• Title/Summary/Keyword: Reconstruction Management

Search Result 577, Processing Time 0.02 seconds

Effect of Dimension Reduction on Prediction Performance of Multivariate Nonlinear Time Series

  • Jeong, Jun-Yong;Kim, Jun-Seong;Jun, Chi-Hyuck
    • Industrial Engineering and Management Systems
    • /
    • v.14 no.3
    • /
    • pp.312-317
    • /
    • 2015
  • The dynamic system approach in time series has been used in many real problems. Based on Taken's embedding theorem, we can build the predictive function where input is the time delay coordinates vector which consists of the lagged values of the observed series and output is the future values of the observed series. Although the time delay coordinates vector from multivariate time series brings more information than the one from univariate time series, it can exhibit statistical redundancy which disturbs the performance of the prediction function. We apply dimension reduction techniques to solve this problem and analyze the effect of this approach for prediction. Our experiment uses delayed Lorenz series; least squares support vector regression approximates the predictive function. The result shows that linearly preserving projection improves the prediction performance.

STUDY ON THE CONTINUED MAINTENANCE FACTOR FOR THE DESIGN OF USER MANUAL IN APARTMENT HOUSING ACCORDING TO THE RESIDENTS' NEEDS

  • Jung-Hee Jung;Hee-Chang Seo;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.235-242
    • /
    • 2013
  • With the recent global trends in environmental preservation, the importance of sustainable construction is being highlighted in Korea. In particular, the trend is being discussed about life cycle of the apartment houses in various aspects. However the Korean construction market and housing policy have been increasingly focusing on supplier. Structures become progressively obsolete after a certain period, but their durability can be extended with proper maintenance management. Accordingly, if maintenance management on the structures is made efficiently, waste of construction energy and damage to the environment and economic loss due to early demolition and reconstruction can be effectively prevented. Therefore, this study aims to suggest the user manual design for the efficient maintenance in apartment housing

  • PDF

Analysis of Impact Structure on Business satisfaction and Continuous Business Intention by the Conflict Solution According to the Process of Reconstruction Projects (재건축사업의 추진 단계별 갈등해결이 사업만족도 및 사업지속의사에 미치는 영향구조 분석)

  • Kim, Hyung-Jin;Lee, Joo-Hyung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.4
    • /
    • pp.500-509
    • /
    • 2015
  • The purpose of this study is to induce a indicator related to the response, handling and management which are appeared on each step of business enforcement in Reconstruction projects. Then, it aims to appropriately and reasonably resolve the conflicts of reconstruction business with relevant subjects. These projects physician satisfaction and continual business was going to have the impact that any analysis of the structure in an evaluation. In addition, this study analyzes the impact structure on the business satisfaction and a intention for continuous business through this evaluation. This study sets a operational hypothesis in order to verify the relationship between the variables. then, it creates the structural model by using the Smart PLS 3.0. After analyzing the impact structure, this study adopts the final Five hypothesis which shows (+) path coefficient as set in the hypothesis and test statistic above 1.65. then, The 'Approval for union establishment(H1)' has a path coefficient of 0.127. In addition, the 'Approval for business enforcement(H2)' has a path coefficient of 0.343. The 'Management and disposition plan(H4)' has a path coefficient of 0.145. and the 'External Factors(H6)' has a path coefficient of 0.124. Finally, The 'satisfaction of business' which affects the 'intention for continuous business(H7)' has a path coefficient of 0.727.

A Study on Dispute Claim to the Apartment Reconstruction Projects (공동주택 재건축 사업의 분쟁 클레임에 관한 연구)

  • Lee, Mi-Ae;Kim, Dea-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.268-273
    • /
    • 2008
  • Because a procedure is complicated and various related parties participate in the redevelopment and reconstruction project, it can be extended to diverse disputes when the relation with the related parties is smoothly adjusted. In particular, when the dispute occurs in a phase of occupancy after the complete construction, the regional residents-centric association must give up many rights of invisible parts caused by the construction company's profit maximization because they are short of professionalism about the business. Accordingly, this study is aimed at providing the construction project manager's dispute and claim process for responding to the dispute or claim reasonably and for obtaining the client's (association) rights for the reconstruction project, and at developing the checklist for obtaining the necessary documents by each phase, when the dispute or claim is made by the association against the construction company after the completion of construction. Through this study, the association can obtain the related documents in advance and can implement the reasonable response data when the dispute or claim occurs due to it. Also, it will enable the construction manager to analyze the project costs reasonably and will reduce the estimated wastes. That is, the work efficiency is expected to be improved.

