Proceedings of the Korean Institute of Building Construction Conference
/
2005.11a
/
pp.121-125
/
2005
For advanced construction safety, it is able to valanced control that are 'Enforcement', 'Engineering', 'Education'. It is central to an existing builders, that system problem about safety management is converted to a substantial and sensible system. Also, participates who are a governments, builders, designers, architects, supervisors with reference to construction project are developed labor saving technique for total system that is included planing, drawing, building, maintaining. And, it is to develop a program what is able to participate in an industry, a school, and an institute with governments that is for training professional for construction safety technique.
Proceedings of the Korean Institute of Building Construction Conference
/
2003.05a
/
pp.133-137
/
2003
Float has been just recognized spare time for disposing of unexpected conditions as by-product of CPM(critical-path-method) calculations, in spite of important method for construction period, taking in material, human supply and cost reducation in construction process management. Also float necessary follow method of contract by ownership problem and effect construct management of use. The purpose of this study was to examine current recognition and application grade of float in construction project. In addition, the study proposes improvement strategies of float application for efficient progress plan and control.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.237-238
/
2016
Rework is a major cause that adversely affects the performance of a construction project, such as schedule delay or cost overrun. In order to prevent rework, research has been mainly conducted to analyze the cause of rework, but limited to quantitatively measure cost of rework and analyze its impact on project performance. Therefore, this paper aims to analyze impact of rework cost using 369 rework items collected from 3 construction site. This research is expected to accurately determine control target of rework and to improve efficiency of business operations in construction project.
The study seeks to cooperate with the investigation of a fire investigation based on public-private partnership. Fire protection systems provide a wide variety of viewpoints from the perspectives of design, construction, management, maintenance, maintenance and maintenance systems at a particular point in time, construction, management, and maintenance systems. What is controversial is that there are illegal activities such as illegal activities of the Patent Office, misconduct of construction work and unreasonable construction of construction works.As a theoretical framework, the present study identified the four key elements of a successful disaster response system : responsiveness, control, professionalism, and bias.
Journal of the Korea Institute of Building Construction
/
v.9
no.2
/
pp.55-61
/
2009
In order to conduct construction projects effectively, the work delay factors would be managed by planned construction schedules. As construction works are delayed ceaselessly, the solution is to select and manage the key factors which delay the work ceaselessly. The subjects of this study were an apartment houses of reinforced concrete structure. Hidden work delay factor were extracted, the surveys were conducted and occurrence, severity and detection of each factor were analyzed. With this result, final orders of priority were fixed and key management factors were deducted and presented.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.11a
/
pp.209-212
/
2009
The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.11a
/
pp.141-142
/
2013
The modular construction method have improved quality, reduction of defects, such as the reduction of air, a number of advantages. It is utilized composite, larger, in skyscraper building already abroad. The domestic, various studies have been conducted on technical matters taller, automation of production, such as process control, but is still inadequate circumstances. Therefore, in this study, is the purpose that you have presented activation measures to investigate and analyze the case of co-housing with a modular construction system of outside, and to make the co-housing of modular construction system of domestic.
The domestic construction industry is becoming larger, high-rise and specialized. However, safety consciousness is still staying in low levels and falling accidents are apt to rise compared to other industries. So, the new way of safety management is required for reducing of the construction falling accidents. In this paper, we evaluate appropriateness of safety management on construction sites utilizing USN using smart safery equipment. Thus, we calculate loss costs of falling accidents considering accident rates and costs of the USN using smart safery equipment installation then compare both calculated costs. This research aims to propose the method for reduction of construction accidents in addition to conventional safety control methods by analyzing the propriety of applying USN using smart safery equipment on construction sites.
Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
International conference on construction engineering and project management
/
2009.05a
/
pp.616-621
/
2009
Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.
International conference on construction engineering and project management
/
2005.10a
/
pp.886-891
/
2005
The frequent maintenance required on some asphalt concrete (AC) pavement sections has made reconstruction with Portland Cement Concrete Pavement (PCCP) a feasible alternative. However, many constructability issues need to be addressed in order to realize the full potential of this alternative. Accelerated paving encompasses three classes of activities: methods to accelerate the rate of strength gain, methods to minimize the construction time, and traffic control strategies to minimize user delay. Three major AC intersections with severe rutting problems were reconstructed with PCCP. The entire reconstruction of each intersection, including demolition of the AC pavement and its replacement with PCCP, took place over a period of three days, starting on Thursday evening and opening the intersection to the traffic on Sunday afternoon. This paper discusses the use of PCCP for accelerated reconstruction of major urban intersections with minimal user and traffic disruption, using innovative construction techniques and traffic management optimization principles and demonstrates that concrete pavements can be constructed efficiently and quickly.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.