• 제목/요약/키워드: Scaffolding work

검색결과 55건 처리시간 0.024초

이동식 사다리 이해관계자 집단 심층인터뷰를 통한 안정성 개선 모델 개발에 관한 연구 (A Study on Development of Stability Improvement Model for Portable Ladders through In-depth Interviews on Stakeholders)

  • 황종문;신성우
    • 한국안전학회지
    • /
    • 제36권5호
    • /
    • pp.36-42
    • /
    • 2021
  • Portable ladders are widely used as ascend and descend pathways and platforms for works at height at residential and industrial sites. In the last 10 years, 267 fatalities and 36,571 accidents related to portable ladders have been reported, suggesting a need to develop countermeasures to prevent such accidents. In this study, an in-depth focus group interview (FGI) was conducted with various stakeholders of portable ladders to survey the current usage and requirements for improving work safety. A new portable ladder called active platform ladder was developed based on the requirements suggested by the FGI. A stability test confirmed that the developed ladder is more stable than conventional ones, suggesting that it can reduce the fall accidents.

A Case Study of Disaster Accidents at Construction Site Based on PDCA Theory

  • Shin, Dong-Won;Kong, Ha-Sung
    • International journal of advanced smart convergence
    • /
    • 제10권3호
    • /
    • pp.245-256
    • /
    • 2021
  • This study is significant in determining the reduction of safety accidents by applying PDCA's theory by subdividing it into a case analysis technique for construction sites by PDCA's theory. For this study, accidents accounted for the largest proportion of each type of disaster in the construction site were considered, and safety accidents were reduced through the PDCA theory through prior research. The analysis method of this study derived improvement plans by applying PDCA techniques to plan, implement, confirm, review, and improve disaster accidents at construction sites. The conclusions of this study are as follows. In the plan, first of all, measures shall be taken to prepare a safety management plan, to verify the implementation of the plan, and to verify the degree of implementation by the field manager. In the implementation, first of all, it is necessary to introduce a safety education history system to strengthen the safety education curriculum to suit the site, as long-term work is impossible for field workers depending on field conditions. First of all, it is necessary to strengthen the installation of safety facilities, including "work scaffolding" and "conducting prevention facilities" at construction sites. In management review and improvement, the risk assessment system for construction sites needs to be expanded first°.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

조립 가설기자재 품질평가 및 관리 시스템 개발 - 강관 비계, 시스템 비계, 시스템 동바리를 중심으로 - (Development of Quality Evaluation and Management System for Assembled Temporary Equipment - Focused on Steel Pipe Scaffolding, System Scaffolding and Support -)

  • 장지영;이지연;김하윤;이준호;김준상;김정렬;김영석
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.43-55
    • /
    • 2022
  • 조립 가설기자재는 본 공사가 시작되기 전 반드시 수행되는 가설공사에 널리 사용되기 때문에, 조립 시 품질확보와 설치 후 운영 시 조립 가설기자재로 인해 발생 가능한 안전사고 예방이 필수적이다. 그러나 현재 대부분의 건설현장 관리자는 조립 가설기자재의 품질관리를 본 공사를 위해 설치 후 해체하는 임시구조물을 관리하는 업무로 인식하고 있는 등 그 중요성을 인지하지 못하고 있는 것으로 조사되었다. 현재 건설현장에서의 조립 가설기자재의 품질관리 업무는 정형화된 절차가 부재하고 이를 수행하는 주체가 불분명하여 건설현장별로 상이한 업무방식에 의해 수행되고 있으며, 설치작업 시 종합건설업체 관리자는 임의의 판단에 의해 점검이 필요한 부분에 대해서만 점검하고 이에 대한 조치사항을 증거자료 없이 전달 및 반영하기 때문에 투명성이 보장되지 못하여 그 결과가 중대재해로 이어지는 문제가 발생하고 있어 이에 대한 개선이 시급한 것으로 분석되었다. 따라서 본 연구에서는 건설현장 내 이해관계자가 조립 가설기자재의 품질확보를 위한 체계적인 품질평가 및 관리 절차를 제공하고, 품질평가 및 관리 업무를 위한 체크리스트를 개발하여 이에 대해 웹(Web)상에서 이력관리를 지원하는 문서 작성 중심의 시스템을 구축하는 데 목적이 있다.

