• Title/Summary/Keyword: Work Method

Search Result 12,639, Processing Time 0.036 seconds

Development of Spent Nuclear Fuel Transportation Worker Exposure Scenario by Dry Storage Methods (건식 저장방식별 사용후핵연료 운반 작업자 피폭시나리오 개발)

  • Geon Woo Son;Hyeok Jae Kim;Shin Dong Lee;Min Woo Kwak;Kwang Pyo Kim
    • Journal of Radiation Industry
    • /
    • v.18 no.1
    • /
    • pp.43-52
    • /
    • 2024
  • Currently, there are no interim storage facilities and permanent disposal facilities in Korea, so all spent nuclear fuels are temporarily stored. However, the temporary storage facility is approaching saturation, and as a measure to this, the 2nd Basic Plan for the Management of High-Level Radioactive Waste presented an operation plan for dry interim storage facilities and dry temporary storage facilities on the NPP on-site. The dry storage can be operated in various ways, and to select the optimal dry storage method, the reduction of exposure for workers must be considered. Accordingly, it is necessary to develop a worker exposure scenario according to the dry storage method and evaluate and compare the radiological impact for each method. The purpose of this study is to develop an exposure scenario for workers transporting spent nuclear fuel by dry storage method. To this end, first, the operation procedure of the foreign commercial spent nuclear fuel dry storage system was analyzed based on the Final Safety Analysis Report (FSAR). 1) the concrete overpack-based system, 2) the metal overpack-based system, and 3) the vertical storage module-based system were selected for analysis. Factors were assumed that could affect the type of work (working distance, working hours, number of workers, etc.) during transportation work. Finally, the work type of the processes involved in transporting spent nuclear fuel by dry storage method was set, and an exposure scenario was developed accordingly. The concrete overpack method, the metal overpack method, and the vertical storage module method were classified into a total of 31, 9, and 23 processes, respectively. The work distance, work time, and number of workers for each process were set. The product of working hours and number of workers (Man-hour) was set high in the order of concrete overpack method, vertical storage module method, and metal overpack method, and short-range work (10 cm) was most often applied to the concrete overpack method. The results of this study are expected to be used as basic data for performing radiological comparisons of transport workers by dry storage method of spent nuclear fuel.

BLOCK DIAGONAL PRECONDITIONERS FOR THE GALERKIN LEAST SQUARES METHOD IN LINEAR ELASTICITY

  • Yoo, Jae-Chil
    • Communications of the Korean Mathematical Society
    • /
    • v.15 no.1
    • /
    • pp.143-153
    • /
    • 2000
  • In [8], Franca and Stenberg developed several Galerkin least squares methods for the solution of the problem of linear elasticity. That work concerned itself only with the error estimates of the method. It did not address the related problem of finding effective methods for the solution of the associated linear systems. In this work, we propose the block diagonal preconditioners. The preconditioned conjugate residual method is robust in that the convergence is uniform as the parameter, v, goes to $\sfrac{1}{2}$. Computational experiments are included.

  • PDF

Modulation Transfer Function (MTF) Measurement for KOMPSAT EOC image data Using Edge Method

  • Song J. H.;Lee D. H.
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.489-493
    • /
    • 2004
  • The Modulation Transfer Function (MTF) is commonly used to characterize the spatial quality of imaging systems. This work is the attempt to measure the MTF for KOMPSAT EOC using the non-parametric method as ground inputs. The spatial performance of the KOMPSAT EOC was analyzed by edge method while in flight using multi-temporal image data collected over test site in Seoul. The results from this work demonstrate the potential applicability of this method to estimate MTF for high spatial resolution satellite KOMPSAT-2 that is being developed to be launched in 2005.

