• 제목/요약/키워드: Repair and Replacement

검색결과 455건 처리시간 0.026초

Optimal replacement strategy under repair warranty with age-dependent minimal repair cost

  • Jung, K.M.
    • International Journal of Reliability and Applications
    • /
    • 제12권2호
    • /
    • pp.117-122
    • /
    • 2011
  • In this paper, we suggest the optimal replacement policy following the expiration of repair warranty when the cost of minimal repair depends on the age of system. To do so, we first explain the replacement model under repair warranty. And then the optimal replacement policy following the expiration of repair warranty is discussed from the user's point of view. The criterion used to determine the optimality of the replacement model is the expected cost rate per unit time, which is obtained from the expected cycle length and the expected total cost for our replacement model. The numerical examples are given for illustrative purpose.

  • PDF

Development of Repair and Replacement Cost Management System for Public Buildings to Establish Accurate Facility Management Budgets

  • Choi, Min-Chan;Lee, Chun-Kyong;Jung, Tae-Gab;Park, Tae-Keun
    • Architectural research
    • /
    • 제14권2호
    • /
    • pp.75-83
    • /
    • 2012
  • Buildings that are more than 10 years old generally have considerable repair and replacement costs due to the rapid deterioration of their systems. For public buildings in particular, which have national and social significance, considerable effort is required not only to ensure a long life cycle and safety but also to minimize the overall public expense. Along with increasing repair and replacement requirements, however, there have been problems related to the establishment of an accurate facility management budget. To address these concerns, a repair and replacement cost management system was constructed. This system manages both invested maintenance and forecast costs to establish a reasonable repair and replacement planning process and budget. The effectiveness of the system was verified through a pilot test targeting one of public Corporation (K).

불완전 수리에서의 수리시간한계를 가진 교체모형 (A Repair-Time Limit Replacement Model with Imperfect Repair)

  • 정일한;윤원영
    • 대한산업공학회지
    • /
    • 제39권4호
    • /
    • pp.233-238
    • /
    • 2013
  • This article concerns a profit model in a repair limit replacement problem with imperfect repair. If a system fails, we should decide whether we repair the failed system (repair option) or replace it by new one (replacement option with a lead time). We assume that repair times are random variables and can be estimated before repair with estimation error. If the estimated repair time is less than the specified limit (repair time limit), the failed unit is repaired but the unit after repair is different from the new one (imperfect repair). Otherwise, we order a new unit to replace the failed unit. The long run average profit (expected profit rate) is used as an optimization criterion and the optimal repair time limit maximizes the expected profit rate. Some special cases are derived.

건축물 수선교체주기 산정현황과 개선방안에 관한 연구 (A study on estimation status and improvement plan of the repair and replacement cycle of a building)

  • 김종록;손재호
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.193-198
    • /
    • 2010
  • 연구의 수행결과 얻어진 결과는 다음과 같다. 먼저 문제점으로는 국내의 경우 수선주기와 교체주기에 대한 명확한 구분기준이 없으며 건축공법과 재료성능의 발달 및 건물의 경과연수에 따른 변화대응력을 감안한 수선교체주기를 적용하지 못하고 있다. 즉 25~35년 사이에 리모델링 수준의 대규모 개수가 이루어 질 경우를 고려한 경제적인 수선교체주기의 산정이 필요하다. 수선교체주기의 산정에 있어 외국의 경우, 건물의 용도나 성능수준에 따라 이를 규정하고 있으나 국내의 경우에는 그렇지 못한 현실이다. 이를 개선하기 위해서는 개별건물의 특성을 반영하고, 새로운 건축재료나 공법에 대해 수선교체주기 산정기준을 마련하여야 하며 더불어 수선교체 대상항목의 분류 방식이 건축물 초기공사항목의 기준을 적용할 수 있도록 재편성하는 것이 필요하다. 또한 수선교체 이력데이터의 관리를 통해 기존의 확정적 수선교체주기설정에서 벗어나 건축물의 상태에 기반하여 수선교체주기를 재설정할 할 수 있는 업무기준이 필요할 것으로 판단된다.

THE DEVELOPMENT OF BUILDING MAINTENANCE SYSTEM FOR DETERMINING PRIORITIES OF PUBLIC FACILITY REPAIRS & REPLACEMENT (I)

  • Chun-Kyong Lee;Tae-Gab Jung;Byong-Jin Yu;Tae-Keun Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.376-381
    • /
    • 2011
  • In Korea Water Resources Corporation (K-Water) has seen four problems rising in four aspects of property management of approximately 1,300 buildings scattered through put to country. To solve these, ground data for repair and replacement works to be conducted for prevention will be prepared and building maintenance system (hereinafter referred to as PBMS) intended to record related repair and replacement work histories and calculate LCC of the related these items will be developed. PBMS, a web-based system, will be developed for users' convenience and data monitoring in real time. To sum up, PBMS are expected to maximize efficiency in four aspects including the establishment of repair and replacement work plans for prevention, history management, DB for predicting future work to be occurred and enable the determination of priorities by being developing into facility condition assessment systems through the results of analysis of repair and replacement histories and LCC.

