Case Study of 4D CAD Modeling in Hi-Rise Complex Buildings Project

초고층 복합시설물의 4D CAD 모델링 사례연구

  • Published : 2001.11.01

Abstract

High-Rise Building Construction Project which has high uncertainty and complexity, causes lots of problems under construction. In particular, the integration between design phase and construction phase highly affects a construction project in terms of cost and time. To possibly make the flexible response and preliminary verification against the construction planning problems in high rise building project, this paper proposes the Engineering-Construction Management System based on 4D CAD that put the time factor together with 3D CAD. The usefulness of this system has been verified through the actual project. It could helps the reducing trials and errors during construction phase by catching the factors on problems of project. Ultimately it will allow users to save project cost and duration by field application.

국내 건설생산체계는 설계단계에 시공성의 반영이 어려워 시공단계에서 많은 시행착오와 잦은 선계변경이 요구되고 있다 특히 불확실성이 높은 도심지 건축될, 그 중에서도 초고층 복합 건물 프로젝트의 경우, 시공과정을 반영한 설계의 중요성은 더욱 중요한 요소가 된다. 본 연구에서는 국내 정보분류체계를 근간으로 기초조사를 통하여 현장의 시공계획에 필요한 데이터를 수집 이를 시스템화 할 수 있는 방안을 모색하였다. 또한, 이를 본 시스템에 적용하여 3D CAD와 공사 계획 및 시뮬레이션 시스템으로 공정 시뮬레이션 및 타워 크레인 시뮬레이션을 구현하여 초고층 공사 수행시 발생할 수 있는 문제점을 미리 검토 및 해결하여 초고층 프로젝트 공사의 합리화와 생산성 향상을 위한 공사관리시스템을 실제 프로젝트에 구현하였다.

Keywords