• Title/Summary/Keyword: Power system operation

Search Result 5,485, Processing Time 0.034 seconds

Operation characteristics of a fault current limiter by high speed interrupter and a superconducting element

  • Im, I.G.;Jung, I.S.;Choi, H.S.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.16 no.3
    • /
    • pp.10-14
    • /
    • 2014
  • Due to continuous increase of electric power consumption, couple of resolutions for improving accuracy in power system like line separation are being studied. The increase of the power demand can cause problems such as supply difficulties of the electricity and broadband outages, failure, etc. When a fault occurs in the power system, a fault current also increases. Fault current creates problems like reduction of lifespan and failure on the power system. In order to resolve these problems, the reduction of initial fault current using the characteristics of superconducting element was applied to fault current limiter. We applied the system to high speed fault current limiter. We found that the superconducting element effectively reduced initial fault current and the fault current was limited by changing operation of high speed interrupter.

Performance Improvement using Auxiliary Converter on HVDC System (보조 컨버터를 이용한 HVDC 시스템의 특성개선)

  • Kim, Dong-Hee;Lee, Hwa-Chun;Park, Sung-Jun;Nam, Hae-Kon;Choi, Joon-Ho;Kim, Kwang-Heon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.2
    • /
    • pp.217-224
    • /
    • 2009
  • This paper presents a new AC/DC converter scheme for HVDC system to achieve a high power factor operation. The new AC/DC converter consists of two 12-pulse bridge converters in series: the primary and auxiliary converters. Ignition angles of the main and auxiliary converters are controlled independently to maintain the nominal DC voltage and control auxiliary voltage. The resulted DC voltage obtained by superimposing the above two phase modulated voltages can be controlled very rapidly over a wide range, and a high power factor operation is achieved. Performance improvements in power factor and harmonic distortion are validated by theoretic derivations and experiments with prototype HVDC system. With the proposed converters, investment for reactive power compensation and filter in HVDC system can be saved significantly.

Transient Study of Electrical Power System on House Load Operation (소내부하 운전시의 전기계통 과도협상 분석)

  • Lim, Jin-Ok;Cho, Sung-Don
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.746-748
    • /
    • 1996
  • House load operation (HLO) is the Willy of a plant to continue to operate while completely separated from the transmission system. HLO capability is recently adopted as basic design requirement for nuclear power plants, since HLO capability increases the plant availability and power system reliability. However, HLO results in the voltage and frequency transients to motors and pumps. This paper presents the computer simulation results such as the transient speeds, voltages, and control system responses of turbine/g enerator during HLO. This paper also suggests the plant design features required for HLO capability and the transient speed/vlitage limits caused by HLO.

  • PDF

Analysis of Maximum Generating Power Drop of PV Module Under the Continuous Artificial Light Irradiation Test Condition (연속 광조사 조건에서의 태양전지모듈의 연간 최대출력 저하율 변화 예측 분석)

  • Kim, Kyungsoo;Yun, Jaeho
    • Current Photovoltaic Research
    • /
    • v.6 no.3
    • /
    • pp.69-73
    • /
    • 2018
  • PV system is consisted with PV module, inverter and BOS(balance of system). To have robustic operation more than 20 years, the expected and guaranteed durability and reliability of products should be met. Almost components of PV system are qualified through IEC standards at test laboratory. But the qualification certificate of product does not ensure long-term nondefective operation. PV module's expected life time is nowadays more than 20 years and annual maximum power degradation ratio would be less than -1%. But the power degradation ratio is basically based on real data more than several years' record. Developing test method for ensuring annual maximum power degradation ratio is very need because there are many new products every month with new materials. In this paper, we have suggested new test method under continuous artificial light irradiation test condition for analyze expected maximum power drop ratio.

Harmonics Measurement and Analysis on Industrial load Facilities (산업용 부하설비의 고조파 측정 및 분석)

  • Han, Wun-Dong;Ji, Pyeong-Shik
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.2
    • /
    • pp.133-139
    • /
    • 2006
  • Harmonics happened due to nonlinear systems such as UPS, SCR controlled motors, and fluorescent lighting in distribute power system is very important subject to optimal operation and control of power system. Harmonics sometimes make incorrect operation of protective relaying system under normal condition on power system. In this study, total harmonics distortion(THD) of power were measured and analyzed by the field test on electrical facilities which were installed at the rural industrial complex in Chungbuk province. In addition, the deprivation of power factor by harmonics and the content of THD which is measured at neutral line was researched.

  • PDF

Application of Linear Tracking to the Multi-reservours System Operation in Han River for Hydro-power Maximization (한강수계 복합 저수지 시스템의 최적 수력발전 운영을 위한 LINEAR TRACKING의 적용)

  • Yu, Ju-Hwan;Kim, Jae-Han;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.32 no.5
    • /
    • pp.579-591
    • /
    • 1999
  • The operation of a reservoir system is necessary for establishing the operation rule as well as designing the reservoirs for water resources planning or management. Increasingly complex water resource systems require more advanced operation techniques. As a result, various techniques have been introduced and applied until now. In this study Linear Tracking model based on optimal control theory is applied to the operation of the largest scale multi-reservoir system in the Han river and its applicability proved. This system normally supplies the water resources required downstream for hydro-power and plays a role in satisfying the water demand of the Capital region. For the optimal use of the water resources the Linear Tracking model is designed with the objective to maximize the hydro-power energy subject to the water supply demand. The multi-reservoir system includes the seven main reservoirs in IIan river such as Hwachon, Soyanggang, Chunchon, Uiam, Cheongpyong, Chungju and Paldang. These reservoirs have been monthly operated for the past 21 years. Operation results are analyzed with respect to both hydro"power energy and water supply. Additionally the efficiency of the technique is assessed.sessed.

