• Title/Summary/Keyword: Reservoir Dams

Search Result 201, Processing Time 0.019 seconds

Optimization Technique for Estimation of Potential Hydroelectric Energy at Existion Ahricultural Reservoir (최적화기법을 이용한 기존 농업용 저수지에서의 부존 수력발전량 추정)

  • An, Tae-Jin;Ryu, Hui-Jeong;Park, Jeong-Eung
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.3
    • /
    • pp.281-289
    • /
    • 1999
  • Small-scale hydropower projects at existing agricultural reservoirs can contribute to produce electric energy by maximizing the use of releases from the reservoirs. The irrigation water duration, the reservoir hydropower simulation, and the nonlinear programming model are employed to estimate potential hydroelectric energy at an existing reservoir. The nonlinear programming model consists of finding a maximum hydroelectric energy subject to irrigation water demand constraints. The sample reservoir given a set of inflow and irrigation water is considered. The optimal solutions by the optimization model yield the most hydroelectric energy for the analysis period in the three methods. Consequently, the nonlinear programming model uses the most water for hydropower generation with respect to the total inflow of the sample reservoir. It is also found that additional storage by increasing the normal water level of the sample reservoir does not significantly increase the annual hydroelectric energy for the given reservoir. It is expected that the optimization model and the proposed procedure for estimating potential hydroelectric energy can be applied to evaluate feasibility analysis for small scale hydropower additions at existing agricultural dams.

  • PDF

Change of Ichthyofauna and Fish Communities after Complete Removal of Large Mouth Bass, Micropterus salmoides (Perciformes; Centrachidae) in Farm Reservoir, Korea (농업용저수지에서 생태계교란 생물 배스 Micropterus salmoides 완전제거 후 어류상의 변화 및 군집 분석)

  • Jae Goo Kim;Yun Jeong Cho;Cheol Woo Park;Jong Wook Kim;Su Hwan Kim
    • Korean Journal of Ichthyology
    • /
    • v.35 no.4
    • /
    • pp.270-277
    • /
    • 2023
  • Since its introduction in 1973, the bass, Micropterus salmoides, has spread to dams and rivers in Korea, adversely affecting native fish communities. In this study, after complete removal of bass from Bukchosan Reservoir, an farm reservoir that has lost its function, an attempt was made to indirectly confirm the adverse effects of bass on fish by comparing fish communities in reservoirs of a similar size where bass inhabit. The study was conducted three times a year from 2019 to 2022. As a result of the study, in Bukchosan Reservoir, where the species composition of fish was judged to be simplified due to the habitat of bass, only four species such as Carassius auratus and Rhinogobius brunneus that could be used as a food source for bass appeared before the removal of bass, but after the removal of bass. The appearance and increase of the population of the introduced small freshwater fish (Oryzias sinensis, Rhinogobius giurinus) were confirmed. When comparing Gangjeong Reservoir, Susim Reservoir, which are other reservoirs inhabited by bass investigated in this study, and Bukchosan Reservoir, this result is judged to show a trend of stabilization and recovery of fish species after removal of bass in small reservoirs with high predation pressure of bass.

A Study on Long-Term Seepage Behaviour of Fill Dam by the Monitoring Data Analysis (계측자료 분석에 의한 필댐의 장기 침투거동 연구)

  • Chung, Kyujung;Lee, Song
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.9
    • /
    • pp.15-25
    • /
    • 2010
  • The main objective of this study was to offer informations about long-term seepage behavioral characteristics and to find a leakage safety management method for Juam Dam and Imha Dam, a central cored rockfill dams in Korea by the evaluating the automatically monitored leakage data. In the water leakage monitoring of fill dam, the generation of abnormal water leakage is difficult to directly detect due to the effect of outside factors such as the component of rainfall inherent in the observation value. Therefore, conventionally estimation methods of water leakage quantity were applied by multiple regression analysis considering reservoir water level, rainfall, etc.. However, the estimated error of rainfall component is relatively big in these method. This paper identifies the seepage characteristic of each dams which is not directly affected by rainfall through the hydrograph separation analysis and 3 dimensional analytical method, and thinks a leakage management method. It was noticed that two dams had site specific seepage behaviour features and were in stable state with the decreasing leakage quantity. It was also found that hydrograph separation method might be applicable to leakage safety management method.

