Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

공사규모에 따른 공공건축물 공사비의 산정방법 (Cost Estimating Method of Public Building Construction through Construction Scale)

  • 임진호;박준모;김옥규
    • 한국건축시공학회지
    • /
    • 제15권3호
    • /
    • pp.307-316
    • /
    • 2015
  • 공공건축물공사의 실적공사비제도에서 공사규모에 대한 건축공사비 차이가 크게 나타나므로, 산정방식에서 많은 문제점으로 제기된다. 이에 공사규모에 따라서 선별적, 차등적으로 적용할 예측모형의 개발이 필요하다. 이에 본 연구는 조달청에서 2011~2012년에 발주한 이미 준공된 42개 현장의 실적자료에서 공사규모 $5,000m^2{\sim}20,000m^2$으로 선정하여, 회귀분석을 통해서 추정된 모형을 도출하였다. 이를 근거로 신규공사에 적용하여 검증함으로써 합리적인 건축공사비 예측모형을 제시하였다.

온실구조기준 및 온실공사 품셈을 활용한 스마트 온실 단가 현실화 연구 (Realization of Smart Greenhouse Cost Using Greenhouse Structural Code and Greenhouse Construction Estimate)

  • 이철성;김혁;신승욱;박미란
    • 한국농촌건축학회논문집
    • /
    • 제24권2호
    • /
    • pp.29-36
    • /
    • 2022
  • This study analyzed the effects of building and greenhouse structural code on the structural design and the greenhouse construction cost. The over-design possibility of greenhouse was analyzed when building structural code was applied using standard smart greenhouse drawings. The possibility of decrease in greenhouse construction cost was investigated if the currently applied building structural code was replaced with greenhouse structural code. As a result of comparing the member sizes with the standard drawings, building structural code was designed with 13%~74% more steel than greenhouse structural code. When building construction estimate was replaced with greenhouse construction estimate, it was possible to reduce the total construction cost of the glass greenhouse by 17% and that of the vinyl greenhouse by 14%. Since there is no standard construction estimate suitable for greenhouses, the wage unit price is set excessively, and the construction cost of the smart greenhouse is increasing. In conclusion, it is necessary to establish greenhouse structural code and greenhouse construction estimate to lower the greenhouse construction cost.

Support Vector Machine을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of School Building Projects Based on Support Vector Machine Technique at the Early Project Stage)

  • 신재민;박현영;신윤석;김광희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.153-154
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So many method and techniques have developed that can estimate construction cost using limited information available in the early stage. Among the techniques, Support Vector Machine(SVM) has received attention in various field due to its excellent capacity for self-learning and generalization performance. Therefore, the purpose of this study is to verify the applicability of cost prediction model based on SVM in school building project at the early stage. Data used in this study are 139 school building cost constructed from 2004 to 2007 in Gyeonggi-Do. And prediction error rate of 7.48% in support vector machine is obtained. So the results showed applicability of using SVM model for predicting construction cost of school building projects.

  • PDF

건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구 (A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects)

  • 안성훈;박우열
    • 한국건축시공학회지
    • /
    • 제8권4호
    • /
    • pp.53-59
    • /
    • 2008
  • Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

공동주택 슬래브 두께변화에 따른 공사비 증가 산정 평가 - 바닥충격음 법제화 시행에 따른 표준바닥구조를 중심으로 - (An Evaluation on a calculation the increased cost of construction according to the Depth change of Concrete Slabs in Apartment Building by executing the law of floor impact sound)

  • 이원열;정상민;신덕
    • 한국건축시공학회지
    • /
    • 제5권2호
    • /
    • pp.161-166
    • /
    • 2005
  • This study is to evaluate on the increased cost of construction according to the depth change of concrete slabs in apartment building. When we increased the depth of concrete slab from 150mm to 180, 210mm, the qualitative and cost of construction were calculated by the high-rise type, the unit-size type. As a result of this study, in 32 Pyong type, increment of construction cost rate appeared by $5.1\%$ in case of increase from slab 150mm to 180mm, and $10.0\%$ in case of increase from slab 150mm to 210mm. In 45 Pyong type, Increment of construction cost rate appeared by $5.7\%$ in case of increase from slab 150mm to 180mm, and $10.2\%$ in case of increase from slab 150mm to 210mm. In 55 Pyong type, Increment of construction cost rate appeared by $2.4\%$ in case of increase from slab 150mm to 180mm, and $8.9\%$ in case of increase from slab 150mm to 210mm.

지하철골공사 공사비산정기준 마련을 위한 현장조사 연구 (A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey)

  • 송태석;한상준;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

건축공사감리 문서 기반 연관규칙 및 비용효율성 분석 모델 (A Study on Association Rule and Cost Efficiency Analysis Model Using Construction Supervision Reports)

  • 송태근;유위성
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.389-390
    • /
    • 2023
  • To improve the cost performance of construction sites, various systems and standards are constantly being developed and implemented. Although legal requirements for these system and standard improvements have been increasing, the cost efficiency performance of construction sites remains stagnant. We have digitized documents generated through construction supervision work at 39 building construction sites and proposed a model that can support decision-making in cost efficiency evaluation. This model selects key keywords that are considered to be highly related to cost efficiency by identifying the patterns and relationships of keywords through associated rule analysis and social network analysis using keywords derived from documents. In addition, it is expected to be used as a decision-making aid to determine the cost efficiency of a specific building construction site by establishing a logistic regression model using core keywords. As a systematic database of construction supervision documents and an integrated system of massive data generated by digital technology are established in the future, the accuracy and reliability of the cost efficiency evaluation model are expected to be reinforced.

  • PDF

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF

구조BIM기반 공사비 상세분석 프로세스 구축 (Development of Construction Cost Analysis Process Based on Structural Building Information Modeling)

  • 이승일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.237-238
    • /
    • 2012
  • As a way to improve productivity and integrated project delivery in construction industry, BIM(building Information Modeling) using IT technique is being studied and applied recently. S-BIM application Process was established that enable efficient work through Structural BIM detailed Model in consideration of the collaboration among relevant fields. This study has the objective applying S-BIM technique to enable effective Cost Analysis in initial design phase and presenting the method for practical works using Construction Cost Analysis Process based on S-BIM.

  • PDF