곤돌라 안전난간 제거 등으로 인한 추락재해 감소방안 (Reducing the Falling Accident due to the Removal of Safety Fence from Gondola)

  • 변형식;임종국;양원백
    • 대한안전경영과학회지
    • /
    • 제21권2호
    • /
    • pp.9-14
    • /
    • 2019
  • Gondola is widely used as a construction facility to perform external finishing work without using scaffolding at a construction site. However, since 2000, there have been 17 deaths from now so these risks associated with work can not be ignored. Therefore, it is expected that it will contribute greatly to prevent related disasters if introducing necessary measures to prevent repeated related disasters and installing additional safety devices. In order to eliminate the risk factor according to the operation of the gondola, it is necessary for the operator to use it to use it while the examination of each product is completed, and to use the over load Dangerous arbitrary measures such as arbitrary operation of the prevention device, removal of the safety fence for convenience of work, installation of the wire rope installed in the air, falling out of the wire rope and falling to the ground Do not perform such sealing measures so that any operation of the overload prevention device can not be done so as not to take such arbitrary measures, or wire the power supply wire to the safety fence so as not to delete the safety fence. Then, when the safety fence is removed, so that it does not become a gondola operation, or when replacing the wire rope in the air, to prevent the wire rope from coming off, Additional measures such as installing falling down prevention device may be necessary.

송전선로 가선공사용 모듈형 발받침 개발 (Development of Modular Scaffold for Overhead Transmission Line Wiring Work)

  • 민병욱;백승도;강대언;방항권;최진성;백수곤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.450-451
    • /
    • 2006
  • The method of conductor wiring is that a messenger wire is installed, the end of the wire is connected to the conductor and a engine puller pulls the conductor. The length of one section of wiring is $3{\sim}5km$ and one group messenger wire pulls simultaneously $2{\sim}4$ group conductor, while a tensioner maintains wiring tension to prevent the deflection of the conductor. However, there are many obstacles such as roads, power lines, communication lines, buildings, farms and crops. Therefore to prevent damage from conductor deflection a staging is used. The currently used staging is scaffolding lumber which is difficult to secure and it's construction efficiency is very low because it requires a lot of time and manpower. So this study developed a insulating defense tube and pipe connecting device, and a truss structure fabrication module using steel pipe which reduces construction time and cost through a compressive and dielectric strength test.

  • PDF

Plastic load bearing capacity of multispan composite highway bridges with longitudinally stiffened webs

  • Unterweger, Harald;Lechner, Andreas;Greiner, Richard
    • Steel and Composite Structures
    • /
    • 제11권1호
    • /
    • pp.1-19
    • /
    • 2011
  • The introduction of the Eurocodes makes plastic design criteria available also for composite bridges, leading to more economical solutions compared with previous elastic design rules. Particularly for refurbishment old bridges with higher actual traffic loads, up to date outside the scope of the Eurocodes, strengthening should therefore be avoidable or at least be necessary only to a minor extent. For bridges with smaller spans and compact cross sections, the plastic load bearing capacity is clearly justified. In this work, however, the focus is placed on long span continuous composite bridges with deep, longitudinally stiffened girders, susceptible to local buckling. In a first step, the elastic - plastic cross section capacity of the main girder in bending is studied as an isolated case, based on high preloads acting on the steel girder only, due to the common assembling procedure without scaffolding. In a second step, the effects on the whole structure are studied, because utilising the plastic section capacity at midspan leads to a redistribution of internal forces to the supports. Based on the comprehensive study of an old, actual strengthened composite bridge, some limitations for plastic design are identified. Moreover, fully plastic design will sometimes need additional global analysis. Practical recommendations are given for design purposes.

전문건설업 유형별 효율성 분석 연구 (A Study on the Efficiency Analysis of Specialty Construction Industry Type)

  • 김예정;유동영;박선구
    • 한국콘텐츠학회논문지
    • /
    • 제19권5호
    • /
    • pp.64-73
    • /
    • 2019
  • 본 연구는 전문건설업체의 경쟁력을 평가하기 위해 DEA모형을 활용하여 효율성을 분석하였다. 분석대상기업은 전문건설업 상장업체와 외감업체로 2010년부터 2017년까지 연속자료가 존재하는 300개 기업을 대상으로 하였다. 특히, 전문건설업 유형별 효율성을 비교, 분석하여 그 시사점을 찾는데 중점을 두었다. 의미 있는 분석결과는 다음과 같다. 첫째, 전문건설업체의 효율성은 전반적으로 종합건설업 등과 비교하면 효율성 값이 낮게 분석되었다. 둘째, 전문건설업 유형별 효율성은 시설물축조 및 해체 전문공사업이 가장 높게 나타났다. 이는 해당 업종인 철근 콘크리트공사업, 비계 구조물해체공사업 등이 전문건설업 내에서 상대적으로 효율적임을 의미한다. 셋째, 전문건설업 효율성은 건설경기에 영향을 받는다. 건설경기가 확장국면에 있을 때는 효율성 값이 높고, 수축국면에서는 낮은 효율성 값을 나타내었다. 마지막으로 규모수익성 분석에서 전문건설업은 DRS로 분석되는 경우가 가장 많았다. 이는 규모 확대보다 규모 축소를 통해 기업의 효율성을 높이는 것이 바람직하다는 것을 의미한다.

