to support contractor. Finally, Many of the problems associated with the safety and health management by strengthening contractor company responsibility will have to be solved simultaneously.

의류기업의 협력업체에 대한 신뢰와 몰입이 기업성과에 미치는 영향 (The Effects of Trust and Commitment on Firm Performance in Apparel Manufacturer-Contractor Relationships)

  • 박나리;박재옥
    • 한국의류학회지
    • /
    • 제34권1호
    • /
    • pp.126-137
    • /
    • 2010
  • This study examines the effects of trust and commitment on firm performance in the apparel manufacturer-contractor relationships. A total of 92 apparel manufactures participated in the study. Factor analysis, Cronbach's alpha coefficient, and multiple regression analysis were conducted for the statistical analysis. Two factors of trust were identified: credibility and benevolence. Two factors of commitment were identified: affective commitment and calculative commitment. Three factors of firm performance were identified: customer service performance, finance performance, and product performance. The credibility of the apparel manufacture in a contractor had a significant positive effect on the affective commitment of an apparel manufacturer and on the calculative commitment in a contractor. Meanwhile, the benevolence of the apparel manufacture on a contractor had a significant positive effect on the affective commitment of an apparel manufacturer on a contractor. The credibility of the apparel manufacture on a contractor was positively related to customer service performance, finance performance, and product performance. The benevolence of the apparel manufacture on a contractor was positively related to customer service performance and finance performance of an apparel manufacture. The affective commitment of the apparel manufacture in a contractor was positively related to service performance. The calculative commitment of the apparel manufacture on a contractor was positively related to finance performance and to the product performance of an apparel manufacture. The results of this study provides practical guidelines toward exchange partners of apparel manufacturers as to how to facilitate from performance in apparel manufacturer-contractor relationships.

위탁생산업체의 특성, 위탁생산업체-도매업체 관계 형성 및 도매업체 만족도에 관한 연구 (Contractor Characteristics, Relationships with Wholesalers, and Wholesalers' Satisfaction)

  • 서민정;이규혜
    • 복식문화연구
    • /
    • 제18권3호
    • /
    • pp.588-598
    • /
    • 2010
  • Purposes of this research were to examine characteristics of contractors and the relationship between contractors and wholesalers of apparel products. Influence of such variables on wholesalers' satisfaction was also assessed. Location, reputation and service were factors of contractor characteristics. Dependence, cooperation and power were three factors that were considered for contractor-wholesaler relationship variable. Survey data from 109 wholesalers located in Dongdaemun Fashion Town in Korea was used for analysis. Empirical results confirmed the importance of service factor of contractor characteristics. Service and location of the contractor had positive influence on cooperation. Location had negative influence on power. Reputation had positive direct influence on wholesaler satisfaction. Cooperation between contractors and wholesalers had significant influence on wholesaler satisfaction.

철도공사를 통해 본 대한제국기 청부업의 초기적 형태 (Primitive Forms of General Contractor Business in the Railroad Construction during the Daehan Empire)

  • 이수연;전봉희
    • 건축역사연구
    • /
    • 제29권5호
    • /
    • pp.17-28
    • /
    • 2020
  • The general contractor business in South Korea settled in the railway construction during the Daehan Empire, but depending on the construction intention and circumstances of the railroad, relationship among employer-contractor-subcontractor and their roles under the system of the construction process had changed. At the time of laying the Gyeongin and Gyeongbu-rail, the Empire, which had no capital and technology, passed all the power and responsibility of the rail laying to the contractor, who was involved in most of the process. After this, the empire tried to lay Gyeongui-railroad without the help of other countries. Japan prepared for the Russo-Japanese War and decided to construct the railway rapidly, and completed the railway in parallel with direct management work and contract work. From that time on, the general contractor would only do the work. During the construction of railroad in Daehan empire, the general contract business system was established. The ambiguous process was sorted out and divided. At this time, subjects in charge of design and construction has been divided. The internal organization of the project owner and the contractor were organaized and specialized.

MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.