  • PDF

Extended warranty model under minimal repair-replacement warranty policy

  • Jung, Ki Mun
    • International Journal of Reliability and Applications
    • /
    • 제18권1호
    • /
    • pp.1-8
    • /
    • 2017
  • In this paper, we study an extended warranty model under minimal repair-replacement warranty (MRRW) which is suggested by Park, Jung and Park (2013). Under MRRW policy, the manufacturer is responsible for providing the minimal repair-replacement services upon the system failures during the warranty period. And if the failure occurs during the extended warranty period, only the minimal repair is conducted. Following the expiration of extended warranty, the user is solely responsible for maintaining the system for a fixed length of time period and replaces the system at the end of such a maintenance period. During the maintenance period, only the minimally repair is given for each system failure. The main purpose of this article is to suggest the extended warranty and replacement model with MRRW. Given the cost structures incurred during the life cycle of the system, we formulate the expected cost and the expected length of life cycle to obtain the expected cost rate.

  • PDF

Optimal Number of Failures before Group Replacement under Minimal Repair

  • Young Kwan, Yoo
    • 대한안전경영과학회지
    • /
    • 제6권1호
    • /
    • pp.61-70
    • /
    • 2004
  • In this paper, a group replacement policy based on a failure count is analysed. For a group of identical repairable units, a maintenance policy is performed with two phase considerations: a repair interval phase and a waiting interval phase. Each unit undergoes minimal repair at failure during the repair interval. Beyond the interval, no repair is made until a number of failures. The expected cost rate expressions under the policy is derived. A method to obtain the optimal values of decision variables are explored. Numerical examples are given to demonstrate the results.

무료 재생교체-비재생수리보증이 종료된 이후의 교체모형 (Replacement Model Following the Expiration of Free RRNMW)

  • 정기문
    • Communications for Statistical Applications and Methods
    • /
    • 제18권6호
    • /
    • pp.697-705
    • /
    • 2011
  • 본 논문에서는 수리가 가능한 시스템에 대하여 무료 재생교체-비재생수리보증이 종료된 이후의 최적의 교체정책을 제안한다. 이를 위해서, 무료재생교체-비재생수리보증을 정의하고, 사용자 측면에서 무료재생교체-비재생수리보증이 종료된 이후의 보전모형을 고려한다. 최적의 보전정책을 결정하기 위한 기준으로는 사용자 측면의 단위시간당 기대비용을 사용하는데, 이러한 단위시간당 기대비용을 구하기 위해서 사용자측면의 기대순환길이와 총기대비용을 각각 유도한다. 끝으로 본 논문에서 제안된 무료 재생교체-비재생수리 보증이 종료된 이후의 최적의 교체정책을 설명하기 위해서 수치적 예를 살펴본다.

경미한 고장을 수반하는 시스템에 대한 노화 및 예방적 교체 정책 (Preventive Policy With Minor Failure Under Age and Periodic Replacement)

  • 이진표
    • 산업경영시스템학회지
    • /
    • 제45권3호
    • /
    • pp.78-89
    • /
    • 2022
  • The purpose of this study was to propose useful suggestion by analyzing preventive replacement policy under which there are minor and major failure. Here, major failure is defined as the failure of system which causes the system to stop working, however, the minor failure is defined as the situation in which the system is working but there exists inconvenience for the user to experience the degradation of performance. For this purpose, we formulated an expected cost rate as a function of periodic replacement time and the number of system update cycles. Then, using the probability and differentiation theory, we analyzed the cost rate function to find the optimal points for periodic replacement time and the number of system update cycles. Also, we present a numerical example to show how to apply our model to the real and practical situation in which even under the minor failure, the user of system is not willing to replace or repair the system immediately, instead he/she is willing to defer the repair or replacement until the periodic or preventive replacement time. Optimal preventive replacement timing using two variables, which are periodic replacement time and the number of system update cycles, is provided and the effects of those variables on the cost are analyzed.

몬테카를로 시뮬레이션을 활용한 건축물 수선교체주기 신뢰성 분석 모델에 관한 연구 (A study on reliability analysis model of the repair and replacement cycle of a building which utilizes Monte Carlo Simulation)

  • 김종록;정영한;손재호
    • 한국건축시공학회지
    • /
    • 제10권2호
    • /
    • pp.41-50
    • /
    • 2010
  • 본 연구에서는 수선교체이력 자료 및 전문가 의견을 기초데이터로 하고 몬테카를로 시뮬레이션을 활용하여 건축물 수선교체주기에 대한 신뢰성 분석을 가능하게 할 수 있는 모델을 제시하였다. 제시된 모델은 건축물의 경년별 수선교체 시기를 확률적으로 제시하고 건물의 유지관리 계획시 신뢰성분석에 근거한 수선교체시기와 비용수요를 사전에 예측하도록 지원한다. 또한 건물의 소유주체나 유지관리 의사결정권자에게 공통적으로 발생하는 계획상의 많은 리스크를 감소시켜주는 역할을 할 것이다. 더불어 기존건물의 수선교체 이력데이터의 부재로 인해 의사결정에 많은 어려움 겪고 있는 대규모 건물자산의 유지관리책임자가 수선교체소요에 대한 중장기정책 수립시 이에 대한 타당성을 확보할 수 있는 공학적 해법이 제시되었다. 정리하면 크게 다음과 같이 3가지의 연구성과로 나눌 수 있다 첫째, 건축시스템의 발달에 대응할 수 있는 수선교체주기 산정법이 개발되었다. 둘째, 수선교체주기의 리스크를 정량화 시킬 수 있는 확률론적 방법론이 제안되었다. 셋째, 제안된 모델은 건축프로젝트에서 설계자와 시공자가 건물의 생애주기설계에 관한 의사결정을 지원할 수 있는 도구로 활용 가능할 것이다.