• Title/Summary/Keyword: Project Planning Phase

Search Result 234, Processing Time 0.028 seconds

A Study on the Development of a BIM-based Spatial Planning Simulation System for Architectural Planning Stage Support (건축기획단계 지원을 위한 BIM 기반 공간계획 시뮬레이션 시스템 개발에 관한 연구)

  • Choi, Sun-Young;Choi, Ju-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.19-23
    • /
    • 2011
  • The planning stage of an architectural project has much more significant effects on the cost or outcome of the project than other stages of the project. In addition, the importance of architectural planning has been further increasing according to the recent trend of construction projects becoming larger in scale and more complex. In spite of this, the current situation is that the planning stage work is not being systematically managed. Accordingly, the purpose of this study was to develop a BIM-based simulation system for providing support during architectural planning stage such as spatial planning & review, cost review, project owner requirements management, etc. It is easy to review various alternatives using this system that allows not only the modeling of space object modeling but also the instantaneous review of spatial area & layout, cost, etc. based on object information. In addition, it can be used as a communication tool with the project owner as it provides the visualized information and quantitative data of the building model, and the information created through this system can be delivered to the following stage for usage. It is thought that using this system, the entire project work including the architectural planning stage can be supported and even contributing to the advancement of architectural process.

R&D Project Selection Models in the Public Sector (중점연구개발과제 도출을 위한 기술기획 모델-공공부문의 정보통신기술개발계획을 중심으로-)

  • 임명환
    • Journal of Technology Innovation
    • /
    • v.5 no.1
    • /
    • pp.266-287
    • /
    • 1997
  • The purpose of this paper is to purpose methods and procedures by which we can set up technology planning scheme essential for R'||'&'||'D(or technology) planning in public sector (governmental and government-sponsored institutions), and can develop and select "main R'||'&'||'D projects" which are crucial to R'||'&'||'D planning, were quite specifically discussed in case of I'||'&'||'T(Information '||'&'||' Telecommunications) sector, so that they may not remain theoretical but may be practically applicable to real R'||'&'||'D programs. In this paper, the concept of technology planning was defined as a procedure for establishing nominal planning to acquire technologies efficiently for a specific sector. More detailed definition optimal technology-acquisition strategy, i.e., analyzing technological development '||'&'||' environ-ment, establishing R'||'&'||'D objectives as promising technology opportunities, selecting main R'||'&'||'D projects, allocating resources and so on."The"main R'||'&'||'D projects by technology sectors and by planning phases and then deciding on priority. Scoring method was rsed in assessment phase. Summing up, this paper suggested technology planning scheme of methods and procedures for sorting out required technologies, developing and assessing public R'||'&'||'D projects, and finally selecting main R'||'&'||'D projects.

  • PDF

Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project (초고층 복합시설물의 4D CAD 모델링 사례연구)

  • Kwan Oh-Sung;Park Woo-Yul;Cho Hun-Hee;Kang Kyung-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.187-192
    • /
    • 2001
  • High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

  • PDF

A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Construction of RDPPL / SAFE based on Quantification of Feasibility Function (Feasibility Function의 정량화(定量化)에 근거한 RDPPL/SAFE의 기능구축(機能構築))

  • Gwon, Cheol-Sin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.8 no.2
    • /
    • pp.3-14
    • /
    • 1982
  • The purpose of this study is to establish the function of a sub-system for System Alternatives Feasibility Estimation (SAFE) in R & D Project Planning Phase (RDPPL). It is the fundamental function of the RDPPL/SAFE that selected an optimal planning system alternative of all, considered at RDPPL/SAS, by logical means in view of feasibility. In this paper, improving the function of RDPPL/SAFE, mathmatical models in order to quantify methods determining and integrating the feasibility funtion in each terminal system with a multi-stage process are examined.

  • PDF

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

A study on the Improvement Direction of Design Phase Entry Criteria Review for Naval Surface Ships & Onboard Weapon Systems R&D Project (함정 및 함정탑재 무기체계 연구개발사업의 설계단계 진입조건 검토 개선 방향)

  • Kwang Yong Hwang;Dong Myung Seol;Bong Wan Choi
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.1
    • /
    • pp.79-90
    • /
    • 2023
  • In principle, R&D of general weapons systems are led by companies or government-funded organizations. In terms of project execution, the defense R&D planning system was reorganized to conduct SE-based project management by integrating the naval ship project execution procedure into the general weapon system R&D procedure. The development progress was confirmed according to the guide for SE application of DAPA, and a technical review meeting was proposed to enter into the each next phase in the R&D process. This paper focuses on improvement for technical review in terms of technical management based on system engineering for R&D mounted weapon systems and the naval surface ship project in preliminary design and detailed design. So, the improvement direction for reviewing the entry criteria for the R&D weapons systems of the naval ship and mounted weapons is proposed.

An Analysis of Competency at Each Phase of PMC for Overseas Architecture Project Using the IPA (IPA를 활용한 해외 건축 사업 PMC 분야 단계별 업무역량 분석)

  • Ha, Sung-Wook;Lee, Suk-Won;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.59-67
    • /
    • 2015
  • Overseas expansion of domestic construction over the past 10 years has been fast growing. But as a result of simple construction business practices and a focus on EPC, sales margins was reduced. Domestic construction companies have been trying to redirect business to high-value-added-areas but have faced difficulty because there areas are current monopolized by global leading companies in the field of PMC. They have recently carried out 16 PMC related project in order to expand their experience and increase their competitiveness. Most of these construction companies that do PMC overseas have been focusing on the civil engineering sector. analyzing the important and performance result 50 separate PMC tasks in detail using IPA, it became clear that domestic construction companies should also focus on tasks and were analyzed in order to advance to overseas architecture PMC sector overseas. There are large gaps in the importance and performance result of both the planning and pre-construction phase. Importance compared to the current performance levels in the planning phase gap is largest, pre-construction phase has been analyzed in the following order. In particular, one should strengthen detailed tasks in the planing phase. This study is expected to be used as a basic to determine the performance level and tasks items. It is expected strengthen the capacities of domestic companies in the PMC field, for especially in the high value-aded-areas as indicated in the results of the analysis from this study.

Decision-Making Process in Rural Reconstruction Project - An Evaluation Technique for Village Planning in Newly Reclaimed Land - (농촌개발사업의 의사결정기구 -간척지 취락계획을 위한 평가체계의 수립-)

  • 최수형;황한철
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.4
    • /
    • pp.86-94
    • /
    • 1993
  • In this study, a tentative decision-making matrix for village planning in reclaimed land was proposed. The evaluating conditions in the matrix are reclaimed farming acreage and distance. And the indexes for evaluation works are farming acreage required for increasing present farm size to target size in the base of, allowable commuting distance for farming from and effective controlling distance of each village. The village planning strategies are considered into four categories ; upkeep of present village scale, transfer of its superfluous farming acreage to a neighbouring village, enlargement of present village scale and new village construction in reclaimed land. As a case study, the proposed decision-making matrix was applied to 69 villages, which are contiguous to the potential farming area from reclamation works of Yongsan River Basin Comprehensive Development Project Phase Ill and so considered in this study as future farming villages there. From the application results, the following tactics for village planning may be proposed ; principally, upkeep or enlargement of present village scale, but, in an exceptional few cases of standard farming size being 3~5ha, new village construction of normal or satellite scale.

  • PDF