Proceedings of the Korean Institute of Building Construction Conference (한국건축시공학회:학술대회논문집)
- 2011.05a
- /
- Pages.197-199
- /
- 2011
Analysis of Cases Using Top-Down Construction Method Under Various Site Condition
현장 조건에 따른 Top-Down 공법 사례분석에 관한 연구
Abstract
To utilize the Top-Down construction method, it is required to analyse building area, floors, and soil conditions to choose the three basic elements of retaining wall, base column, and floor structure. The purpose of this research is to compare the methods of Top-Down with other construction methods. The research method is to analyse the project conditions of Top-Down project cases. The aim is to develop a method of selecting alternatives, considering construction characteristics, work schedule, supporting methods, foundation types.
Keywords