• 제목/요약/키워드: Selecting Construction Methods

검색결과 125건 처리시간 0.023초

지하구조물의 공법선정을 위한 요인분석 (Analysis of Factors for Selecting Construction Methods for Underground Structures)

  • 강현정;임홍철;박상현;이강
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.37-40
    • /
    • 2007
  • As a demand for underground structure is increasing with more parking and retail spaces required. Various construction methods are reviewed and selected for each specific site for economical and fast construction. In this study, factors for selecting construction methods were categorized for substructure construction. Construction processes of substructure are consisted of methods for excavation, earth retaining systems, and placement of slabs. Factors for the selection of substructure construction method are the condition of surrounding, geotechnical, information and constraint by comfortness for others nearby. After survey for the construction data of 5 different sites, analysis about reliable substructure construction selection method was suggested.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

도로의 노선선정을 위한 GIS 연계 기법의 평가 (Evaluation of Techniques Linked GIS for Route Selecting of the Road)

  • 이형석;배상호;한우철
    • 한국컴퓨터정보학회논문지
    • /
    • 제8권4호
    • /
    • pp.1-6
    • /
    • 2003
  • 도로의 노선 선정은 기본적이면서도 중요한 과정이다. 하지만 노선 선정 과정은 기술적, 교통적, 환경적 요인 등을 동시에 고려해야 한다. 여러 대안노선을 검토하여 이용가치를 극대화하고 공사비를 절감할 수 있는 최적노선을 선정해야 한다. 본 연구는 도로건설공사의 기본설계단계에서 GIS와 연계될 수 있는 방법들을 분류하고 주관적 평가를 통해 합리적인 노선 선정 방안을 제시하고자 하였다.

  • PDF

대공간 지붕철골공사 양중공법 선정을 위한 의사결정지원모델 (Decision Support Model for Selecting of Lifting Methods for Large Spatial Roof Construction)

  • 차민수;이명도
    • 한국건축시공학회지
    • /
    • 제18권5호
    • /
    • pp.489-498
    • /
    • 2018
  • 본 연구는 대공간 지붕철골공사의 양중공법 선정을 위한 의사결정지원모델 제안을 목적으로 한다. 이를 위해 이론적 고찰 및 전문가자문을 통해 6개의 상위요인과 19개의 하위요인으로 구성된 양중공법 선정 영향요인을 도출하였다. 이후 AHP분석을 통해 요인별 상대적 중요도를 산정한 결과, 6개의 상위요인 중 현장조건(0.237), 19개의 하위요인 중 여유공지의 유무(0.118)가 양중공법 선정에 있어 가장 중요한 영향요인으로 도출되었다. 이를 바탕으로 현장관리자가 공법대안을 평가할 수 있는 방법 및 절차를 수립하고 최종적으로 현장적합도지수를 제시해줌으로써 의사결정지원모델을 구축을 완료하였다. 구축모델의 검증을 위해 대공간 현장경험자를 대상으로 사례분석을 수행한 결과, 제시된 모델이 공법선정에 있어 유용하게 활용될 수 있을 것으로 판단되었다. 본 연구의 결과는 프로젝트 초기 공법선정 과정에서 현장관리자의 의사결정을 지원하는데 활용될 것으로 기대된다.

현장 조건에 따른 Top-Down 공법 사례분석에 관한 연구 (Analysis of Cases Using Top-Down Construction Method Under Various Site Condition)

  • 신현정;신규철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.197-199
    • /
    • 2011
  • To utilize the Top-Down construction method, it is required to analyse building area, floors, and soil conditions to choose the three basic elements of retaining wall, base column, and floor structure. The purpose of this research is to compare the methods of Top-Down with other construction methods. The research method is to analyse the project conditions of Top-Down project cases. The aim is to develop a method of selecting alternatives, considering construction characteristics, work schedule, supporting methods, foundation types.

  • PDF

GIS를 이용한 사고 위험도로의 설계노선 분석 (Design Route Analysis of Dangerous Road for Traffic Accident using GIS)

  • 이계동;정성혁;이재기
    • 한국측량학회지
    • /
    • 제26권6호
    • /
    • pp.591-598
    • /
    • 2008
  • 최근 정부에서는 도로의 기하구조 불량으로 인해 사고 발생률이 높은 대상지에 대해 위험도로개선사업을 추진 중에 있다. 비록, 도로의 노선을 선택하는 것이 기본적이고 중요한 과정이지만 노선 선정의 과정은 기술적, 안전적, 환경적인 요소들을 모두 고려해야 한다. 또한, 3차원 지형모델 기술은 대체 노선선정에 대한 설계와 계획에서 중요한 요소로 사용될 수 있다. 수치지도와 노선도의 조합에 의해 생성된 3차원 지형도를 조합한 실험의 경우, 주요 간선 도로 건설현장에서 다차원적인 접근 방법을 제공하기 위해 개발되었다. 3차원 수치표고 모형은 개발계획과 시공계획에 대해 설계 시공 현장에서 실시간 가상 접근을 제공하는 GIS기반으로 다양한 지표 분석을 가능하게 한다. 따라서 본 연구에서는 수치지도에 GPS측량과 토털스테이션(Total Station)측량을 이용하여 취득한 현황 측량 정보를 결합하여 노선 선정에 따른 3차원 공간 정보를 비교 검토하고 토공량 산정시 보다 정확한 양을 산정하여 도로선형개선에 활용할 수 있도록 하고, 주관적인 평가를 통하여 대체 노선에서 노선선정에 대한 합리적인 방법을 제시하고자 한다.

