• Title/Summary/Keyword: concrete tunnel

Search Result 600, Processing Time 0.032 seconds

Detonating Cord as a Controllable Source for Scaled Model Blasting Test (축소모형실험 폭원으로서 도폭선의 폭력조절)

  • Yang, Hyung-Sik;Kim, Jong-Gwan;Choi, Mi-Jin;Choi, Byung-Hee;Ryu, Chang-Ha
    • Tunnel and Underground Space
    • /
    • v.17 no.4
    • /
    • pp.295-300
    • /
    • 2007
  • A method using detonating cord was suggested to control the blasting source for scaled model test. Blasting of 5 concrete block was carried out to verify the method. It was proved that blasting power can be controlled by suggested method. It seemed to be reasonable to use the reduction ratio based on the explosion heat.

Disaster Assessment for the Civil Infrastructure through a Technique of Crack Propagation (변상진전기법을 이용한 토목구조물 피해평가)

  • Park, Si-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.907-910
    • /
    • 2010
  • This study has developed a numerical analysis technique newly which can evaluate the damage propagation characteristics of civil infrastructures. To do this, numerical techniques are incorporated for the concrete members up to the compressive damage due to the bending compressive forces after the tensile crack based on the deformation mechanism. Especially, for the compressive damage stage after the tensile crack, the crack propagation process will be analyzed numerically using the concept of an equivalent plastic hinged length. Using this concept, we investigate the reasonability of the developed module by comparing commercial program for the tunnel structure. It can be established from this study that section forces, such as axial forces and the moment cracks takes place, can be related to the width of the crack making it possible to analyze the crack extension.

  • PDF

Prediction of ling concrete thickness for cable tunnel by GPR and impact-echo method (지중레이다와 충격반향기법에 의한 지하 통신구 터널의 라이닝 두께 추정)

  • Kim Hyung-Woo;Han Jin-Woo;Choi Kwang-Chul;Kang Ho-Kyung;Park Jong-Ho
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.382-384
    • /
    • 2003
  • 지하 30m 암반에 건설된 통신구 터널의 안전성을 검토하기 위하여 콘크리트 라이닝 두께를 지중레이다(Ground Penetrating Radar)와 충격반향기법(Impact-Echo Method)으로 추정하였다. 지중레이다에 의한 콘크리트 라이닝 단면의 연속적인 화상으로부터 라이닝 두께의 상대적인 변화를 파악하였으며, 라이닝 두께가 얇은 구간은 충격반향 기법에 의해 일정 간격으로 두께를 추정하였다. 터널 천장의 라이닝 두께는 31.85cm, 좌측 및 우측 측벽부의 라이닝 두께는 각각 32.45cm. 32.97cm로서 설계 값인 30cm와 비교적 잘 일치하는 것으로 파악되었다. 지중레이다와 충격반향기법을 조합한 본 방법은 터널 라이닝 콘크리트 두께를 추정하는데 있어서 매우 효율적이고 신뢰성 있는 방법으로 분석되었다.

  • PDF

Experimental analysis of aerodynamic stability of stress-ribbon footbridges

  • Pirner, Miros;Fischer, Ondrej
    • Wind and Structures
    • /
    • v.2 no.2
    • /
    • pp.95-104
    • /
    • 1999
  • The dynamic properties of one-span or multi-span reinforced concrete footbridges of catenary form (see e.g., Fig. 1) include the very low fundamental natural frequency, usually near the step-frequency of pedestrians, and the low damping of bending vibrations. The paper summarized the results of model as well as full-scale measurements with particular reference to the influence of torsional rigidity of the stress-ribbon on the magnitude of aerodynamic response, the results of measurements on footbridges of catenary form being completed by results obtained on footbridges of some other types. Additionally the influence of the local broadening of the bridge deck on the bridge response was tested. Starting from these results the criterion has been derived for the decision, whether the flutter analysis is necessary for the design of the footbridge.

Study on the Interior Noise of Subway Train (도시철도 전동차 객실 소음에 관한 연구)

  • Choi, Yong-Woon;Koo, Jeong-Seo;You, Won-Hee;Koh, Hyo-In
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1105-1113
    • /
    • 2008
  • Subway is used as a useful transportation method to solve the metropolitan traffic problem for its advantages of being not only accurate, safe and massive, but also of not producing any exhaustion gas in compare with the other ground transportation systems. However, noise inside the car due to concrete based rail track and tunnel structure has become a social problem. So, an analysis on the noise characteristics according to their routes and locations was made on the basis of the actually measured results from the trial run.

  • PDF

The Thermal conductivity analysis and performance evaluation on the pavement applying geothermal snow melting system (지열 융설시스템을 적용한 포장체의 열전도분석 및 구조안전성 검토)

  • Lee, Seung-Ha;Park, Jeong-Sik;Lee, Seok-Jin;Kim, Bong-Chan
    • Journal of the Korean Society for Geothermal and Hydrothermal Energy
    • /
    • v.6 no.1
    • /
    • pp.17-22
    • /
    • 2010
  • A sliding accident on the road have a high percentage by road freezing, especially, it is often appeared at bridges and tunnel of freezing areas. Thus, the stability of road operations is enhanced by preventing a partial freezing phenomenon. According to the geothermal snow melting system analysis, a pattern of thermal conductivity is found out about pavement materials of concrete and asphalt when it is buried. For the feasibility study on geothermal snow melting system, analysis of the ground melting point when operating system, life evaluation of pavements and safety evaluation of pipes are performed.

