• Title/Summary/Keyword: Super Lift

Search Result 36, Processing Time 0.025 seconds

Super-Lift DC-DC Converters: Graphical Analysis and Modelling

  • Zhu, Miao;Luo, Fang Lin
    • Journal of Power Electronics
    • /
    • v.9 no.6
    • /
    • pp.854-865
    • /
    • 2009
  • Super-lift dc-dc converters are a series of advanced step-up dc-dc topologies that provide high voltage transfer gains by super-lift techniques. This paper presents a developed graphical modelling method for super-lift converters and gives a thorough analysis with a consideration of the effects caused by parasitic parameters and diodes' forward voltage drop. The general guidelines for constructing and deriving graphical models are provided for system analysis. By applying it to examples, the proposed method shows the advantages of high convenience and feasibility. Both the circuit simulation and experimental results are given to support the theoretical analysis.

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF

Analysis and Implementation of High Step-Up DC/DC Convertor with Modified Super-Lift Technique

  • Fani, Rezvan;Farshidi, Ebrahim;Adib, Ehsan;Kosarian, Abdolnabi
    • Journal of Power Electronics
    • /
    • v.19 no.3
    • /
    • pp.645-654
    • /
    • 2019
  • In this paper, a new high step up DC/DC converter with a modified super-lift technique is presented. The coupled inductor technique is combined with the super-lift technique to provide a tenfold or more voltage gain with a proper duty cycle and a low turn ratio. Due to a high conversion ratio, the voltage stress on the semiconductor devices is reduced. As a result, low voltage ultra-fast recovery diodes and low on resistance MOSFET can be used, which improves the reverse recovery problems and conduction losses. This converter employs a passive clamp circuit to recycle the energy stored in the leakage inductance. The proposed convertor features a high conversion ratio with a low turn ratio, low voltage stress, low reverse recovery losses, omission of the inrush currents of the switch capacitor loops, high efficiency, small volume and reduced cost. This converter is suitable for renewable energy applications. The operational principle and a steady-state analysis of the proposed converter are presented in details. A 200W, 30V input, 380V output laboratory prototype circuit is implemented to confirm the theoretical analysis.

Onshore Deck Mating for Deepwater Nautilus by Super Lift

  • GAB-REA CHO
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.1
    • /
    • pp.71-75
    • /
    • 2002
  • 대형 시추구조물의 건조는 보통 드라이도크에서 하거나, 해양에서 선체와 데크를 접합하는 방법을 사용한다. 그러나 적당한 해양 접합장소가 없거나 드라이도크의 공간부족으로 현대중공업에서는 드라이도크나 해양에서의 접합건조 대신 부유식 시추구조물을 지상에서 조립하는 방법을 채택하게 되었다. 현대중공업에서는 세 가지 단계를 통해 지상 데크조립을 수행하였다. 첫 번째는 네 개의 철골구조 리프팅타워 상에서 유압리프팅시스템을 이용하여 데크를 지상으로부터 38m 들어올린다. 두 번째는 마찰을 줄이기 위해 윤활제가 칠해진 합성 플라스틱으로 싸인 미끄럼틀(Skidway)을 이용하여 두 개의 6000톤 짜리 하부구조를 데크 아래로 끌어 들인다. 마지막 단계로 데크와 하부구조를 단단히 결합시킨다. 이 과정에 2주일이 소요되었으며 일련의 작업을 거쳐 중량 25,500톤급의 Deepwater Nautilus (RBS-8M) 시추선을 무사히 바다 위로 인도하였다. RBS-8M의 데크결합에 Super Lift를 적용하여 성공시킨 사례를 통해 현대중공업의 초대형 시추구조물 건조방식이 이상적이고, 작업 공기나 원가 측면에서 우위가 있음을 시사하고 있으며 이렇게 건조작업의 대부분을 지상에서 수행한 과정을 통해 작업관리, 품질관리, 일정관리에도 좋은 결과를 가져올 수 있었다.

A computation model for Resource-based Lifting loads of the lift-cars for super high-rise buildings (초고층 건축물 리프트카 양중계획수립을 위한 자원기반의 양중부하 산정 모형)

  • Han, Choong-Hee;Lee, Jun-Bok;Won, Seo-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.135-143
    • /
    • 2012
  • Constructing super-tall buildings is significantly different from constructing general ones in every technological and managerial aspects. Especially lift-car operations planning and management is one of core parts among various management techniques required during the course of the whole construction process of the super-tall buildings because vertical movements of physical resources enormously affect the efficiency of the construction processes. However, discrepancy between lifting plans and actual lifting operations causes serious efficiency problems. As an effort to solve the problem, this research suggests an improved method of estimating resource-based lifting load. The computing model developed as a result of this research facilitates more accurate computation of the total operation time and the maximum lifting capacity of the lift-cars. Further, this research can be developed as a decision support system for the total lift-car operations management.

A Fundamental Study on the Control of Hydration Heat of Mass Concrete Using Setting Time Difference (응결시간차를 활용한 매스콘크리트의 수화열 조정에 관한 기초적 연구)

  • 배정렬;윤치환;김기철;한민철;오선교;한천구
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.41-45
    • /
    • 2002
  • Placing lift is applied to place mass concrete in order to reduce thermal cracks by hydration heat. But they results in cold joint between placing lifts, which bring about the loss of strength, water tightness and undesirable appearance. Therefore, in this paper, mechanical and hydration heat of mass concrete using super retarding agent developed through previous study are investigated in order to reduce the hydration heat and place it without place lift. According to test results, placing lifts combined with normal concrete and concrete containing super retarding agent have positive effects on reducing hydration heat. Especially, the crack index by thermal stress of the concrete containing super retarding agent less than a quarter, compared to that of plain concrete without placing lifts, and less than a half, compared to that of plain concrete with placing lifts.

  • PDF

Citic Tower Construction Key Technology

  • Xu, Lishan
    • International Journal of High-Rise Buildings
    • /
    • v.8 no.3
    • /
    • pp.185-192
    • /
    • 2019
  • Citic Tower is the first over-500 m-tall super highrise building in the world, located in the high seismic intensity area with paek ground acceleration over 0.2g in 475 years. This project is unique in its complexity, large volume, and challenging site conditions (zero site for construction). The traditional techniques can hardly meet safty, quality and schedule requirements of the construction. This article introduces the key construction technologies that are innovatively developed and applied in Citic Tower project construction, including intelligent super-high-rise building integrated construction platform system, independently developed by the CCTEB; Jump-Lift Elevator, which is the first of the kind with service height over 500 meters; combined temporary-and-permanent fire protection systems. The BIM technology is also applied in this project. Through technical innovation, and utilization of technologies, construction speed and safety had been greatly improved.

Sliding Mode Control for Current Distribution Control in Paralleled Positive Output Elementary Super Lift Luo Converters

  • Kumar, Kuppan Ramash;Jeevananthan, Seenithangam
    • Journal of Power Electronics
    • /
    • v.11 no.5
    • /
    • pp.639-654
    • /
    • 2011
  • This paper presents a Current Distribution Control design for Paralleled Positive Output Elementary Super Lift Luo Converters (PPOESLLCs) operated in Continuous Conduction Mode using a Sliding Mode Controller (SMC). Manipulating the higher current requirement of the load through the paralleling of POESLLCs, results in a current inequality. This is mainly due to dissimilarities in the power semiconductor switches and circuit components used in POESLLCs, which may lead to converter failures. In order to balance the proper load current sharing and the load voltage regulation of PPOESLLCs, a SMC is developed. The SMC is designed for the inherently variable-structured of POESLLCs by using the state-space average based model. The static and dynamic performance of the developed controller with PPOESLLCs is validated for its robustness to perform over a wide range of operating conditions through both a laboratory prototype and MatLab/Simulink models, which are compared with a Proportional-Integral (PI) controller. Theoretical analysis, simulation and experimental results are presented to demonstrate the feasibility of the developed SMC along with the complete design procedure.

A Method on the Control of Hydration Heat of Mass Concrete Considering the Difference of Setting Time (응결시간차를 활용한 매스콘크리트의 수화열 조정공법)

  • 심보길;윤치환;한민철;김기철;오선교;한천구
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.379-384
    • /
    • 2001
  • This Paper Presents field application test results of mass concrete using super retarding agent. The field test was carried out at mat foundation(thickness 1m) of newly constructed information center of Chongju university. Placing lift composed of 2 layers, and each layer is 50cm. Fly ash and flowing method is also applied. Difference of setting time of concrete between with super retarding agent and without super retarding agent is considered. Concrete without super retarding agent is placed at upper layer and with super retarding agent at lower layer According to test results, the reducing method of hydration heat considering difference of setting time with super retarding agent can reduce the highest temperature about 3~4$^{\circ}C$, and delay the peak time about 3~4days. Compressive strength using super retarding agent is somewhat higher than that of normal concrete. Accordingly, super retarding agent does not affect the strength development.

  • PDF

An Algorithm for Hoisting Time Calculation in Super-tall Building Construction (건설 리프트 가감속 능력을 고려한 양중시간 산정 알고리즘 개발)

  • Cho, Chang-Yeon;Shin, Yoon-Seok;Won, Seo-Kyung;Kim, Jung-Yeol;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.120-129
    • /
    • 2011
  • An installation of the construction lift has a few limitations by many constrains and these have influences on labor productivity, that can be changed by vertical-transportation management. In the super-tall building construction, a management of construction lift operation is one of the most important factor, but existing methodologies depend on skilled practitioners' experiences. And it is true that the expertise resulted by the experiences does not transfer to the next generation. This study is a part of lifting-management simulation development which aims at the optimal construction lift management. A proposed algorithm is focus on lifting time calculation considering an acceleration capability. This research evaluates the result accuracy using comparative analysis on simulation result and field measuring time.