• Title/Summary/Keyword: connection cost

Search Result 569, Processing Time 0.024 seconds

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Design and Prototyping of Partial Connection Manager for Mobile Computing Service (이동 컴퓨팅 서비스를 위한 부분 연결 관리자의 설계 및 프로토타입핑)

  • Kim, Pyeong-Jung;Yun, Seok-Hwan;Jin, Seong-Il
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.6
    • /
    • pp.1932-1940
    • /
    • 2000
  • We must solve problems caused by mobile computing environments for supporting efficient mobile computing services. The problem is the use of wireless medium having high error rates and low bandwidth, and the sudden network disconnection to reduce the power consumption of a mobile host and the cost of the network connection. For these problems, we proposed the architecture of the partial connection manager and designed and implemented that in this paper. In particular, The partial connection manager creates the limited number of mobile agents according to priority and sends them in parallel to server systems and combines results of them process rapidly the user request. By applying the proposed partial connection manager to the mobile computing services called cybermarket, we knew that the mobile agent technique could be suited to the mobile computing environment and overcome the partial connection problem caused by eh mobile computing environment.

  • PDF

Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns (시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발)

  • Kim, Seung-Weon;Jung, Hee-Weon;Park, Dae-Yung;Kim, Dong-Gun;Park, Joo-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

Cost Reduction through Shortest Path Connection of Electric Power Line (전선의 최단거리 루트 선정을 통한 공사비용 절감 방안)

  • Lee, Sang-Joong;Yoon, Jun-Young
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.5
    • /
    • pp.34-38
    • /
    • 2011
  • The shorter the electric power line is, the less its cost becomes. In this paper, the Steiner tree is applied to find the shortest path of the electric power line to obtain resultant cost reduction. Up to 18.3[%] of length reduction can be expected compared to conventional method when the lines are connected through the Steiner points, which also can result in appreciable cost reduction.

Experimental Study for Development of the Steel-Concrete Composite Rigid-Frame Bridge Integrated with PS Bar (PS 강봉으로 일체화된 강합성 라멘교의 개발을 위한 실험연구)

  • Ahn, Young-Soo;Chung, Jee-Seung
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.4
    • /
    • pp.50-61
    • /
    • 2012
  • In recent years, various research and developments to introduce composite bridges of new concept have been performed. The types of integral bridge and portal rigid frame bridge are having advantages in bridge maintenance and structural efficiency by eliminating expansion joints and bridge supports. However, the detail of typical girder-abutment connection has problems such as complexity of construction and increase of the construction cost. A new type of bridge, called prestress integral composite girder(PIC girder) bridge, is proposed in this study, which decreases the cost of construction and improves the efficiency of construction by simplifying the detail of construction for girder-abutment connection. PIC girder bridge has the connection detail in which the steel girder and the abutment are integrated by using the PS bar installed in the connection. In this study, finite element analysis and mock-up load test are conducted to evaluate the propriety of design, the effective of fabrication and structural safety for PIC girder bridge. The adequacy of the PIC giredr bridge is verified by the results of static/dynamic load test and finite element analyses.

A Construction Case of Flow Equal Distribution System in Series Connection (직렬 연결구조의 유량균등분배 시스템 시공사례)

  • Jeong, Ung-Sung;Lee, Sung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.64-65
    • /
    • 2017
  • The existing hot and cold water supply system have a few problems such as construct ability, damage of the building, maintenance and the unequal distribution of water supply flow. So the system has needs to be improved and the Flow Equal Distribution System(FEDS) in series connection has been innovated by Idin Lab which relieve the existing problems. Thus, the purpose of this study is aimed to show the merits of FEDS with an real example of construction site of Wirye Terrace, D builder. 1. FEDS enables builders to save construction cost as the system in series connection does not need to equip both allotters and loop piping system. 2. FEDS contains a cartridge of water saving function so it mainly reduce the unequal distribution of flow and sudden temperature deviation of hot water supply at the same time. 3. FEDS allows repairer to maintain the water supply system at the same floor that could get rid of disharmony between dwellers who live the upper/lower story of the same building. Therefore, the FEDS will be applied when the building is remodeled and constructed.

