• 제목/요약/키워드: construction detail

검색결과 769건 처리시간 0.029초

LH 전문시방서의 석고보드 복합패널 관련 개정(안) (Amendment for Plasterboard Partition Wall of LH Construction Specifications)

  • 최수경;윤상천;지석원
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.213-214
    • /
    • 2019
  • In order to apply the drywall system to the interior wall of the post & beam structure, the existing detail drawings and construction specifications must be revised. LH selected drywall systems suitable for post & beam apartment housings and revised their standard detail drawings and construction specifications. This paper describes the major revision of the plasterboard partition wall in the LH construction specifications and standard detail drawings. The main policy of the revision work was to prevent defects by ensuring the construction quality and to eliminate adverse effects on the subsequent processes.

  • PDF

공동주택 지하부위 방수시공 디테일에 관한 연구 (A study on the Construction Detail of Waterproofing in Underground of Apartments)

  • 이정훈;김범수;송제영;김수연;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.215-216
    • /
    • 2017
  • Existing studies highlights the problems about the negative-side waterproofing design of apartment complex underground structures. This study suggests the alternatives for waterproof design construction details of as a solution, and a review on the applicability of this new construction design details through a mock-up construction is provided.

  • PDF

철근콘크리트 기둥의 띠철근에서 135° 갈고리 대체 클립형 연결장치의 시공성 및 비용 분석 (Constructability and Cost Analysis of the Clip-Type Binding Implement Substituting 135° End-Hooked Transverse Reinforcement in Reinforced Concrete Columns)

  • 박경언;윤현도
    • 한국건축시공학회지
    • /
    • 제20권5호
    • /
    • pp.459-469
    • /
    • 2020
  • 이 연구의 목적은 철근콘크리트 기둥에서 띠철근 상세로 이용되는 갈고리 양단 135° 교차시공에 대해 동등이상의 구조적 성능을 확보하면서, 동시에 시공성을 개선할 목적으로 클립형 연결장치를 이용하여 90° 갈고리 띠철근에 결속하는 방법을 제시하였으며, 제안한 클립형 연결장치에 따른 시공성 평가 및 소요비용을 분석하였다. 분석 결과, 기둥 1개 전체 철근 조립하는 데 작업 시간은 클립형 연결장치 사용시 50%의 작업시간을 단축하는 것으로 나타났으며, 비용분석 결과 클립형 연결장치 1개 사용시 절감효과가 가장 효과적이었고, 표준 갈고리 상세 대비 약 32%의 비용 절감효과가 있는 것으로 분석되었다.

해외 화공플랜트 건설사업 위험요인 영향도 분석 (A Study on the Analysis of the Risk Factors for Overseas Plant Construction Projects)

  • 조승연;김용수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 2부
    • /
    • pp.103-108
    • /
    • 2010
  • The purpose of this study is to analyze of the risk factors for oversea plants construction projects. For this study, risk factors data from related literature review, research organization and construction company was researched and classified under each EPC phases. In addition, a questionnaire survey by plant experts was conducted for analysis of risk weight and costs and time impact on each EPC phases. The results of this study are as follows: First, a detail design errors(engineering phase), a equipment procurement plan(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest weight factors. Second, a financing plan(engineering phase), quantity take-off bill(procurement phase), and exchange rate fluctuations(construction phase) were analyzed the highest cost impact factors. Third, detail design errors(engineering phase), a equipment procurement plan(procurement phase), and schedule management errors(construction phase) were analyzed the highest time impact factors.

  • PDF

건설기술진흥법에 따른 안전관리비 세부항목의 특성 분석 (Analyzing the Detail Item Characteristics of Safety Management Expenses Based on the Construction Technology Promotion Act)

  • 이재현;정재욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.277-278
    • /
    • 2023
  • In 2022, construction had a five fold higher accident and fatality rate compared to the overall industry. The Construction Technology Promotion Act requires parties in construction contracts to calculate safety costs following Ministry of Land, Infrastructure and Transport guidelines. Understanding safety expense components is vital for evaluating accident prevention costs and planning anti-accident strategies. A study surveyed safety professionals to analyze the importance and influence of safety management expense components, providing basic data for future research. Survey results highlighted the significance of safety management plans, structural safety assurance, and preventing collateral damage.

  • PDF

PS 강봉으로 일체화된 강합성 라멘교의 개발을 위한 실험연구 (Experimental Study for Development of the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bar)

  • 안영수;정지승
    • 한국안전학회지
    • /
    • 제27권4호
    • /
    • pp.50-61
    • /
    • 2012
  • In recent years, various research and developments to introduce composite bridges of new concept have been performed. The types of integral bridge and portal rigid frame bridge are having advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection has problems such as complexity of construction and increase of the construction cost. A new type of bridge, called prestress integral composite girder(PIC girder) bridge, is proposed in this study, which decreases the cost of construction and improves the efficiency of construction by simplifying the detail of construction for girder-abutment connection. PIC girder bridge has the connection detail in which the steel girder and the abutment are integrated by using the PS bar installed in the connection. In this study, finite element analysis and mock-up load test are conducted to evaluate the propriety of design, the effective of fabrication and structural safety for PIC girder bridge. The adequacy of the PIC giredr bridge is verified by the results of static/dynamic load test and finite element analyses.

원자력 발전설비의 3D 모델 상세화 방안에 대한 기초 연구 (A basic study 3D model advancement method for nuclear power plant)

  • 임병기
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.37-38
    • /
    • 2018
  • BIM(Building Information Modeling) in the architecture, VDC(Virtual Design and Construction) defined CIFE(Center for Integrated Facility Engineering) of Stanford university in USA, and Data-driven design definition issued by TECDOC-1284 of IAEA are doing data-level design generated by 3D CAD technology, integrating and managing related information based on the 3D model, and Using 3D models effectively during nuclear power plant life cycle. 3D model of domestic nuclear power industry is using interference review between design fields, 4D system linked 3D construction model and schedule activity, but the 3D model generated in the design phase is effectively not utilized during the construction, operation, decommissioning. therefore, This study is aimed to suggest 3D model LOD(Level of Detail) advancement method through the analysis of existing literature, 2D drawings, and 3D models throughout nuclear power plant lifecycle.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

시공단계 BIM모델의 적정표현수준 정의를 위한 기초 연구 (A Study for the Optimal Expression Level Definition of BIM Model in Construction Phase)

  • 노혜라;김지윤;이다운;윤석헌
    • 한국CDE학회논문집
    • /
    • 제21권4호
    • /
    • pp.378-388
    • /
    • 2016
  • As the needs for the mega-sized, high-rise and irregular shape of building increase, domestic application of BIM in construction industry is increasing in recent years. In this circumstance, interests in BIM modeling and modeling detail level have been also increased. BIM that is based on a three-dimensions, requires a specific and precise building expressions. And model expression level required for each phase such as design, construction, and maintenance of the construction project could be different as its needs. Because that it is not clear to define the criteria for the expression level of construction BIM model, It is difficult to decide how detail and what to model is appropriate in the practical application of BIM model. It could be the reason why the productivity in construction project became lower and lower. In this study we consider the way how to improve the productivity of BIM and analyze the appropriate representation level of construction BIM model through the experts' survey. The results of study could suggest the basis for an appropriate expression level of construction BIM model.