DOI QR코드

DOI QR Code

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project

하천공사 대표공종의 작업조 구성 및 생산성 정보 개발

  • 유덕열 (충북대학교 토목공학부) ;
  • 박형근 (충북대학교 토목공학부) ;
  • 임형민 (경북대학교 건설방재공학부)
  • Received : 2013.01.22
  • Accepted : 2013.04.09
  • Published : 2013.11.30

Abstract

The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

표준품셈은 공공기관 및 민간기관의 공사비를 책정하는 기본적인 자료로 이용되고 있다. 본 논문은 하천공사에서 선정된 대표공종을 대상으로 새로운 형식의 표준품셈 및 장비의 작업량 산출방식을 제안하고자 한다. 품셈에서 작업조 구성의 정보 및 1일 생산성 정보의 제공이 가능하도록 함으로써 공정계획 단계에서 품셈의 적용성을 향상시키고 장비의 작업량 산출과정을 간소화하여 사용자의 편의성을 증대할 수 있기를 기대한다. 하천공사의 경우 작업조건이라는 변수가 매우 크게 작용하기 때문에 생산성 정보 및 기계의 작업량을 일반화 하는 것은 많은 어려움이 존재하지만 지속적인 생산성 정보와 기계의 작업량 정보를 개선하여 정확도를 향상할 수 있다면 품셈을 통한 공정계획 수립 및 적산과정의 간소화가 가능할 것이다.

Keywords

References

  1. Ahn, J. S., Lee, J. H., Kim, Y. S., Tae, Y. H. and Lim, H. S. (2009). "A study on the improvement of revision process and depreciation method of the construction standard estimating system." Journal of the Architectural Institute of Korea, Vol. 25, No. 8, pp. 195-204 (in Korean).
  2. Chou, J. S. (Rayson) (2005). Item - Level quantity - Based preliminary cost estimating system for highway earthwork, land scape, subgrade treatmenents base, surface courses, Pavement And Traffic Control (in Korean).
  3. Ha, G. J., Choi, M. K., Yi, D. R., Ha, M. S., Ha, J. H. and Kim, J. H. (2007). "A study on the work crew combination for rational cost estimation of construction -Focused on the cement watertight construction of public housing-." Structural System of Conference paper of the Architectural Institute of Korea, Vol. 29, No. 1, pp. 661-664 (in Korean).
  4. Jung, D. K., Tae, Y. H., Ahn, B. R. and Cho, Y. H. (2009). "A study on the standard of cost estimation in the construction of pavement and maintenance." Journal of the Korean Society of Road Engineers, Vol. 11, No. 1, pp. 85-94 (in Korean).
  5. KICT (2009). Construction standard quantity (in Korean).
  6. Kwon, S. C., Kyung, K. S., Kim, K. J. and Park, H. Y. (2007). "Evaluation of economical efficiency of standard quantity per unit by change of resource quantity per unit." Journal of the Korean Society of Civil Engineers, Vol. 27, No. 4D, pp. 517-524 (in Korean).
  7. Park, H. S., Han, Y. L., Huh, Y. A. and Ahn, B. R. (2008). "Estimation of construction equipment production rates: Focus on efficiency rate." Journal of the Korean Society of Civil Engineers, Vol. 28, No. 1D, pp. 67-72 (in Korean).
  8. Rs, M. (2006). Heavy construction cost data (20th Annual Edition).