  • PDF

PWM Control Algorithm for 4-Switch Inverter of 3-Phase SRM Drives for Low Cost Application (3상 SRM 구동용 4-스위치 인버터의 PWM 제어 알고리즘)

  • Jeong, Kyun-Ha;Yoon, Yong-Ho;Kim, Young-Ran;Lee, Byoung-Kuk;Won, Chung-Yeun
    • Proceedings of the KIPE Conference
    • /
    • 2005.07a
    • /
    • pp.248-250
    • /
    • 2005
  • This paper suggests a new type of 4-switch inverter for switched reluctance motor drives. 4-switch Inverter topology is studied to provide possibility for the realization of cost of 3-phase SRM drive system. We used Y-connection and two-phase exciting method. For effective utilization of the developed system, a direct current controlled PWM scheme is designed and implemented to produce the desired dynamic. We solve to balance the neutral point of Y-connection by the direct current controlled PWM and examine the performance of proposed system. With the algorithm and developed control scheme, is expected that the proposed system can be widely used in commercial applications with a reduced system cost.

  • PDF

Presenting an advanced component-based method to investigate flexural behavior and optimize the end-plate connection cost

  • Ali Sadeghi;Mohammad Reza Sohrabi;Seyed Morteza Kazemi
    • Steel and Composite Structures
    • /
    • v.52 no.1
    • /
    • pp.31-43
    • /
    • 2024
  • A very widely used analytical method (mathematical model), mentioned in Eurocode 3, to examine the connections' bending behavior is the component-based method that has certain weak points shown in the plastic behavior part of the moment-rotation curves. In the component method available in Eurocode 3, for simplicity, the effect of strain hardening is omitted, and the bending behavior of the connection is modeled with the help of a two-line diagram. To make the component method more efficient and reliable, this research proposed its advanced version, wherein the plastic part of the diagram was developed beyond the guidelines of the mentioned Regulation, implemented to connect the end plate, and verified with the moment-rotation curves found from the laboratory model and the finite element method in ABAQUS. The findings indicated that the advanced component method (the method developed in this research) could predict the plastic part of the moment-rotation curve as well as the conventional component-based method in Eurocode 3. The comparison between the laboratory model and the outputs of the conventional and advanced component methods, as well as the outputs of the finite elements approach using ABAQUS, revealed a different percentage in the ultimate moment for bolt-extended end-plate connections. Specifically, the difference percentages were -31.56%, 2.46%, and 9.84%, respectively. Another aim of this research was to determine the optimal dimensions of the end plate joint to reduce costs without letting the mechanical constraints related to the bending moment and the resulting initial stiffness, are not compromised as well as the safety and integrity of the connection. In this research, the thickness and dimensions of the end plate and the location and diameter of the bolts were the design variables, which were optimized using Particle Swarm Optimization (PSO), Snake Optimization (SO), and Teaching Learning-Based Optimization (TLBO) to minimization the connection cost of the end plate connection. According to the results, the TLBO method yielded better solutions than others, reducing the connection costs from 43.97 to 17.45€ (60.3%), which shows the method's proper efficiency.

A Basic study of Bolt-type Connection Form of Green Frame (그린 프레임 볼트방식 접합형태 비교 기초연구)

  • Kim, Geun-Ho;Lim, Chae-yeon;Na, Young-Joo;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.337-338
    • /
    • 2012
  • As a rahmen structure, the connection among columns of Green frame is divided into three types such as sleeve, coupler (column pre and post installation), and bolt. The bolt type consists of six types according to steel frame shape and each type has different constructability, safety, structural performance, cost, and quality. Therefore, the analysis of comparison among the types is necessary. The objective of this study is to analyze the characteristics according to the shape of six bolt types to select the appropriate connection of Green frame. The results of this study can be used as a basic study for indentifying the characteristics of steel frame on site applying bolt type connection of Green frame. In addition, this study can be applicable to compare and analyze the performance and constructability of six bolt types in detail.

  • PDF

Performance evaluation of EMI interface and multi-channel wireless impedance sensor node for bolted connection monitoring (볼트 연결부 모니터링을 위한 다채널 무선 임피런스 센서노트와 EMI 인터페이스의 성능 분석)

  • Nguyen, Khac-Duy;Lee, Po-Young;Kim, Jeong-Tae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.36-39
    • /
    • 2011
  • In this paper, performance of EMI interface and multi-channel wireless impedance sensor node is evaluated for SHM on bolted connection. To achieve the objective, following approaches are implemented. Firstly, an interface washer is designed to monitor loosened bolt through the variation in EMI of interface washer due to change in preload in bolt. Secondly, a multi-channel wireless impedance sensor node based on Imote2 platform is designed for automated and cost-efficient impedance-based SHM on bolted connections. Finally, performance of the multi-channel wireless impedance sensor node and the interface washer are experimentally validated for a lab-scale bolted connection model. A damage monitoring method using RMSD index of EMI signatures is utilized to examine the strength of each individual bolted connection.

  • PDF