• Title/Summary/Keyword: Slope Stability Measures

Search Result 47, Processing Time 0.02 seconds

MEASURES FOR STABILITY OF SLOPE ESTIMATION ON THE SECOND ORDER RESPONSE SURFACE AND EQUALLY-STABLE SLOPE ROTATABILITY

  • Park, Sung H.;Kang, Ho-Seog;Kang, Kee-Hoon
    • Journal of the Korean Statistical Society
    • /
    • v.32 no.4
    • /
    • pp.337-357
    • /
    • 2003
  • This paper introduces new measures for the stability of slope estimation on the second order response surface at a point and on a sphere. As a measure of point stability of slope estimation, we suggest a point dispersion measure of slope variances over all directions at a point. A spherical dispersion measure is also proposed as a measure of spherical stability of slope estimation on each sphere. Some designs are studied to explore the usefulness of the proposed measures. Using the point dispersion measure, another concept of slope rotatability called equally-stable slope rotatability is proposed as a useful property of response surface designs. We provide a set of conditions for a design to have equally-stable slope rotatability.

A Study on Slope Stability of Corestone (핵석지반의 사면안정성 연구)

  • 이수곤;금동헌
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.551-558
    • /
    • 2000
  • When cut slope is excavated, corestone in cut slope exists 20∼30%. In case of soil and soft rock mixing, people lay out gradient of 1 : 0.5, because of soft rock slope. In a case, slope that exists corestone between soil happens to large landslide. So, As a study performs geological survey, Analysis of slope stability reinforcement measures, etc, A study presents example meaures and analysis on slope stability of corestone.

  • PDF

A Study on the Revegetation Structural Analysis for Environment Factor of Road Slope (도로비탈면의 환경인자를 고려한 식생구조분석에 관한 연구)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.2
    • /
    • pp.12-20
    • /
    • 2004
  • This study was carried out from January 1998 to December 1999 to report the revegetation of cutting-rock slopes and a design standard in the highway cut-slopes. The field data was collected from the 67 sites cutting-rock slopes of highways, local roads, and field test. As the result of analyze, cutting-rock slopes revegetation measures were 16 types. There were Vine planting(3 types), Hydroseeding measures with seed-fertilizer-soil materials(5 types), Vegetaion-base spraying measures(5 types), and Stability measures(3 types). The factors affecting the plant coverage rates of cutting-rock slopes were the slope gradient, the slope width and direction. The plant coverage rate decreases in the condition of steep slope and long slope width and length(height). In addition, the plant coverage rates of the westward and southward were lower than that of the northward and eastward. Most dominant species were Zoysia japonica, Lespedeza cyrtobotrya, Lespedeza cuneata, Rubus crataegifolius, Miscanthus sinensis, Arrundinella hirta, Themeda triandra, and Oenothera odorata. Exotic species were Eragrostis curvula(Weeping lovegrass), Dactylis glomerata Orchardgrass), Lolium perenne(Perennial ryegrass), and Festuca arundinacea(Tall fescue). It is recommended to adjust the proposed factor as environment, topsoil, classification of rock, field condition and characteristic related with revegetation measures on slopes for the presentation of revegetation standard.

Analysis of Slope Stability in Slopes of Failed and not Excavated (붕괴된 사면과 굴착되지 않은 사면의 안정성 검토)

  • 유병옥;김경석;이용희
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.06a
    • /
    • pp.129-144
    • /
    • 2003
  • Generally, investigation methods of cut slope are conducted only geological surface survey to gain engineering geological data of cut slopes. These methods have many problems such as limitations of investigation for a special area. So geophysical investigations such as geotomography, seismic and electrical resistivity methods have been used to search for failure surface in potential failure slopes or failed slopes. But investigation method using the borehole camera is recently a used method and it is thought that this method is more reliable method than other investigation methods because of being able to see by the eyes. Therefore, this paper was conducted investigations of borings and BIPS(Borehole Image Processing System) to search for potential sliding surfaces and was applied to obtain information of discontinuity on failed and potential failure slope in highway. As the results of BIPS, we could decide potential sliding surface in the slope, conducted to check slope stability and decided slope stability measures.

  • PDF

Assumption of Failure Surface using Borehole Image Processing System in Failed Rock Slope (Borehole Image Processing System에 의한 붕괴사면의 활동면 추정)

  • Yoo Byung-Ok;Chung Hyung-Sik
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.217-239
    • /
    • 1999
  • Investigation methods of cut slope are conducted generally only geological surface survey to gain engineering geological data of cut slopes. These methods have many problems such as limitation of investigation for a special area. So geophysical investigations such as geotomography, seismic and electrical resistivity methods have been used to search for failure surface in potential failure slopes or failed slopes. But investigation method using the borehole camera is recently a used method and it is thought that this method is more reliable method than other investigation methods because of being able to see by the eyes. Therefore, this paper was conducted investigations of 4 boleholes and BIPS (Borehole Image Processing System) to search for potential sliding surfaces and was applied to obtain information of discontinuity on failed highway slope. As the results of BIPS, we could decide potential sliding surface in the slope and conducted to check slope stability. And decided slope stability measures.

