DOI QR코드

DOI QR Code

A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects

건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구

  • 안성훈 (대구대학교 건축공학과) ;
  • 박우열 (안동대학교 건축공학과)
  • Published : 2008.08.25

Abstract

Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

Keywords

References

  1. 김광희, 국내 공동주택 기획단계 코스트 예측 시스템에 관한 연구, 고려대학교 대학원 건축공학과 박사학위논문, 2004
  2. 안성훈, 윤지언, 강경인, 판별분석을 이용한 개산견적 평가모 델 구축에 관한 연구, 대한건축학회논문집(구조계), 제21권, 제9호, pp.169-176, 2005.
  3. 안용선, 송규열, 허정민, 건설사업 초기단계에서 개산견적의 정확성 향상 방안, 대한건축학회논문집(구조계), 제19권, 제 11호, pp.133-140, 2003
  4. 허명회, 양경숙, SPSS 다변량자료분석, 자유아카데미, 2003
  5. Ahuja, H., Campbell, W.J,. Estimating: from concept to completion, New Jersey: Prentice Hall, Inc., 1988
  6. Akintoye, A., Fitzgerald, E., A survey of current cost estimating practices in the UK, Construction Management and Economics, vol.18, pp.161-172, 2000 https://doi.org/10.1080/014461900370799
  7. An, S.H., et al, Application of Support Vector Machines in Assessing Conceptual Cost Estimates, Journal of Computing in Civil Engineering, vol.21, No.4, pp.259-264, 2007 https://doi.org/10.1061/(ASCE)0887-3801(2007)21:4(259)
  8. Ashworth, A., Skimore, R.M., Accuracy in estimating, Occational Paper, Chartered Institute of Building, 1983
  9. Ashworth, A., Cost studies of buildings, third edition, Harlow: Longman, 1999
  10. Brook, M., Estimating and Tendering for construction work (3rd edition), Burlington, MA: Elsevier, 2004
  11. Oberlender, G.D., Trost, S.M., Predicting accuracy of early cost estimates based on estimate quality, Journal of Construction Engineering and Management, vol.127, No.3, pp.173-182, 2001 https://doi.org/10.1061/(ASCE)0733-9364(2001)127:3(173)
  12. Saaty, T.L., Vargas, L.G., Models, methods, concepts & applications of the analytic hierarchy process, Norwell: Kluwer academic publishers, 2001
  13. Saaty, T.L., Decision making for leaders (AHP series, Vol.2), Pittsburgh, PA: RWS Publications, 1995
  14. Serpell, A.F., Towards a knowledge-based assessment of conceptual cost estimates, Building Research & Information, vol.32, No.2, pp.157-164, 2004 https://doi.org/10.1080/0961321032000172373
  15. Skitmore, R.M., Early stage construction price forecasting: A review of performance, Occasional Paper, Royal Institution of Chartered Surveyors, 1991
  16. Trost, S.M., Oberlender, G.D., Predicting accuracy of early cost estimates using factor analysis and multivariate regression, Journal of Construction Engineering and Management, 129(2), pp.198-204, 2003 https://doi.org/10.1061/(ASCE)0733-9364(2003)129:2(198)

Cited by

  1. A Study on the process for Managing the Reliability of Conceptual cost estimates in Building Projects vol.10, pp.2, 2010, https://doi.org/10.5345/JKIC.2010.10.2.133