  • PDF

A Scheduling Strategy for Reducing Set-up Time and Work-In-Process in PCB Assembly Line (PCB조립 라인의 준비 시간 단축 및 재공품 감소를 위한 스케줄링 전략)

  • 이영해;김덕한;전성진
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.22 no.1
    • /
    • pp.25-49
    • /
    • 1997
  • Printed circuit board (PCB) assembly line configuration is characterized by very long set-up times and high work in process (WIP) inventory level. The scheduling method can significantly reduce the set-up times and WIP inventory level. Greedy sequence dependent scheduling (GSDS) method is proposed based on the current methods. The proposed method is compared with the current method in terms of three performance measures: line throughput, average WIP inventory level, and implementation complexity.

  • PDF

TOPOLOGICAL METHOD DOES NOT WORK FOR FRANKEL-MCDUFF CONJECTURE

  • Kim, Min Kyu
    • Journal of the Chungcheong Mathematical Society
    • /
    • v.20 no.1
    • /
    • pp.31-35
    • /
    • 2007
  • In dealing with transformation group, topological approach is very natural. But, it is not sufficient to investigate geometric properties of transformation group and we need geometric method. Frankel-McDuff Conjecture is very interesting in the point that it shows struggling between topological method and geometric method. In this paper, the author suggest generalized Frankel-McDuff conjecture as a topological version of the conjecture and construct a counterexample for the generalized version, and from this we assert that topological method does not work for Frankel-McDuff Conjecture.

  • PDF

A Study on the Efficient MES Using Automation in Automotive Module Assembly Line (자동차 모듈조립공정에서의 효율적 MES 인터페이스 모형)

  • Kong, Myung-Dal
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.10
    • /
    • pp.4618-4625
    • /
    • 2011
  • This paper suggests a specific model that could efficiently improve the interaction and the interface between MES(Manufacturing Execution System) server and POP(Point Of Production) Terminal through RFID(Radio Frequency Identification) system in Automative Module Assembly Line. The proposed model shows that the new method by RFID can more efficiently perform to receive work order informations and transmit work performances, compared with the current approach by proximity sensor. As a result of the certain test among the MES server, RFID system, PLC(Programmable Logic controller) and POP terminal, it is noted in case of the automatic control by RFID that the effects of proposed model are as follows; (a) While the processing time per truck for carrying by the current method was 10 minutes, the processing time by the new method was 1 minutes. (b) While the error rate by the current method was 20 %, the error rate by the new method was 1 %.

A Case study of Ground Treatment for Container Terminal Site Formation with Full Dredging and Replacement Method (완전준설 치환공법에 의한 컨테이너 부지조성 사례)

  • Hong, Eui;Sim Dong-Hyun
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.235-247
    • /
    • 2006
  • A ground treatment work for Hongkong container terminal yard is reported as a case study of site formation work with full dredging and replacement method. Ground treatment work adopting surcharge and deep compaction (vibroflotation) were applied to improve the sand creep potential. The sand creep parameter of 0 25% was assumed in design stage and improved up to 0.05% and 0.02% after surcharge and deep compaction respectively

  • PDF

An Overview of Korean Resource-Based Relativ Value Scale (상대가치 개발의 총괄)

  • 김한중;손명세;조우현;박은철;이선희;강형곤;허영주;원종욱;김양균
    • Health Policy and Management
    • /
    • v.5 no.2
    • /
    • pp.202-229
    • /
    • 1995
  • In Korea, Resource-Based Relative Value Scale(RBRVS) is suggesting to the alternative of Korean Medical Fee Schedule. This study developed to methodology of RBRVS applicable to Korean situation and applied to services of internal medicine and general surgery. Our methodology of RBRVS is basically same to Hsiao's. But there are some differences between our method and H냐매's because Korean medical situation differs to American. The first difference is method of measurement of work. The Unit of work in our study is total work including intra-servic work and pre-/post-service work. Secondly, in extrapolation, we use primary data gathered to small group of physician. Tertially, in measurement of practice cost, we directly survey to budget data of hosptials and analyse practice costs by service. Some results are presented in a companion article.

  • PDF

Application of Work Relationships for Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Rye, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.131-133
    • /
    • 2010
  • As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

  • PDF

Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building (공동주택 하자감정업무 표준절차개발을 위한 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF