Abstract
An installation of the construction lift has a few limitations by many constrains and these have influences on labor productivity, that can be changed by vertical-transportation management. In the super-tall building construction, a management of construction lift operation is one of the most important factor, but existing methodologies depend on skilled practitioners' experiences. And it is true that the expertise resulted by the experiences does not transfer to the next generation. This study is a part of lifting-management simulation development which aims at the optimal construction lift management. A proposed algorithm is focus on lifting time calculation considering an acceleration capability. This research evaluates the result accuracy using comparative analysis on simulation result and field measuring time.
초고층 건축공사에 있어서의 건설리프트 설치는 여러 가지 제한조건들에 의해 한정적인 대수만이 설치될 수 있으며, 이러한 건설리프트의 특징에서 기인하는 설치의 제약은 수직동선 관리에 의해 변화하는 각 층별 노무 생산성에 밀접한 영향을 미치게 된다. 따라서 초고층 건축공사에 있어서의 리프트 운영관리는 현장의 작업생산성을 결정하는 중요한 관리요소이나, 현재 초고층 건축공사의 건설리프트 운영계획의 경우, 각 건설사별 다른 기준을 바탕으로 해당사의 숙련 기술자들의 경험에 의존하는 형태로 계획 및 관리가 이루어지고 있으며, 이러한 관리형태는 프로젝트가 초고층화 및 대형화됨에 따라 고려하지 못하거나 착오가 발생할 수 있는 부분이 생길 수 있는 리스크를 가지고 있다. 이에 본 연구에서는 초고층 건축공사의 중요한 관리요소인 건설리프트 양중관리 시뮬레이션 개발의 일환으로, 건설 리프트의 가감속 능력을 고려한 양중계획 시간산정 알고리즘을 개발하고, 개발된 알고리즘에 대해 시뮬레이션 및 현장측정을 통해 검증하였다.