리모델링 프로젝트의 최적 구조보강방법 선정 프로세스 (Selection process of the optimal structural-reinforcement method in remodeling construction works)

  • 김동필;조규만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.298-299
    • /
    • 2014
  • As a governmental plan for real estate revitalization, remodeling vertical extension has been permitted. Thus, the Ministry of Land, Infrastructure and Transport preannounced proclaiming the revised Housing Act and establishing the remodeling basic plan, and it is anticipated that the remodeling market will be revitalized in earnest after the enforcement of remodeling vertical extension(April 25th. 2014). As vertical extension is applicable up to 3 stories, the safety of building for remodeling is becoming important, so most remodeling construction works use various methods for structural reinforcement. In this process, the selection of structural reinforcement method has depended on structural engineer's experience and knowledge and there has been a limitation in selecting the optimum structural reinforcement method which considers remodeling project characteristics. Therefore, this study analyzed the factors to determine the kinds of structural reinforcement method in a remodeling project and suggested a process to select the best structural reinforcement method of remodeling construction.

  • PDF

Quality-based performance comparison of design-build and design-bid-build project delivery methods for warehouses and self-storage facilities

  • Vivek SHARMA;Vijaya Ravi Prasanth REDDI;Abdul Sohail MOHAMMED;Jong Han YOON
    • 국제학술발표논문집
    • /
    • The 10th International Conference on Construction Engineering and Project Management
    • /
    • pp.753-760
    • /
    • 2024
  • Warehouses and Self-Storage facilities are essential for e-commerce operations, providing inventory, distribution, and delivery space. As per the Bureau of Labor Statistics, the number of warehousing and storage businesses in the United States increased from 15,152 in 2010 to 20,002 in 2021, showing continuous growth over the decade. Given the recent surge, there is a need to better understand the impact of these delivery methods on the quality metrics of these facilities. This study aims to contrast the measure of quantitative quality performance of design-build (DB) versus traditional design-bid-build (DBB) project delivery methods (PDM) for warehouses and self-storage facilities. This research conducted a literature review to document quality metrics to compare DBB and DB on project performance. ANOVA was conducted to compare the significant difference between the means to compare the performance between delivery methods and project outcomes across these critical areas. With these insights, owners can make informed strategic decisions about selecting the optimal PDM for future storage facility projects based on their unique quality and scope management objectives.

지하공사 사례를 기반으로 한 터파기 공법 선정프로세스 분석 (Case Analyses of the Selection Process of an Excavation Method)

  • 박상현;이강;최명석;강현정;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2007년도 춘계학술논문 발표대회
    • /
    • pp.101-104
    • /
    • 2007
  • As the proportion of underground construction increases, the impact of inappropriate selection of a underground construction method for a construction size increases. The purpose of this study is to develop an objective way of selecting an excavation method. There have been several attempts to achieve the same goal using various data mining methods such as the artificial neural network, the support vector machine, and the case-based reasoning. However, they focused only on the selection of a retaining wall construction method out of six types of retaining walls. When we categorized an underground construction work into four groups and added more number of independent variables (i.e., more number of construction methods), the predictability decreased. As an alternative, we developed a decision tree by analyzing 25 earthwork cases with detailed information. We implemented the developed decision tree as a computer-supported program called Dr. underground and are still in the process of validating and revising the decision tree. This study is still in a preliminary stage and will be improved by collecting and analyzing more cases.

  • PDF

Development of Awarding System for Construction Contractors in Gaza Strip Using Artificial Neural Network (ANN)

  • El-Sawalhi, Nabil;Hajar, Yousef Abu
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권3호
    • /
    • pp.1-7
    • /
    • 2016
  • The purpose of this paper is to develop a model for selecting the best contractor in the Gaza Strip using the Artificial Neural Network (ANN). The contractor's selection methods and criteria were identified using a field survey. Fifty four engineers were asked to fill a questionnaire that covers factors related to the selection criteria of contractors practiced in Gaza Strip. The results shows that the dominant part of respondents (91%) confirmed that the current awarding method "the lowest bid price" is considered one of the major problems of the construction sector, "award the bid to the highest weight after combination of the technical and financial scores" represented 50% of the respondents. The criteria weights were determined based on Relative Importance Index (RII. Ninety-one tenders(13 projects) were used to train and test the ANN model after re-evaluating the contractors depend on the weights of factors to select the best contractor who achieves the highest score. Neurosolution software was used to train the models. The results of the trained models indicated that neural network reasonably succeeded in selection the best contractor with 95.96% accuracy. The performed sensitivity analysis showed that the profitability and capital of company are the most influential parameters in selection contractors. This model gives chance to the owner to be more accurate in selecting the most appropriate contractor.