  • PDF

Stability Assessment on the Final Pit Slope in S Limestone Mine (S 석회석광산에서의 최종 잔벽사면의 안정성 평가)

  • Sun, Woo-Choon;Lee, Yun-Su;Kim, Hyun-Woo;Lee, Byung-Joo
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.99-109
    • /
    • 2013
  • The slopes of open-pit mine are typically designed without considering the reinforcement and support method due to the economical efficiency. However, the long-term stability of final pit slope is needed in some case, therefore the appropriate measures that can improve the stability are required. In this study, the field survey and laboratory test were carried out in S limestone mine. The stability assessment of final pit slope was performed through the stereographic projection method, SMR, and numerical analysis. And countermeasures for stabilization were proposed. The results of analysis show that full scale of slope failure is not expected but the failures of bench slope scale are likely to occur. In oder to increase the stability of bench slope, we suggested the remedial methods as follows: excavating the final pit slope by pre-splitting blasting, placing the wide berm in the intermediate bench slope and installing the horizontal drainage hole in the place of local ground water runoff.

광미적치장 사면의 안정성 해석 및 대책

  • Song, Won-Gyeong;Han, Gong-Chang;Sin, Jung-Ho
    • Geotechnical Engineering
    • /
    • v.14 no.3
    • /
    • pp.123-134
    • /
    • 1998
  • To analyse the stability of a slope composed of waste material produced in a closed lead mine, numerical modeling has been carried out in two dimension using FLAC, finite difference program. The research was focused on the effect of the earthquake as well as a rise of water table upon slope stability. The numerical results have shown that the slope would not be safe against earthquake event and that the increase of pore pressure due to a rise of water table up to the ground level may result in a failure of the slope. On the basis of numerical analyses and site investigation, two sorts of measures have been taken. In short term, removal of a part of materials deposited on the top of the pile is required to increase immediately safety factor of the slope even a little. In ling term, it is necessary to repair drainage facilities and dam which covers waste material so that the slope is prevented from failure in a radical manner. It has been confirmed by numerical analyses that an improvenment of the stability can be in a great extent expected after such measures have been performed.

  • PDF

Effects of Forest Environmental Factors and Forest Road Structures on the Stability of Forest Road in Granite Areas (화강암지역의 산림환경 및 도로구조인자가 임도의 안정성에 미치는 영향)

  • Yim, Byung-Jun;Ma, Ho-Seop
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.2 no.3
    • /
    • pp.83-92
    • /
    • 1999
  • To investigate the influence of forest road characteristics and site conditions on the stability of forest-road in granite area, four forest roads had been selected in Kyongbuk regions. The total of 13 road characteristic variables were evaluated by the discriminant analysis. The factors influencing the stability of forest road were bed rock, slope length, coverage, hardness, side-ditch erosion and road width. But aspect and soil texture were not significant for the stability in this area. In the correlation between forest environment and road structure, hardness and bed rock was highly significant in stability group, and coverage and side-ditch erosion was highly significant in instability group. 75 of 175 segments were instable whereas the others were stable. The centroids value by discriminant function in the stability and instability were estimated to 3.0585 and -1.9116, respectively. The stability criterion of forest road was discriminated from the centroids value of the each group. The main factors contributing the stability of forest road were significant in order of side-ditch erosion, coverage, soil texture, elevation, gradient, slope length and construction year. The prediction rate of discriminant function for stability evaluation of forest road was as high as 97.44%. In conclusion, the forest road structure factors such as length, coverage and slope gradient were controlled by construction techniques. If the factors like those should be considered in design, construction and forest road management, the stability of forest road may increase more. And also, it is necessary to take slope protection measures like small terraces and retaining walls for stability of cut slope.

  • PDF

Application for Environment-friendly Retaining Wall Method Composed with Permanent Ground Anchor and Vertical Precast Panel in Cutting Slope Area (영구앵커와 연직 프리캐스트패널을 사용한 절토사면 친환경옹벽공법의 적용사례)

  • Nam, Hong-Ki;Jung, Hong-Seop
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.87-96
    • /
    • 2010
  • PAP method is a combined measures which consist a anchored retaining wall method with permanent ground anchors and vertical precast concrete panels, step by step on the slope surface. And soil is back filled between slope and vertical precast panels. Therefore, this method is more effective than any other ground anchor reinforcing methods of slope stability, for example cross type concrete block ground anchor or buttress concrete block ground anchor method. Because of increasing effective anchor force and green tree planting.

  • PDF

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.