  • PDF

Comparative Analysis of Earthquake Management in Pohang and Japan (포항 지진과 일본 지진관리 업무 비교·분석)

  • Kim, Su Ran;Kim, Hye Won
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.22 no.3
    • /
    • pp.193-199
    • /
    • 2018
  • This study aims to create a disaster management system after an earthquake. Japan's earthquake disaster management system, including the Disaster Countermeasures Basic Act, addresses all of the disaster phases of prevention, mitigation, preparedness and emergency response as well as recovery and reconstruction with roles and responsibilities among the national and local governments clearly defined. Korea's earthquake disaster management system are including the Disaster Countermeasures Basic, but when the 9.12 earthquake occurred, problems such as insufficient early response, study on the earthquake lack were revealed. This study conducted a field survey and analyzed coping process after Po Hang earthquake. Therefore, this study have found that Disaster Management Headquarters are operated rapidly. They are coped with urgent safety inspection for damage facilities and soil liquefaction with advanced equipment. And The headquarters interviewed with victims. So they found out What the victims needed. However, when carrying out relief activities, Research of temporary housing and allocation of donations was not rapid. Further, this study have found that earthquake specialists were lack and disaster information transfer was not working. This study will be utilized as fundamental data in planning disaster management system after an earthquake.

A Case Study on Risk Factors and Risk Management in a Large-scale Project (대규모 프로젝트의 위험요인과 위험관리에 관한 사례연구)

  • Hong, Sa-Neung
    • The Journal of Information Systems
    • /
    • v.19 no.1
    • /
    • pp.97-116
    • /
    • 2010
  • Failures of super large projects like IT Upgrade of Shinhan Financial Group can be a heavy blow not only to the company but even to the national economy. Research on the practices of risk management in those projects will provide invaluable lessons, enhancing capabilities and chances of successfully executing mission critical projects of the companies and the national economy as a whole. This paper analyzes the risk management of the Core Systems Reconstruction which was the most critical component of IT Upgrade. The analysis covers risk management plans, and identification and evolution, and control and monitoring of risk factors. This study confirms the major results of previous research on risk management in Korea. However, the analysis found as well some discrepancies of practices from the previous research results. This research also tracked the trajectories of evolution of risk factors and management. In particular, in depth analysis of control and monitoring is the first research in Korea on the "management" of risks in IT projects. The result of this research is expected to be a useful guide for theory development and practices of risk management in the future.

A Study on the Plan to Activate Responsible CM through Expert Consciousness Survey in Urban Improvement Projects (Reconstruction·Redevelopment) (도시정비사업(재건축·재개발)에서 전문가 의식조사를 통한 책임형 CM 활성화 방안에 관한 연구)

  • Lee, YunHong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.56-65
    • /
    • 2020
  • Urban renovation projects (reconstruction and redevelopment) have a longer licensing period than general housing projects, and many consultations with the licensing authorities require expertise. Most of the members of the union do not have basic knowledge of the maintenance business, so they have a lot of authority to promote smooth business Is entrusted to the union leader. However, contrary to the original purpose entrusted by the members, it is easy to find a case where the business is suspended because the union leader is exposed to corruption for the private interests of the union, and the members' disputes could not be resolved. In order to overcome this risk, the problem of the maintenance project was found through a questionnaire survey composed of practical experts, and a solution was presented through the KCSI evaluation model. This study mentioned the necessity of a responsible CM that can make independent business decisions without interference from the union, rather than a management-type CM limited to the cooperative's work assistance. In order to promote the construction industry's national role, it was necessary to revitalize responsible CM, so six practical alternatives were proposed.

