• Title/Summary/Keyword: construction control

Search Result 5,207, Processing Time 0.035 seconds

Application of the Measurements Control System to NATM Tunnel Constructed in Urban Area (도심지 NATM 터널에서의 계측관리시스템 적용 연구)

  • 장정범;김용일;김영근;정한중
    • Tunnel and Underground Space
    • /
    • v.5 no.3
    • /
    • pp.193-204
    • /
    • 1995
  • Since the significance of measurements during tunnel construction is not recognized, measurements have not been implemented except for a few very important construction site. As the tunnel construction by NATM increases, the importance of measurements is being emphasized. But, due to the lack of practical experiences and theoretical background in measurements techniques, systematic measurements control system has not yet been established. In this study a measurements control system, successfully used in the urban tunnel construction, is introduced.

  • PDF

A Study on the economic analysis of the standing water level control system (SAL상수위 제어시스템의 경제성 분석에 관한 연구)

  • Hong, Jong-In;Hong, Seong-Wook;Kim, Sang-Won;Yang, Jin-Kook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.281-283
    • /
    • 2013
  • In this paper, standing water level control system and a comparison of existing methods (anchor, PDD, DM) and economic analysis was conducted. 1) Cost PDD method (6%), DM system (4%), and the SAL standing water level control system (4%), except for the anchor system is similar to the construction of three methods based on the portion of the anchor system was analyzed that. 2) construction and maintenance costs compared with the sum of the partial was, anchor system (100%), PDD method (39%), DM system (37%), the SAL standing water level control system (21%), the SAL standing water level control system was identified as the lowest cost method of.

  • PDF

Synchronous Motion Control of Multi-Climbing Hydraulic Robots for High-Rise Building Construction Automation (고층건물 시공자동화를 위한 다중 클라이밍 유압로봇의 운동 동기제어)

  • Hong, Yun-Suk;Chang, Hyo-Whan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.26 no.9
    • /
    • pp.103-111
    • /
    • 2009
  • Multi-climbing hydraulic robots are used to lift construction factory (CF) synchronously for applications in the automation of a high-rise building construction. In this study, synchronous motion controller is proposed for the hydraulic robots, whose strategy is not only to make each robot follow the reference path basically by sliding-mode control, but also to synchronize motions of two adjacent cent robots consecutively by cross-coupled control technique. Simulations are performed by using SIMULINK for a system similar to a practical application that includes unbalance in CF and wind disturbance. The results show that the proposed controller significantly reduces synchronous errors, compared to the individual controller for each hydraulic robot.

Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS. (WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구)

  • Ahn, Jae-Hong;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

A Study on the Setup Model of Safety Management Information System in the Construction Management (건설산업관리(CM)에서 안전관리정보시스템 구축 모델에 관한 연구)

  • 김영수;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.3
    • /
    • pp.45-55
    • /
    • 2003
  • Construction Management(CM) system, which was introduced some years ago to large national construction projects, such as the construction of Incheon New Airport, construction of high-speed railroad and World Cup stadiums, is considered to be still in its early stage and safety at each step of CM is very poorly controlled. In an attempt to improve such inferior safety control of domestic CM, this study analyzed safety control operation system in CM home and abroad and suggested a model for the construction of safety control management information system suitable to the conditions of Korea.

Comparative Performance Analysis of Robot-based Automated Construction System Using a Real Scale Test Project

  • Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.339-349
    • /
    • 2015
  • A large-scale research project to develop a robot-based automated building construction system for steel structures was successfully conducted in South Korea. This paper discusses the results of the real-scale test and the key lessons gained from the testing process. The system was assessed in terms of system productivity, construction cost, quality control, and safety improvements. While the productivity of the automated system showed an improvement of about 9.5%, the construction cost was about six times higher than that of the conventional method. The field test also indicated that the automated system requires more on-site quality control measures. However, because the system can eliminate the causes of various safety accidents, safety levels might be expected to be improved significantly. It is expected that this paper will provide knowledge and insight for developing new systems, and the results of the real-scale test might be useful for other researchers and similar research projects in the future.

Conceptual Design of Ground Control Point Survey Automation Technology Using Drone (드론을 활용한 지상기준점 측량 자동화 기술의 개념디자인)

  • Jae-Woo Park;Dong-Jun Yeom
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.4_2
    • /
    • pp.687-696
    • /
    • 2023
  • In recent construction sites, digital maps obtained through drone photogrammetry have garnered increasing attention as indispensable tools for effective construction site management. the strategic placement of Ground Control Points (GCPs) is crucial in drone photogrammetry. Nevertheless, the manual labor and time-intensive nature of GCP surveying pose significant challenges. The purpose of this study is to design the concept of automated GCPs survey technology for enhancing drone photogrammetry efficiency in construction sites. As a result, the productivity of the automated method was analyzed as 118,894.7㎡/hr. It is over 25% productivity improvement compared to traditional methods. In future studies, economic analysis of automated methods should be studied.

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

Improvement of Memory Efficiency in Hierarchical Control Structure described by SFC (SFC로 기술(記述)된 계층제어 구조에서 메모리 효율 향상)

  • You, Jeong-Bong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.2
    • /
    • pp.126-130
    • /
    • 2006
  • Programmable Logic Controller(PLC) is the most widely utilized and plays an important role in industrial control system. Sequential Function Chart(SFC) is a graphic language which is suitable for describing a sequential control logic in discrete control system. We can design a distribute control construction and a hierarchical control construction in process control system described by SFC. In hierarchical control structure, we construct each subsystems to synchronize a synchronous signal between subsystems, and the command system gives and takes a synchronous signal with subsystems. Therefore, the system has a low memory efficiency and a low system performance. In this paper, we propose the method that improved the efficiency of memory in hierarchical control construction, and confirm its feasibility through an actual example.

  • PDF