대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로- (Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge)

  • 조지훈;김상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.197-201
    • /
    • 2008
  • 국내 도로건설사업은 평균 단가 기준으로 개략공사비를 산정한다. 도로의 기초자료를 갱신함으로써 평균 단가를 수정하고 있으나 공사 특성을 전부 반영하기에는 미흡한 실정이다. 설계 진행단계에서 설계 대안을 평가하는데 활용할 수 있는 공사비 예측모델의 필요성이 제기되는 가운데 대표공정을 통해 표준물량을 산출하고 개략공사비 산정모델개발을 통해 실질적인 공사비 예측이 가능한 모델을 개발하고자 한다. 본 연구에서는 Prestressed Concrete Box Girder Bridge의 상부공사를 중심으로 연구를 수행하며 $2000{\sim}2007$년 사이에 수행되었던 구조물공 41건에 대한 기초자료를 수집하고 토목공사 수량산출기준에 의한 내역서를 기반으로 Grouping을 실시하여 대표적 특수교량인 ILM(Incremental Launching Method), MSS(Movable Scaffolding System), FSM(Full Staging Method), 그리고 FCM(Free Cantilever Method)등 교량 형식별로 총공사비에서 공사비 비중 및 해당 공종에서의 중요도가 높은 항목을 중심으로 설계 초기단계에서 가용한 정보 수준을 고려하여 대표공종 선정한다. 교량 형식별 선정된 대표공종을 살펴보면 P.S.C 강재설치 및 긴장작업/P.S.C BOX/자재대 및 자재운반비/철근가공 및 조립/증기양생/콘크리트 타설/거푸집/교면 방수/동바리 등 교량형식별 특수성을 제외하면 대표공종들이 순공사비에서 차지하는 비중이 비슷함을 알 수 있다. 공종들이 총공사비에서 차지하는 비율은 ILM(99.47%)/ MSS(99.22%)/ FSM(98.18%)/ FCM(98.12%)로 나타났다.

  • PDF

대표공종 기반의 PSC Box 교량 상부공사 개략공사비 산정모델에 관한 연구 (Development of the Approximate Cost Estimating Model for PSC Box Girder Bridge based on the Breakdown of Standard Work)

  • 김상범;조지훈
    • 대한토목학회논문집
    • /
    • 제33권2호
    • /
    • pp.791-800
    • /
    • 2013
  • 국내 도로 건설사업의 사업초기단계에서의 개략공사비 산정은 예비타당성조사, 도로업무편람, 투자평가지침에서 제시하는 도로의 평균단가 또는 표준단가를 기준으로 도출되는데 이는 공사비 산정 표준체계 부재 및 기초자료 갱신 평균단가를 적용하여 공사비를 산출하는 방식으로 본 연구의 대상인 특수 교량공사의 특성을 전부 반영하기에 미흡한 실정이다. 또한, 신속한 의사결정이나 대안선택이 결정되는 설계단계에서 소모적이고 획일적인 공사비 산정방식의 한계점을 개선하고 사업초기단계의 개략공사비산정 프로세스의 효율성 및 신뢰도를 높이기 위한 새로운 공사비 산정 모델을 개발이 요구된다. 이에 본 연구에서는 평균건설단가를 적용하여 개략 공사비를 산출하는 기존 방식에서 벗어나 대표공종 기반의 상세물량입력 모델을 구축하였다. 실적 공사비 데이터 및 공종별 원가자료를 기반으로 토목공사 수량산출 지침서 기준 전체 공종내역 중 공사비 누적비율 대비 95%이상을 차지하는 대표적인 공종을 도출하였다. 상부면적당 대표공종기반 단위물량 및 차로수별 공사비단가를 제시하고, 이를 활용하여 교량형식별로 상부면적당 공사비단가를 도출 및 검증을 통해 사업초기단계에서 업무추진 의사결정의 신뢰적 지원 및 효율적인 공사비 산정방식을 도출 하였다.