• 제목/요약/키워드: Substation Automation System

검색결과 112건 처리시간 0.028초

변전소 측정기기의 검.교정 알고리즘에 관한 연구 (A Study on the Substation for the Bad Measuring Devices Detection and Correction)

  • 이흥재;박성민;김용한;김종구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.313-315
    • /
    • 2001
  • The power system automation, especially the substation automation is a major issue. so it has been widely studied each country in the world. Since the substation system includes lots of measuring devices. a lot of data and system information are transmitted to operators. The measured values usually have the error that results from the communication process, and it can degrade the reliability of estimated values. So. the detection and correction of measured values at a substation are important factors for substation automation. In this paper, we study the detection and col of measured values at the domestic 154kV/2 distribution substation of double bus structure study will be useful for expected economic dispatch measuring device's inspection and corr management by SCADA system operation, substation automation.

  • PDF

변전소 종합 자동화 기술개발 동향 (R&D Trends of Substation Automation)

  • 이봉희;박순규
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.548-550
    • /
    • 2002
  • In this paper the domestic and worldwide trends of substation automation are described in order to cope with the coming new environment in this part On the world market of substation control it will be change from analog technology to digital technology. And the technology of a system integration relevant to a substation automation become more important than that of individual power apparatus. Therefore development of substation automation technology is needed.

  • PDF

Embedded Platform Architecture for Substation Automation

  • Kim, Hak-Man;Cha, Jae-Sang;Lee, Jong-Joo
    • 조명전기설비학회논문지
    • /
    • 제21권9호
    • /
    • pp.76-80
    • /
    • 2007
  • For a more efficient and economical management of substations of power system areas, the concept of substation automation has been introduced using intelligent and ubiquitous IT techniques. In this paper, ubiquitous IT prototype hardware, functions and communication interfaces on an embedded platform for substation automation are proposed. Also, operating system architecture is suggested for the effective implementation of substation automation.

IEC61850 기반 변전소자동화시스템인 신뢰도 향상기법 (A Reliability Enhancement Methodology of the IEC61850 based Substation Automation System)

  • 임성일
    • 조명전기설비학회논문지
    • /
    • 제22권9호
    • /
    • pp.75-81
    • /
    • 2008
  • 최근 IEC61850이 변전소자동화시스템의 국제표준으로 자리 잡고 있는데, 그 중에서도 보호IED의 신뢰도는 매우 중요하다. 본 논문에서는 IEC61850의 특징을 이용하여 보호IED의 신뢰도를 향상시키는 새로운 방법을 제시한다. 본 논문에서 제시하는 신뢰도 향상기법은 적은 수의 백업 IED를 사용하므로 경제적이면서도, 기존의 2계열화나 백업보호방식에 비하여 오부동작을 현저히 감소시킬 수 있다. 6모선 예제계통에 대한 모의실험을 통하여 본 논문에서 제시하는 신뢰도 향상기법의 유용성을 검증하였다.

초고압 변전기기의 예방진단 및 종합 자동화 (The Preventing and Diagnosis of Ultra High Voltage Substation Devices and Combination with An Automation System of A Substation)

  • 양항준;김경근;김성식;유정식;김홍석;이학성
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 춘계학술대회 논문집 전력기술부문
    • /
    • pp.275-277
    • /
    • 2001
  • In this paper a preventative and diagnostic system for high and ultra high voltage electric power transmission apparatus is proposed to secure substation normal operation. The proposed system consists of monitoring sub-system and diagnostic sub-system, which are mainly for GIS and main transformer, and the system will be applied for newly established 765kV class substation in Korea. Some guideline for combination with substation control system are presented, and engineering solution as an improved substation automation system is also proposed.

  • PDF

IEC 61850 기반 IED 시스템 성능 시험 절차서에 관한 연구 (Study on the Testing Procedures of IED System Performance based on IEC 61850)

  • 이남호;장병태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1-2
    • /
    • 2008
  • Korea Electric Power Research Institute has carried out verification of communication conformance on IEC 61850 based IEDs related to power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology". Owing to IEC 61850 international standard and digital substation automation system, IED testing process should be changed from the conventional way to the new way described in the paper. This paper describes IED testing procedures based on substation automation system using UML.

  • PDF

변전자동화 종합 성능시험을 위한 시험모델 및 설계시스템 개발에 관한 연구 (A Study on the Development of Testing Models and Its Design System for the Comprehensive Performance Test of the Substation Automation System)

  • 이남호;장병태
    • 조명전기설비학회논문지
    • /
    • 제25권7호
    • /
    • pp.63-71
    • /
    • 2011
  • Due to the rapid development of digital technnology and informantion communication, in the IEC 61850 based substation automation system, the innovative paradigm shift is expected and also required in many substation-related jobs, especially in the device function test area Accordingly a common testing model which can simplify the complex contents of the SAS performance test performed by test engineers has been identified, that can overcome limitations of engineers' own testing knowledge and experience. Testing models and its design system for the comprehensive performance test of the Substation Automation System is developed and the result of the study is reported in this paper.

SCADA가 통합된 배전자동화 시스템의 변전소 사고 시 복구 자동화 알고리즘 (A Restoration Automation Algorithm on a Fault in Substation of SCADA-coordinated Distribution Automation System)

  • 홍준호;임일형;이승재;김태완;최면송;하복남;이성우
    • 전기학회논문지
    • /
    • 제58권11호
    • /
    • pp.2107-2114
    • /
    • 2009
  • It is impossible to take the instant action in the distribution system When fault occures in a substation because operation of the substation and the distribution system are separated. However the power system automation has been studying about unity operation and co-operation between SCADA and DAS(Distribution Automation System). In this paper proposes a new algorithm of efficiency restoration using a outage load switching to a healthy MTR a fault occurrence at a MTR in united system between DAS and SCADA. In addtion, proposed algorithm includes a outage restoration method which keeps MTR optimal capacity with reorganization of distribution network in case it can not restore outage state loads caused by shortage of healthy MTR remain capacity. In case that proposed sequence still can not complete restoration, this paper suggests a efficiency outage restoration with objective function included priority in outage loads. In the case studies, the proposed algorithm have been verified in 2 MTR and 3 MTR substation

IEC 61850 기반의 변전소자동화 시스템 개발 (Development of Substation Automation System based on IEC 61850)

  • 이유진;김용학;심응보;한정열;이종훤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.716-717
    • /
    • 2011
  • This paper presents the overview of development of substation automation system. The prototypes of SA system are developed in first phase, and being enhanced the performance in second phase. In this research, the project was classified into three projects which are the development of intelligent electronic devices, the development of operation system and communication network in substation, and the development of technology to verify the compatibility of IEC 61850. As a result of this research, the domestic-made SA system are operated and tested for the performance in 154kV substation and/or test-bed in KEPCO PT Center.

  • PDF

변전소 자동화를 위한 상태감시 시스템에 관한 연구 (Study on the Supervisory Monitoring System for Substation Automation)

  • 이흥재;이은재
    • 조명전기설비학회논문지
    • /
    • 제28권2호
    • /
    • pp.84-91
    • /
    • 2014
  • This paper introduces the application of supervisory monitoring system for substation automation based on IEC 61850. The objective of proposed system is detection of such a malfunction or degradation of devices. The supervisory monitoring procedure consists of a two step - topology processor and state estimation. The topology processor using artificial intelligence is a preprocessing step of state estimation. Topology processor identifies the topology structure of switches in substation and detects an error of ON/OFF state data. The state estimation is an algorithm that minimizes an error between optimal estimation values and real values. The proposed system is applied to standard digital substation based on IEC 61850 for performance verification.