A Case Study on a Large Scale Borehole Test Blasting to Generate Man-made Earthquake (인공지진 발생을 위한 대규모 시추공 시험발파 사례연구)

  • Jeong, Ju-Hwan;Choi, Byung-Hee;Ryu, Chang-Ha;Min, Hyung-Dong;Choi, Hyung-Bin
    • Explosives and Blasting
    • /
    • v.27 no.2
    • /
    • pp.48-55
    • /
    • 2009
  • In the process of identifying the earth's crust structures to accurately locate the seismic epicenter, man-made earthquakes need to be generated. Such a large-scale ground vibration can be generated by a deep borehole blasting, but it can also accompany some environmental impacts on the surroundings. In this respect, a borehole test blasting was carried out to determine the maximum charge weight that could be used without affecting the various structures around the blast site. Total 400kg of gelatine-type dynamites was used in the test blast. As a result, a prediction equation for ground vibrations was derived from the measured data. With the allowable level of 3.0 mm/s for residential structures, the maximum charge weight was determined to be 677kg if military structures near the site were considered. But if the military structures were not considered, it was found that up to 2100kg of explosives could be used without affecting old houses in the nearby village.

Prediction for Measurement Range of Vibration due to Blasting of Underground Tunneling (발파 진동으로 인한 지표면 진동 계측 범위 산정에 대한 연구)

  • Kong, Suk-Min;Byun, Yoseph;Choi, Sang-Il;Kim, Jeong-Heum;Kim, Chang-Yong;Lee, Seong-Won
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.7-17
    • /
    • 2024
  • Vibrations were measured at the surface of a GTX-A site to assess the impact of blasting on underground tunneling. A numerical analysis was conducted using the same ground and blast conditions as those at the site, accompanied by a comparative analysis of other GTX-A sites. This analysis determined the maximum vibration velocity at regular intervals directly above the blasting point at each site. The results were compared with domestic and international vibration standards to establish the vibration measurement range. The specified vibration measurement locations in domestic regulations—"measuring from the closest part of the structure's foundation to the blasting source, and if conditions make it impossible, measuring from the nearest surface to it"—were evaluated. Furthermore, this study underscores the significance of considering the tunnel drilling depth and soil conditions when selecting a vibration measurement location.

Establishment of a Safe Blasting Guideline for Pit Slopes in Pasir Coal Mine (파시르탄광의 사면안전을 위한 발파지침 수립 연구)

  • Choi, Byung-Hee;Ryu, Chang-Ha;SunWoo, Coon;Jung, Yong-Bok
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.418-426
    • /
    • 2008
  • A surface blasting method with a single tree face is currently used in Pasir Coal Mine in Indonesia. The single free face is usually the ground surface. This kind of blasting method is easy to use but inevitably causes enormous ground vibrations, which, in turn, can affect the stability of the slopes comprising the various boundaries of the open pit mine. In this regard, we decided to make a specific blasting guideline for the control of found vibrations to ensure the safety of the pit slopes and waste dumps of the mine. Firstly, we derived a prediction equation for the ground vibration levels that could be occurred during blasting in the pits. Then, we set the allowable levels of ground vibrations for the pit slopes and waste dumps as peak particle velocities of 120mm/s and 60mm/s, respectively. From the prediction equation and allowable levels, safe scaled distances were established for field use. The blast design equations for the pit slopes and waste dumps were $D_s{\geq}5\;and\;D_S{\geq}10$ respectively. We also provide several standard blasting patterns for the hole depths of $3.3{sim}8.8m$.

A Case Study on the Vibration Characteristics of Tunnel Blasting in Igneous Rock (화성암반에서 터널발파 진동측정치의 분석에 관한 사례 연구)

  • 윤성현;안명석;이광열
    • Explosives and Blasting
    • /
    • v.21 no.1
    • /
    • pp.69-76
    • /
    • 2003
  • Test blasting has been performed with V-cut to investigate the characteristics. Blasting vibrations were measured at two directions, the proceed direction and side direction. Propagation characteristics were determined by regression analysis; square root scaled distance and cube root scaled distance with maximum charge per delay of the blast. Testing result, The cross point was 62m in the allowable vibration velocity of 3mm/sec and 46m In 5mm/sec. Also, vibration level with measuring point was highest and decayed fastest, adapting to cube root scaled distance, for the proceed direction on ground.

