• Title/Summary/Keyword: Work. Process

Search Result 8,950, Processing Time 0.035 seconds

A Suggestion for Design Process Improvement to Develop a Design Management Model (설계관리 모델 개발을 위한 설계업무 프로세스 개선 방향 제시)

  • Bae, Jeung-Ik;Shin, Jae-Won;Kwon, O-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.90-98
    • /
    • 2006
  • As management is becoming a focus of a construction industry, conprehensive construction management is needed. Thus a plan of improving a design work process for developing design work capacity is proposed. The plan of improving a design work process based on a information flow for decision makings is expected to be a good ground material of not only smooth communication among stakeholders and information tracing, but also effective management of whole process. Theplansuggestedinthisstudyissummarizedas: (1) Detailed and clear work definition (2) information-oriented work definition (3) Strengthening works related to design management

Work Breakdown Structure(WBS) based on the Steel Box Girder Production Process Model (강교량 제작 프로세스 모델을 기반으로한 WBS구축)

  • Ha, Seung-Ho;Kim, Seok;Kim, Kyoung-Min;Park, Chan-Hyuk;Kim, Kyong-Ju
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.521-525
    • /
    • 2004
  • The objective of this study is to implement a WBS (Work Breakdown Structure) so as to support efficient information management through the construction process of Steel Box Girder Bridge. To meet this requirement. This study performs the analysis of the business process. Through the work, information flows and information management levels are identified. Information management in each manufacturing process was various in its level. For the efficient information management, skating and utilization in schedule, cost, resource, and quality management, it is recommended to utilize a WBS composed of major work section and element structure of the steel box girder.

  • PDF

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • v.15 no.3
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

A Study on the Business Process Model for sustainable Supply Chain (지속가능한 공급사슬(Supply Chain)을 위한 비즈니스 프로세스 모델 연구)

  • Ahn, Kyeong Rim;Lee, Ju Yeon
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.10 no.1
    • /
    • pp.181-193
    • /
    • 2014
  • The environment of supply chains is rapidly changed to global and eco-freindly work process. However, at current environment, it is not easy to grasp work flow and to analyze energy efficiency. Improving energy efficiency and visibility for goods flow can contribute to increases in customer attitudes and reductions in overall production costs Additionally, it can lead to increases in work efficiency and reductions in overall production costs. Until recently, efforts to improve energy performance focused on manufacturing industry. Those efforts have expanded to the supply chain. In this paper, we perform business process modeling about supply chain for visibility and sustainability - information and component flows - from assembly plants to logistics. This paper defines the work and information flows by modeling the underlying logical structures of the supply chain and the business processes that determine impact of visibility and sustainability. We model processes using the modeling methodology specified by UN/CEFACT. This methodology explains business process functionality and business transactions by UML diagram. The output of this paper would be useful in grasping work flow and capturing the used energy.

Status quo Analysis on the Wearing Conditions of Working Clothes according to the Working Environment and Working Process -With reference to the Shipbuilding Industry Workers- (작업환경 및 공정에 따른 작업복 착의실태 분석 -조선업 근로자를 중심으로-)

  • Bae, Hyun-Sook;Park, Hye-Won;Park, Gin-Ah;Kim, Jie-Kwan
    • Fashion & Textile Research Journal
    • /
    • v.12 no.2
    • /
    • pp.203-213
    • /
    • 2010
  • This study examined the wearing conditions of working clothes of shipbuilding industry workers according to the working environmental factors and working process features. It was also investigated the relationship between the wearing sense of working clothes and the overall comfort according to work processes. In the working process of shipbuilding industry, the process of fitting, welding, grinding and painting were chosen by considering work environmental factors, disaster types, hazardous materials, work process features, working clothes and safety equipments of each work categorized. The workers of fitting process usually wore the standard working clothes, while more than 60% of the workers of welding, grinding and painting wore the specialized protective clothes. The hazardous work environmental factors such as noise, heavy dust, high temperature and noxious fumes affected to the workers of fitting, welding and grinding. However, the workers of painting were greatly damaged by organic solvent. The dissatisfaction with the wearing performance of working clothes was highly shown in the sweat absorbency, moisture permeability and body protection. In respect of the correlation between the overall comfort and the wearing sense of working clothes, the satisfaction was decreased in orders of movement comfort> sensual comfort> physiological comfort.

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

Development of Cost Estimation Model Considering Process Risk for Asbestos Dismantling Work (석면해체 공사의 공정 리스크를 고려한 비용 산정 모델 개발 )

  • Noh, Jae-Yun;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.49-50
    • /
    • 2023
  • Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.

  • PDF

A Study on Aircraft Part Management using Smart Work (스마트 워크를 이용한 항공기 부품 관리 방안 연구 -항공기 타이어를 중심으로-)

  • Lee, Doo-Yong;Song, Young-Keun;Jang, Jung-Hwan;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.3
    • /
    • pp.209-215
    • /
    • 2011
  • Currently, 10% of the domestic aircraft accidents and 9% of delays and cancellations were generated due to poor maintenance. Aircraft maintenance work is divided into works in material warehouse and in hangar. In material warehouse, the problem in aircraft maintenance work is occurred when the serial number of parts are identified and entered. In hangar, work order are duplicatively written. In addition, the maintenance information is not shared and then work order is wrong delivered. In this study, we analyzed the maintenance process and the informations that occurs in the material warehouse and hangar for large airline company to solve the problems. And serial numbers are replaced by QR code. And documented work order and manual are handled using the tablet PC. In conclusion, this paper studied smart work of maintenance process about tire parts. We expect to improve the inefficiency of identification of serial number and total maintenance time is reduced by real-time information sharing.

Treemapping Work-Sharing Relationships among Business Process Performers (트리맵을 이용한 비즈니스 프로세스 수행자간 업무공유 관계 시각화)

  • Ahn, Hyun;Kim, Kwanghoon Pio
    • Journal of Internet Computing and Services
    • /
    • v.17 no.4
    • /
    • pp.69-77
    • /
    • 2016
  • Recently, the importance of visual analytics has been recognized in the field of business intelligence. From the view of business intelligence, visual analytics aims for acquiring valuable insights for decision making by interactively visualizing a variety of business information. In this paper, we propose a treemap-based method for visualizing work-sharing relationships among business process performers. A work-sharing relationship is established between two performers who jointly participate in a specific activity of a business process and is an important factor for understanding organizational structures and behaviors in a process-centric organization. To this end, we design and implement a treemap-based visualization tool for representing work-sharing relationships as well as basic hierarchical information in business processes. Finally, we evaluate usefulness of the proposed visualization tool through an operational example using XPDL (XML Process Definition Language) process models.