Recently, research has been actively conducted for getting interested in unit module housing. However, the domestic unit modular housing research in the early stages yet, so the major process for research is lacking. Explore all these reasons fit with domestic unit housing development this paper, focusing on the process of shipping cargo by truck, transport unit module was studied. The purpose of this paper is to present new ideas and derive the direction of the development of the equipment safely and effectively fixed to the unit module of the transport unit module that will be helpful in the development of the equipment required for the transport process of the next unit module.
The unit modular system is a type of prefabricated construction method that completes the building by uniting the modular units on site by transporting the unit module structure manufactured in the factory to the site. Since the unit module structure is not only the frame but also the finished form including the inner and outer materials, it is most likely to be brought into the field. Therefore, not only the damage of the inner and outer materials but also deformation of frame structure due to the vibration generated during the transportation of the vehicle, And it is necessary to take appropriate methods when transporting the module structure. However, there are no methods to prevent modular structure damage due to vehicle vibration in domestic and foreign modular transportation guidelines or standards. In this study, we investigate the vibrations during the vehicle transportation of the module structure through the road driving test, identify the vibration frequency characteristics of the vehicle through FFT analysis, and propose a vibration reduction methods for module transportation.
In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.
모듈러 공법은 전체공정의 50%~90%를 공장에서 제작하여 이를 운반하여 현장에서 설치하는 공법이다. 이 공법은 현장에서 공정을 최소화하고 공장에서 작업을 극대화하여 공기를 단축하고 품질을 향상시킬 수 있다. 모듈러 공법으로 시공하면, 사용연한이 지나 건축물 철거시 일부 또는 전체를 재사용이 가능하기 때문에 건축폐기물까지 줄일 수 있는 친환경적인 공법이라고 할 수 있다. 이 모듈러 공법은 최근 수요가 증가하는 소형주택과 한국전쟁 당시 지어진 전방의 노후화된 병영시설의 교체에 적합한 공법이다. 경량철골을 사용한 모듈러 공법의 국내 시공 사례는 2003년 신기초등학교를 시작으로 군 병영시설에 확대 적용되고 있지만 아직까지 시장 초기단계이다. 따라서 범용 적으로 활용이 가능한 모듈 유닛의 표준과 공정의 표준정립이 시급한 상태이다. 본 연구에서는 기존 독신숙소의 신축 사례를 바탕으로 1인 숙소를 표준 모듈로 가정하고 모듈의 공장제작, 운반, 현장설치의 모듈러 공법의 최단 공사기간내의 최소 공사비 투입이 가능한 표준 공정을 제안하고자 한다. 공장에서 완성품을 제작하는 것이 가장 합리적이지만 운반시 하자발생을 감안한다면 공장제작비율 80%일 때 가장 합리적인 것으로 도출 되었다.
The unit modular method is one in which unit modules are prefabricated at a factory and then constructed at a construction site. That is why an important process, transporting unit module, is added in this method. The purpose of this study is to analyse the load for transporting unit module. The results of the analysis of the driving experimental runs revealed that a maximum load of 15 kN was applied on adapter block type A and a maximum load of 25 kN on adapter block type B. These loads were recorded at the points in the road test when the low-bed trailer was driving through unstable sections of the test such as stopping, restarting, passing over a speed bump or taking a left turn at speed.
The 6th International Conference on Construction Engineering and Project Management
/
pp.704-705
/
2015
Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.
Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.
A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.
The productivity of the construction industry is lower than other industries. Modular system is suggested to enhance the productivity of the construction industry. Modular system is a construction method which installs units manufactured in factory on site. It enables to reduce the duration and improve the quality of the constructions. However, the construction technique applied to modular system has not overcome certain structural problems. To solve the problems and motivate the application of modular system, this study propose the hybrid system which use core to resist a lateral force.
모듈형 구조시스템은 학교 및 아파트 건물과 같은 저층 및 중층 구조물에 점점 더 많이 사용되고 있다. 최근에는 고층 건물에 모듈러 구조시스템을 적용하는 방법에 대한 연구가 수행되고 있다. 고층 모듈러 구조시스템에 대해 충분한 저항력과 경제적인 구조를 제공하기 위해 복합모듈 구조시스템이 제안되었다. 본 연구에서는 일련의 실험을 통해 단위 복합모듈 구조에 적용하기 위한 목적으로 비대칭 복합 기둥의 강도를 평가하고자 하였다. 실험적 연구는 기둥의 세장비, 편심율 및 관통바 유무에 따라 기둥의 강도에 미치는 영향에 중점을 두었다. 단위 모듈구조에 대한 비대칭 기둥단면의 설계식을 제안하였다. 결과로부터, 설계식은 단위 복합모듈 구조에서 비대칭 기둥단면의 적절한 강도 예측을 제공한다는 것을 알 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.