  • PDF

모기업 협력업체 산업안전보건관리에 대한 인식 (Recognition of Occupational Safety and Health Management of Contractor Company)

  • 이경용;이관형;오지영;서남규;손두익;갈원모;신문진
    • 한국안전학회지
    • /
    • 제18권4호
    • /
    • pp.136-142
    • /
    • 2003
  • This study is planned to investigate the attitude toward the safety and health management of contractor company. Under the contract based production system, all of activities including safety and health management in the contractor company are depended upon the contract. How to make contract influence the worker's health of contractor company. Worker's health of contractor company can be protected by efforts of company of contract-out and contractor company, especially their safety managers. The modelling of the effective safety and health management system for contractor company should consider the need of safety manager of each company and employer of contractor company. Data is collected from safety managers of 3 contract out compaines as electronic and electrical manufacturing industry and 55 safety manager, 57 employers of their contractor compaines using self administered survey with structured questionnaire. The most of all respondents want to support from the contract out compaines. The most important items supported from contract out company is the information based on the safety information network between each company. Safety manager and employer of contactor company also itemized safety education and training in the supporting system from contract out company. These results can be generalized to survey on the other industries.

철강산업 모기업 협력업체의 산업안전보건 실태조사 (A Survey Study on Occupational Safety and Health Management Activities in Contractor and Supplier Companies of the Steel Industry)

  • 최승주;이광길;신운철;김영선
    • 한국안전학회지
    • /
    • 제27권5호
    • /
    • pp.190-195
    • /
    • 2012
  • This study is aimed to investigate the occupational safety and health management of contractor company in the steel industry. Many companies now only carry out core functions inhouse and ancillary functions have been outsourced. This results in transferring risk to the contractor. The questionnaire survey was conducted on the suppliers and contractors of steel industry. Data were collected from 29 companies and their 240 contractor companies. From the survey result, it was found that the level of safety and health management is above the average. To strengthen the relationship for safety and health management, the supplier should provide more data and design a curriculum to train workers of contractor company. Also it is needed that the supplier company employ the person in exclusive charge to support contractor.

A Study on the Characteristics of "Early Contractor Involvement Method" in Public Project in Japan

  • Tamura, Atsushi
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.42-49
    • /
    • 2022
  • In recent years, Owner, Architects, and Contractor are increasingly collaborating with each other from pre construction phase in construction projects, which is called Early Contractor Involvement (ECI). In Japan, the ECI method has been introduced in several public building projects since 2015. The purpose of this study is mainly to clarify the characteristics of the ECI method in Japan and to compare the contract clauses of the ECI method in the UK and the USA. The results of the survey are as follows. (1) the ECI method was supposed to make it possible to achieve appropriate quality, cost, and construction period by reflecting Contractor's technology and know-how in the design documents and specifications. (2) According to the database, there were 27 cases of the ECI method in Japan from 2015 to 2021, of which 13 cases for which bidding information could be obtained had a variety of technical proposals, mainly VE proposals, depending on the project characteristics. (3), Japan's ECI method has very much in common with SBC + PCSA in the UK. On the other hand, ECI Method in Japan differs from in the UK in that Owner, Architect, and Contractor enter into a partnership agreement, which is similar to ConsensusDocs CD541 in the USA. (4) The ECI method in Japan has the following problems: Owner depends on Contractor for cost control, the division of roles among project members is complicated, and more work from Owner than the DBB method are required.

  • PDF

The existence and uniqueness of fuzzy solutions for semilinear fuzzy integrodifferential equations using integral contractor

  • Lee, Bu-Young;Kwun, Young-Chel;Ahn, Young-Chel;Park, Jin-Han
    • International Journal of Fuzzy Logic and Intelligent Systems
    • /
    • 제9권4호
    • /
    • pp.339-342
    • /
    • 2009
  • In this paper, we investigate the existence and uniqueness of fuzzy solutions for semilinear fuzzy integrodifferential equations using integral contractor. The notion of 'bounded integral contractor', introduced by Altman[1], is weaker than Lipschitz condition.