References
- Y. Topcu, "A decision model proposal for construction contractor selection in Turkey", Building and Environment, vol 39, pp. 469 - 481, 2004. https://doi.org/10.1016/j.buildenv.2003.09.009
- T. Shultz, "A constructive neural-network approach to modeling psychological development", Cognitive Development, vol 27, pp. 383-400, 2012. https://doi.org/10.1016/j.cogdev.2012.08.002
- L. Gaojun, & Z. Yan, "Credit assessment of contractors: A rough set method. tsinghua science and technology", 1007-0214 13/16, pp. 357-362, 2006.
- D. Watt, & K. Willey, "The relative importance of tender evaluation and contractor selection criteria", Journal of Project Management, vol 28, pp. 51-60, 2010. https://doi.org/10.1016/j.ijproman.2009.04.003
- M. Darvish & A. Saeedi, "Application of the graph theory and matrix methods to contractor ranking", Journal of Project Management, vol 27, Feb., pp. 610-619, 2009. https://doi.org/10.1016/j.ijproman.2008.10.004
- M. Marzouk, A. El Kherbawy & M. Khalifa, "Factors influencing sub-contractors selection in construction projects", HBRC Journal, vol 9, pp. 150-158, 2013. https://doi.org/10.1016/j.hbrcj.2013.05.001
- N. El-Sawalhi, D. Eaton, & R. Rustom, "Contractor pre-qualification model: State-of-the-art", Journal of Project Management, vol 25 (2007), pp. 465-474. https://doi.org/10.1016/j.ijproman.2006.11.011
- P. Kumar, & S. Nigam, "Vehicular traffic noise modeling using artificial neural network approach", Transportation Research Part, C 40, pp. 111-122, 2014. https://doi.org/10.1016/j.trc.2014.01.006
- S. Muqeem, & A. Idrus, "Prediction modeling of construction labor production rates using Artificial Neural Network", International Conference on Environmental Science and Technology, ICEST 2011.
- M. Skitmore, B. Xia, & A. Bridge, "Xamining the influence of participant performance factors on contractor satisfaction: A structural equation model", Journal of Project Management, 2013.
- J. Principe, J. Park, & G. Cao, "NeuroSolution Help" , s.l.: NeuroDimension, Inc, 2010.
- M. Arafa & M. Alqedra, "Early stage cost estimation of buildings construction projects using ANN". Journal of Artifical Intelligence, vol 4, no 1, pp. 63-75, 2011. https://doi.org/10.3923/jai.2011.63.75
- Z. Dindar, "Artificial neural networks applied to option pricing", University of the Witwatersrand, Johannesburg, 2004.
- G., Weckman, H., Paschold, J., Dowler, H. Whiting, H. & , Young, W. (2010), Using neural networks with limited data to estimate manufacturing cost, Journal of Industrial and Systems Engineering, Vol. 3 No. 4, pp.257-274.
- J., Dowler "Using Neural Networks with Limited Data to Estimate Manufacturing Cost", Master thesis in science. Ohio University, 2008.
- C. Willmott, & K. Matsuura, "Advantages of the mean absolute error (MAE) over the root mean square error (RMSE) in assessing average model performance", Climate Research, vol. 30, pp. 79-82, 2005. https://doi.org/10.3354/cr030079