Construction of RDPPL / SAFE based on Quantification of Feasibility Function

Feasibility Function의 정량화(定量化)에 근거한 RDPPL/SAFE의 기능구축(機能構築)

  • Published : 1982.12.31

Abstract

The purpose of this study is to establish the function of a sub-system for System Alternatives Feasibility Estimation (SAFE) in R & D Project Planning Phase (RDPPL). It is the fundamental function of the RDPPL/SAFE that selected an optimal planning system alternative of all, considered at RDPPL/SAS, by logical means in view of feasibility. In this paper, improving the function of RDPPL/SAFE, mathmatical models in order to quantify methods determining and integrating the feasibility funtion in each terminal system with a multi-stage process are examined.

Keywords