Estimation of fire Experiment Prediction by Utility Tunnels Fire Experiment and Simulation (지하공동구 화재 실험 및 시뮬레이션에 의한 화재 설칠 예측 평가)

  • 윤명오;고재선;박형주;박성은
    • Fire Science and Engineering
    • /
    • v.15 no.1
    • /
    • pp.23-33
    • /
    • 2001
  • The utility tunnels are the important facility as a mainstay of country because of the latest communication developments. However, the utilities tunnel is difficult to deal with in case of a fire accident. When a cable burns, the black smoke containing poisonous gas will be reduced. This black smoke goes into the tunnel, and makes it difficult to extinguish the fire. Therefore, when there was a fire in the utility tunnel, the central nerves of the country had been paralyzed, such as property damage, communication interruption, in addition to inconvenience for people. This paper is based on the fire occurred in the past, and reenacting the fire by making the real utilities tunnel model. The aim of this paper is the scientific analysis of the character image of the fire, and the verification of each fire protection system whether it works well after process of setting up a fire protection system in the utilities tunnel at a constant temperature. The fire experiment was equipped with the linear heat detector, the fire door, the connection water spray system and the ventilation system in the utilities tunnel. Fixed portion of an electric power supply cable was coated with a fire retardant coating, and a heating tube was covered with a fireproof. The result showed that the highest temperature was $932^{\circ}c$ and the linear heat detector was working at the constant temperature, and it pointed at the place of the fire on the receiving board, and Fixed portion of the electric power supply cable coated with the fire retardant coating did not work as the fireproof. The heating tube was covered with the fireproof about 30 minutes.

  • PDF

Drainage system for leakage treatment of cement concrete structure in underground (콘크리트 지하구조물 누수 처리를 위한 유도배수시스템)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.573-585
    • /
    • 2019
  • The objective of this study is to propose the drainage system that has been improved the workability, waterproofing and drainage performance to treat the leakage from the cement concrete structures in underground. It is improved that the pipe for conveying ground leak in the existing drainage system had the problem in workability and waterproof. The drainage systems with the improved pipe for conveying ground leak were constructed in conventional concrete lining tunnels to evaluate the workability, waterproofing and drainage. The waterproof and the drainage performance of the drainage system was evaluated by injecting 1,000 ml of red water in the back of the drainage system at 3 weeks, 6 weeks, 9 weeks, 11 weeks, 14 weeks, 17 weeks and 23 weeks. During 6 months of field performance test, the average daily temperature of the tunnel site was measured from $-12.4^{\circ}C$ to $19.7^{\circ}C$. The daily minimum temperature was $-17.2^{\circ}C$ and the daily maximum temperature was $26.7^{\circ}C$. There was no problem in waterproof and drainage performance on the pipe for conveying ground leak and the drainage system during 6 months for field performance test. It is concluded that the improved drainage system can be applied to various cement concrete underground structures where leakage occurs, and has little seasonal effect.

A Study on the Safety Inspection System Improvement of Agricultural Reservoir Considering Fill-Dam Characteristics (필 댐의 특성을 고려한 농업용 저수지 정밀안전진단체계 개선 연구)

  • Lee, Chang Beom;Jung, Nam Su;Park, Seong Ki;Jeon, Sang Ok
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.58 no.4
    • /
    • pp.1-8
    • /
    • 2016
  • In 2008, 17, 596 dams and reservoirs are scattered across South Korea, and 17, 505 of them (99.5 %) are used for agriculture and 99.3 % are fill dam types. This study aimed to review literature related to the precise safety diagnosis system for agricultural reservoirs established by Korea Rural Community Corporation (KRCC) and analyze problems of its evaluation method. And then, it proposed ways to improve the system including a modified diagnosis system, which was applied to pilot districts in order to verify the utility. For assessment model development of agricultural reservoir, we reviewed status of precision safety inspections systems of agricultural reservoir. There are many problems such as assess agricultural reservoir not by sheet which used in fill dam but by block which used in concrete dam construction and diversion tunnel which main element in reservoir levee is treated as water intake facility. For considering diversion tunnel in reservoir levee, previous precision safety inspection systems which summed in separated phenomenon, separated element, separated site, separated facility was change to new systems which summed in site, phenomenon, element, and facility. Compared results of previous inspection system calculated total assessment index (Ec) with new system calculated total assessment index (Ec) are not show statistical difference.

Structural Analysis of Cheju-style Plastic Greenhouse Model for Crop Growing Based on the Wind Load (풍하중을 고려한 제주형 작물재배용 비닐하우스모델의 구조해석)

  • 민창식;김용호;권기린
    • Journal of Bio-Environment Control
    • /
    • v.7 no.3
    • /
    • pp.181-190
    • /
    • 1998
  • An elastic analysis under wind load was performed for the double layered plastic greenhouse model developed particularly for minimizing damages under typhoons at Cheju Citrus Research institute in Seagipo city. General EVA film was used for the inner covering and the developed special film which would break the wind pressure down was used for the outer covering. The wind tunnel test showed this special film reduced the wind speed up to 86 to 98% under well controlled situation. Based on the elastic analysis performed in the study, the behavior of the greenhouse was changed significantly due to the boundary conditions. Not like other researchers before we applied dead load of the concrete support to the ground pipe and fixed support boundary conditions at the 4 corner pipes. The analysis shows that the greenhouse was lifted and pulled the pipe out of the ground due to the sucking wind pressure. The behavior of the greenhouse was quite similar to that one real greenhouse failure. Therefore, not only we need to find the realistic boundary conditions for the supports, but also need to find how to rest the pipe supports on the ground without economic loss.

  • PDF