Unsteady Flow Model Including a Dam Operation Rule for Flood Control as Internal Boundary Condition (홍수시 댐 운영방안을 내부 경계조건으로 포함하는 부정류 계산모형)

  • Yu, Myoung-Kwan;Jun, Kyung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.12
    • /
    • pp.1043-1054
    • /
    • 2004
  • An unsteady flow model for channel network including various internal boundaries if developed. It is a multiply-connected network model based on the Preissmann's four-point scheme and the Newton-Raphson method, where looped double-sweep algorithm is used. The model is capable of simulating flow through hydraulic structures such as dams and submerged weirs. It can also simulate automatic reservoir operation method (Auto ROM) for flood control, that is to maintain a target water level, by incorporating the strategy to the unsteady flow model as internal boundary condition. The model is applied to the Han River system that includes the downstream reaches of Choongju dam and Hwacheon dam as well as the downstream reach of the Paldang dam. Roughness coefficient for the downstream reach of Choongju dam is estimated. Automatic ROM is presumed for the Paldang, Chungpyung, Euiam, and Choonchun dams. The model is tested using historical flood records, and the flood control strategy is successfully simulated.

A review on sediment replenishment to river channel for natural recovery of regulated rivers below large dams (댐하류 조절하천의 자연성 회복을 위한 하천 유사환원 연구 고찰)

  • Ock, Giyoung;Jang, Chang-Lae;Kim, Bomchul;Choi, Mikyoung
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.spc2
    • /
    • pp.835-844
    • /
    • 2019
  • This study dealt with a systematic approach for sediment replenishment works which defines the artificial supply of coarse sediment to downstream river channels of dams. That is an increasing practice in Japanese, American and European rivers for the purpose of compensating sediment deficits downstream and rehabilitating geomorphological habitats below dams. We introduced five main objectives of the sediment replenishment, simply from construction of artificial spawning redds for anadromous fish to restoration of fluvial geomorphological process of river system. Then we suggested determination of sediment size distribution and quantity of coarse sediment as well as selecting an effective implementation method in corresponding to specific objectives and local restrictions in the basin, reservoir and river.

The Analysis of Sediment Reduction Effect by Installing Check Dams at Domestic Multi-Purpose Dams (국내 다목적 댐의 저사댐 설치에 따른 퇴사저감 효과 분석)

  • Choi, Gye-Woon;Kim, Kwang-Nam;Han, Man-Shin;Yun, Yong-Jin
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.11 no.3
    • /
    • pp.183-189
    • /
    • 2011
  • In this study sediments reduction effects on dam have been analyzed in the case of check dam installation in the upstream. Analyzed sediment reduction effects of 27 points conducted for 10 multi-purposes dam, which is target of this study. According to regression analysis result, Sediment reduction effect by installing check dam has shown inclination which increase as area ratio rises. According to analysis result, sediment reduction effect was greatest in Geum-river point at Daecheong-dam. The life-time is estimated to increases about 60% by installing check dams. When Area ratio increases, it was deduced through regression analysis that rise Sediment Reduction Effect by installing check dam. This study can be useful for the management and design plans like the dam's site or priority for placing. Furthermore, it would be able to construct an efficient sand depositing dam if complementary is provided by being considered catchment area and lucrative property.

Seismic fragility analysis of a cemented Sand-gravel dam considering two failure modes

  • Mahmoodi, Khadije;Noorzad, Ali;Mahboubi, Ahmad
    • Computers and Concrete
    • /
    • v.26 no.6
    • /
    • pp.483-495
    • /
    • 2020
  • Dams are vital infrastructures that are expected to maintain their stability during seismic excitations. Accordingly, cemented material dams are an emerging type, which are being increasingly used around the world owing to benefiting from advantages of both earth-fill and concrete gravity dams, which should be designed safely when subjected to strong ground motion. In the present paper, the seismic performance of a cemented sand and gravel (CSG) dam is assessed using incremental dynamic analysis (IDA) method by accounting for two failure modes of tension cracking and base joint sliding considering the dam-reservoir-foundation interactions. To take the seismic uncertainties into account, the dam is analyzed under a suite of ground motion records and then, the effect of friction angle for base sliding as well as deformability of the foundation are investigated on the response of dam. To carry out the analyses, the Cindere dam in Turkey is selected as a case study, and various limit states corresponding to seismic performance levels of the dam are determined aiming to estimate the seismic fragilities. Based on the results, sliding of the Cindere dam could be serious under the maximum credible earthquake (MCE). Besides, dam faces are mostly to be cracked under such level of intensity. Moreover, the results indicate that as friction angle increases, probability of sliding between dam and foundation is reduced whereas, increases tensile cracking. Lastly, it is observed that foundation stiffening increases the probability of dam sliding but, reduces the tensile damage in the dam body.