A Case Study on the Construction of Concrete Structures in Parallel with Tunnel Blasting (터널발파-구조물 병행시공을 위한 영향평가 연구)

  • 류창하;최병희;김양균;유정훈
    • Explosives and Blasting
    • /
    • v.21 no.4
    • /
    • pp.11-21
    • /
    • 2003
  • An experimental study was carried out in order to reduce the period and cost of construction of Missiryung tunnel, which is a relatively long one 3.6 km long. An allowable vibration level for curing concrete was established based on the extensive case studies done over the world. and assessment was performed on the possibility of constructing concrete structures like lining during tunnel blasting. Attenuation relationships were obtained by processing more than 130 measurement data from a series of tunnel blasting in the site. A Guideline for safe construction work was suggested. To verification, low small concrete blocks with a constant standoff distance were installed in the floor of the tunnel After the blocks were exposed to blast vibrations for 28 days, compressive strength tests were performed on 20 specimens taken from the blocks. It was shown that the suggested guideline was appropriate for the safe construction work at the site.

Comparative Study on the Characteristics of Ground Vibrations Produced from Borehole Blast Tests Using Electronic and Electric Detonators (전자뇌관과 전기뇌관을 사용한 시추공 발파시험에서의 지반진동 특성에 관한 비교 연구)

  • Choi, Hyung-Bin;Won, Yeon-Ho
    • Explosives and Blasting
    • /
    • v.28 no.2
    • /
    • pp.37-49
    • /
    • 2010
  • Ground vibration caused by blasting in the urban area close to structures can give some indirect damage to human body and may lead to structural damage to buildings. At the stage of design or when complaints were filed by residents, the test blasting in borehole, which is most practical for expressing simple vibration wave form quantitatively, is usually chosen for assessing the degree of damage to structures. In this paper, some lessons gained from the application of electronic detonator triggering system in borehole test blasting are presented. The difference in delay time of detonator when borehole is blasted by electronic detonator and electric detonator are discussed. The peak particle velocities measured at the structure embedded in the similar rock layer to main line of tunnel at test site and measured at the road surface just above the tunnel having different overburden layers were analysed to draw their relationship. By comparing the results with those appearing in some published literatures, the usefulness of the borehole test blasting and the importance of delay time of detonator are addressed.

A study on analysis of vibration and crack measurement data on granite-bed rock (화강암 지반에서 진동 및 크랙측정치 분석에 관한 연구)

  • Han, Dong-Hun;Ahn, Myung-Seog;Lee, Kwang-Yeol;Oh, Byung-Sam;Kang, Moon-Gu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.251-260
    • /
    • 2003
  • Tunnel blasting has been performed with V-cut to investigate the characteristics. Blasting vibrations were measured at two directions, the proceed direction and side direction. Propagation characteristics were determined by regression analysis; square root scaled distance and cube root scaled distance with maximum charge per delay of the blast. Testing result, The cross point was 62m in the allowable vibration velocity of 3mm/sec and 46m in 5mm/sec. Also, vibration level with measuring point was highest and decayed fastest, adapting to cube root scaled distance, for the proceed direction on ground.

  • PDF

Flow-Chart for Influence Estimation of Underwater Blasting (수중발파의 영향평가를 위한 Flow-Chart)

  • Park, Sun-Joon;Park, Yeon-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.12 no.5
    • /
    • pp.47-54
    • /
    • 2008
  • In this study, ground vibration values and damping coefficient produced by underwater blasting were measured and analyzed. Equations of vibration, $V=K(SD)^{-0.536}$, were presented from quantitative experiment results. The K Values are classified with 1.507, 2.005 and 2.939 respectively at 50%, 90% and 95% reliability. Also, hydrospace noise in aquafarm and noise in atmosphere as well as ground vibrations were measured, and maximum values of these results were 86.8dB(A), 147.8dB(A), 0.244cm/s, respectively. Equations of hydrospace noise, $SL=293.2SD^{-0.164}$, was presented from quantitative experiment results. Also, the flow-chart for influence estimation and underwater blast design was presented from these results. The results of the study may be applied for the evaluation of the influence on aquafarm as a basic data before having main underwater blasting at construction sites.