The sequential management of recurrent temporomandibular joint ankylosis in a growing child: a case report

  • Cho, Jung-Won;Park, Jung-Hyun;Kim, Jin-Woo;Kim, Sun-Jong
    • Maxillofacial Plastic and Reconstructive Surgery
    • /
    • v.38
    • /
    • pp.39.1-39.6
    • /
    • 2016
  • Background: Temporomandibular joint (TMJ) ankylosis in children often leads to facial deformity, functional deficit, and negative influence of the psychosocial development, which worsens with growth. The treatment of TMJ ankylosis in the pediatric patient is much more challenging than in adults because of a high incidence of recurrence and unfavorable growth of the mandible. Case report: This is a case report describing sequential management of the left TMJ ankylosis resulted from trauma in early childhood. The multiple surgeries including a costochondral graft and gap arthroplasty using interpositional silicone block were performed, but re-ankylosis of the TMJ occurred after surgery. Alloplastic TMJ prosthesis was conducted to prevent another ankylosis, and signs or symptoms of re-ankylosis were not found. Additional reconstruction surgery was performed to compensate mandibular growth after confirming growth completion. During the first 3 years of long-term follow-up, satisfactory functional and esthetic results were observed. Conclusions: This is to review the sequential management for the recurrent TMJ ankylosis in a growing child. Even though proper healing was expected after reconstruction of the left TMJ with costal cartilage graft, additional surgical interventions, including interpositional arthroplasty, were performed due to re-ankylosis of the affected site. In this case, alloplastic prosthesis could be an option to prevent TMJ re-ankylosis for growing pediatric patients with TMJ ankylosis in the beginning.

Management of complex surgical wounds of the back: identifying an evidence-based approach

  • Zolper, Elizabeth G.;Saleem, Meher A.;Kim, Kevin G.;Mishu, Mark D.;Sher, Sarah R.;Attinger, Christopher E.;Fan, Kenneth L.;Evans, Karen K.
    • Archives of Plastic Surgery
    • /
    • v.48 no.6
    • /
    • pp.599-606
    • /
    • 2021
  • Background Postoperative dehiscence and surgical site infection after spinal surgery can carry serious morbidity. Multidisciplinary involvement of plastic surgery is essential to minimizing morbidity and achieving definitive closure. However, a standardized approach is lacking. The aim of this study was to identify effective reconstructive interventions for the basis of an evidence-based management protocol. Methods A retrospective review was performed at a single tertiary institution for 45 patients who required 53 reconstruction procedures with plastic surgery for wounds secondary to spinal surgery from 2010 to 2019. Statistical analysis was performed for demographics, comorbidities, and treatment methods. Primary outcomes were postoperative complications, including dehiscence, seroma, and infection. The secondary outcome was time to healing. Results The overall complication rate was 32%, with dehiscence occurring in 17%, seroma in 15% and infection in 11% of cases. Median follow-up was 10 months (interquartile range, 4-23). Use of antibiotic beads did not affect rate of infection occurrence after wound closure (P=0.146). Use of incisional negative pressure wound therapy (iNPWT) was significant for reduced time to healing (P=0.001). Patients treated without iNPWT healed at median of 67.5 days while the patients who received iNPWT healed in 33 days. Demographics and comorbidities between these two groups were similar. Conclusions This data provides groundwork for an evidence-based approach to soft tissue reconstruction and management of dehiscence after spinal surgery. Timely involvement of plastic surgery in high-risk patients and utilization of evidence-based interventions such as iNPWT are essential for improving outcomes in this population.

Artificial Intelligence Based LOS Determination for the Cyclists-Pedestrians Mixed Road Using Mobile Mapping System (인공지능 기반 MMS를 활용한 자전거보행자겸용도로 서비스 수준 산정)

  • Tae-Young Lee;Myung-Sik Do
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.22 no.3
    • /
    • pp.62-72
    • /
    • 2023
  • Recently, the importance of monitoring and management measures for bicycle road related facilities has been increasing. However, research on the monitoring and evaluation of users' safety and convenience in walking spaces including bicycle path is insufficient. In this study, we would like to construct health monitoring data for cylists-pedestrians mixed road using a mobile mapping system, and propose a plan to calculate the level of service of the mixed roads from the perspective of pedestrians and cyclists using artificial intelligence based object detection techniques. The monitoring and level of service calculation method of cylists-pedestrians mixed roads proposed in this study is expected to be used as basic information for planning and management such as maintenance and reconstruction of walking spaces in preparation for the increase of electric bicycles and personal mobility in the future.