A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim (Department of Architecture, Kyung Hee University) ;
  • Jungsik Choi (buildingSMART KOREA) ;
  • Inhan Kim (Department of Architecture, Kyung Hee University)
  • Published : 2013.01.09

Abstract

Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

Keywords

Acknowledgement

This research was supported by a grant (Code# '09 R&D A01) from Cutting-edge Urban Development Program funded by Ministry of Land, Transport and Maritime Affairs of Korean government.