Development and application of integrated indicators for assessing the water resources performance of multi-purpose and water supply dams (댐 용수공급능력 안정성 평가를 위한 통합지표 개발 및 적용)

  • Sung, Jiyoung;Kang, Boosik;Kim, Bomi;Noh, Seongjin
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.9
    • /
    • pp.687-700
    • /
    • 2022
  • For comprehensively assessment the water resources performance of multi-purpose dams and water supply dams in South Korea, a methodology was proposed to utilize the durational reliability along with the integrated auxiliary indicators including resiliency, dimensionless vulnerability, water resource efficiency, specific inflow, and specific water supply. In addition, for the purpose of sustainable dam operation in the future, a plan to grade the water resources performance was presented to periodically evaluate the performance and determine the priority of each dam's structural or non-structural planning according to the evaluation results. As major results, in the case of Sumjingang Dam, the durational reliability was 99.0%, but the integrated auxiliary index was the lowest of 44 points, which was 5th grade. This means that despite the current high reliability, hydrological changes due to future climate change or regional change of water demand-supply balance can have significant impacts on the water resources performances. In contrast, the Chungju Dam with a durational reliability of 93.0%, which is below the average among all multi-purpose dams, shows the 76 points of the integrated auxiliary index, which is 3rd highest following the Soyanggang Dam and the Namgang Dam. Nevertheless, due to the size of the basin, the specific inflow is sufficiently high as 185%, so the actual performance could be evaluated relatively high. The water supply dams designed for a single purpose tend to be evaluated relatively high because they have a high proportion of industrial and municipal water supply and have enough room for the supply capacity.

Modifications of nutrient regime, chlorophyll-a, and trophic state relations in Daechung Reservoir after the construction of an upper dam

  • Ingole, Neha P.;An, Kwang-Guk
    • Journal of Ecology and Environment
    • /
    • v.40 no.1
    • /
    • pp.24-33
    • /
    • 2016
  • Background: Previous numerous studies on watershed scale demonstrated that the constructions of upper dams may influence the below dams due to modifications of flow regime and nutrient inputs. Little is known about how the dam constructions influence the downstream lakes or reservoirs in the regional scale. This study demonstrates how the construction of upper dam (i.e., Yongdam Dam) influences nutrient regime, trophic relations, and empirical models in Daechung Reservoir (DR). Yongdam Dam was constructed at the upstream region of DR in year 2000. Results: The analysis of hydrological variables showed that inflow and discharge in the DR were largely reduced after the year 2000. The construction of upper dam construction also resulted in increases of water temperature, pH and conductivity (as an indicator of ionic content) in the DR. Empirical models of TP-CHL and N:P ratio-CHL suggested that stronger responses of CHL to the phosphorus were evident after the upper dam construction, indicating that algal production at a unit phosphorus increased after the upper dam construction. Mann-Kendall tests on the relations of N:P ratios to TN showed weak or no relations ($t_{au}=-0.143$, z = -0.371, p = 0.7105) before the dam construction, while the relation of N:P ratios to TP showed strong in the periods of before- ($t_{au}=-0714$, z = -2.351, p = 0.0187) and after the construction ($t_{au}=-0.868$, z = -4.270, p = 0.0000). This outcome indicates that TP is key determinant on N:P ratios in the reservoir. Scatter Plots on Trophic State Index Deviations (TSIDs) of "TSI(SD) - TSI(CHL)" against "TSI(TP) - TSI(CHL)" showed that the dominance of clay turbidity or light limitation was evident before the upper dam construction [TSI(TP) - TSI(CHL) > 0 and TSI(SD) - TSI(CHL) > 0] and phosphorus limitation became stronger after the dam construction [(TSI(TP) - TSI(CHL) < 0 and TSI(SD) - TSI(CHL) > 0]. Conclusions: Overall, our analysis suggests that the upper dam construction modified the response of trophic components (phytoplankton) to the nutrients or nutrient ratios through the alteration of flow regime, resulting in modifications of ecological functions and trophic relations in the low trophic levels.

The Estimation of Sand Dam Storage using a Watershed Hydrologic Model and Reservoir Routing Method (유역 수문모형과 저수지 추적기법을 연계한 샌드댐 저류량 산정)

  • Chung, Il-Moon;Lee, Jeongwoo;Lee, Jeong Eun;Choi, Jung-Ryel
    • The Journal of Engineering Geology
    • /
    • v.28 no.4
    • /
    • pp.541-552
    • /
    • 2018
  • The implementation of drought measures in the upstream areas of river basins is seldom considered with respect to water supply. However, the demand for such measures is increasing rapidly owing to the occurrence of severe droughts, and interventions on streams and the water supply are needed. Physical interventions are an option to prevent streams from becoming dry and to maintain stream water flow, but dam construction is challenging because of environmental and ecological considerations. Here, a feasibility study was conducted to assess the potential effects of sand dams, which are widely used in arid regions in Africa. The SWAT-K model, which is a hydrologic model used for Korean watersheds, is used to estimate the flow rate of water in an ungauged watershed. The changes in water storage of the sand-dammed reservoir and in downstream flow rates are estimated for two types of sand dam (natural and dredged). The results show that sand dams are capable of increasing the downstream flow rate during normal conditions and of mitigating water supply problems caused by the withdrawal of water during drought periods.