  • PDF

A Study on the Characteristics of PCS Using a Solar Cells Generation of Optimal Integrated (최적 일체형 태양광 발전용 전력변환장치 PCS 특성에 관한 연구)

  • Hwang, Lark Hoon
    • Journal of IKEEE
    • /
    • v.23 no.3
    • /
    • pp.1003-1014
    • /
    • 2019
  • In this paper, we modeled the devices used easily in PV system circuits. Simulation tools use PSPICE to enable intuitive electrical circuit simulations. Simulations were also performed on the effects of temperature and spatial radiation that are easy to overlook when using solar cells using modelled libraries. In addition, for full operation of the photovoltaic system, a complete operation system for the DC-DC buck-boost converter and the MPPT(Maximum Power Point Tracking) control system was modeled and simulated to confirm good operation. In order to verify the operation of the simulation, we constructed an actual system with the same conditions in the simulation and experimented. As a result, we proposed a single-phase 3 kW grid-connected solar power converter.

Estimation of CO2 Emission and Emission Cost Function of Thermal Power Plants and Application to 5-Bus Sample Power System (화력발전소의 CO2 배출량 및 배출비용 함수산정과 5모선 전력계통 적용사례)

  • Lee, Sang-Joong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.4
    • /
    • pp.13-18
    • /
    • 2008
  • The global warming due to greenhouse gases is now the hottest issue all over the world. The world has been under $CO_2$ war since the Kyoto Protocol was opened for signature on December 11, 1997 in Kyoto, Japan. The Kyoto Protocol now covers more than 164 countries globally as of July 2006. Countries that ratify this protocol commit to reduce their $CO_2$ emissions, or engage in emissions trading. Korea is also expected to obey the Protocol starting in 2013, which will give a serious shock especially to the electric power industry. The power plants burning the fossil fuel produce more than 20 percent of national total $CO_2$ emission. This paper resents the calculation of the amount and cost of $CO_2$ emission w.r.t. generator MW output and its application to power system operation. The $CO_2$ emission function is derived using the input-output coefficients of the thermal power plants. The optimal power system operation considering $CO_2$ emission and its cost is demonstrated on a five-bus sample power system.

Power Quality Analysis of Wind-Diesel Hybrid Generation System Installation Area (복합발전 풍력-디젤 하이브리드 시스템 설치 지역의 전력품질 분석)

  • An, Hae-Joon;Kim, Hyun-Goo;Kim, Seok-Woo;Ko, Seok-Whan;Jang, Gil-Soo
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2009.06a
    • /
    • pp.539-541
    • /
    • 2009
  • A severely cold weather condition of King Sejong Station, Antarctica becomes a very severe condition for an installation/operation of wind generation system. When the existing wind generation system works, it may cause a damage and destruction of wind generation system and can bring about big problems in terms of the power quality. Accordingly, it is essential to obtain technologies for the installation and operation of small wind generation system for the polar region's wind generation, and to assess and demonstrate the performance in the severely-cold environment and the polar wind generation system's development, supplementation, alteration. Also, as the available power of King Sejong Station, Antarctica, the diesel generator has been mainly used, and the wind generator has been used in the hybrid form. Wind generation and diesel generation has the different load following control each other. In the wind generation, the generated power very rapidly changes according to the change of the velocity of the wind. On the other hand, the diesel generation shows very gentle change in the velocity of output. Therefore, the study is intended to analyze the 10kw small wind generator-diesel generator's power quality of King Sejong Station, Antarctica, which is the hybrid system installation area.

  • PDF

Overvoltage Protection Controller Design of Distributed Generation Connected to Power Grid Considering Islanding Condition

  • Cha, Jae-Hun;Park, Kyung-Won;Ahn, Hong-Seon;Kwon, Kyoung-Min;Oh, Jin-Hong;MAHIRANE, Philemon;Kim, Jae-Eon
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.599-607
    • /
    • 2018
  • Distributed generation (DG) is being highlighted as an alternative for future power supplies, and the number of DG systems connected to conventional power systems is steadily increasing. DG generators are designed using power electronics and can give rise to various power quality problems, such as overvoltage or overcurrent. Particularly, unintentional islanding operation can occur in a conventional power system when the power grid is separated from the DG systems. Overvoltage may occur in this situation, depending on the power generation and power consumption. However, overvoltage phenomena might not happen even when islanding occurs. Therefore, it is necessary to analyze the fault characteristics during islanding. In this study, a fault analysis of islanding operation was carried out using PSCAD/EMTDC, and a countermeasure for the overvoltage problem is proposed.