• Title/Summary/Keyword: Power system analysis program

Search Result 764, Processing Time 0.035 seconds

Design of Power System Analysis Program Based on GUI (GUI 기반 전력계통 해석 프로그램 설계)

  • Kim, Sung-Gu;Lee, Kang-Wan
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.223-225
    • /
    • 2001
  • This paper presents the draft design of power system analysis program based on Graphic User Interface(GUI). According to an increase the power system size, it is not easy for the user to handle the power system analysis program. The power system analysis program based on GUI is necessary in order to increase the productivity of power system analysis tasks.

  • PDF

A Study on Methodology for Automated Contingency and Remedial Action Analysis based on Practical Approach: Development of Automated Scheduled Outage Analysis Tool (실용적 접근 기반의 전력계통 해석 프로그램 상정고장, 해소방안 자동화 기법: 휴전검토 자동화 툴 개발)

  • Song, Jiyoung;Ko, Baekkyung;Shin, Jeonghoon;Han, Sangwook;Nam, Suchul;Lee, Jaegul;Kim, Taekyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.9
    • /
    • pp.1171-1179
    • /
    • 2014
  • ISO(Independent System Operator) or TSO(Transmission System Operator) use power system analysis program to simulate contingency analysis and remedial actions to operate power system stably. Generally, power system analysis program provides automated analysis functions(or modules) to deal with wide area power system. However, because of missed contingency cases, automated contingency analysis has no practical use or has limitation. And in case of remedial action, it doesn't support automated function or takes a lot of times to study, because of simulation in manual for each cases. This paper suggests that new relation with buses and transmission line properties of power system DB used for power system analysis program to simulate automated contingency including all contingency cases needed in the field without missed cases. And it proposes automated remedial action scheme based on practical approach analysis to alleviate overloading or voltage problems. Finally it deals with automated contingency/remedial action analysis(automated scheduled outage) program which is developed by KEPCO and its performance and proposed schemes are proven by case study for real Korean power system data.

Analysis of the Factors Affecting Low-Frequency Oscillations in KEPCO Power System` With Pumped-Storage Plant (한전 전력계통의 저주파 진동현상 요인분석;양수발전기 기동시)

  • Kil Yeong Song;Sae Hyuk Kwon;Kyu Min Ro;Seok Ha Song
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.8
    • /
    • pp.841-849
    • /
    • 1992
  • In power system operation, the stability of synchronous machine has been recognized one of the most important things. AESOPS program developed by EPRI in U.S.A. is a frequency domain analysis program in power system stability and it computes the electro-mechanical oscillation mode. This paper presents how to analyze the power system small signal stability problem efficiently by uusing the AESOPS program and analyze the various factors affecting the damping characteristics of these oscillations in KEPCO power system of 1986 with pumped-storage plant. To reduce the computing time and efforts, selecting the poorly-damped oscillation mode and clustering technique have been used. The characteristics of load, the amount of power flow on the transmission line and the gain of exciter have a significant effects on the damping of the system while the governing system has only a minor one. With the Power System Stabilizers, the stability of the power system has been improved.

  • PDF

A Study on the Development of EDG Engine Condition Diagnosis Program in Power Plant (발전용 비상디젤발전기 엔진 상태진단 프로그램 개발 연구)

  • Lee, Sang-Guk;Kim, Dae-Woong
    • Journal of Power System Engineering
    • /
    • v.19 no.5
    • /
    • pp.67-72
    • /
    • 2015
  • The reliable operation of onsite emergency diesel generator(EDG) should be ensured by a conditioning monitoring system designed to maintain, monitor and forecast the reliability level of diesel generator. The purpose of this paper is to develop condition diagnosis algorithm(logic) and analysis program of engine for the accurate diagnosis in actual condition of emergency diesel generator engine. As a result of this study, we confirmed that developed engine condition diagnosis algorithm and analysis program could be efficiently applied for actual EDG engine in nuclear power plant.

Development of a Data Editor for EUROSTAG Power Flow Calculation (EUROSTAG 조류계산 데이터 편집기 프로그램 개발)

  • Kim, J.I.;Kim, H.M.;Kook, K.S.;Chun, Y.H.;Oh, T.K.;Song, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2000.11a
    • /
    • pp.122-124
    • /
    • 2000
  • This study is focused on developing a program which can edit different formats of power system data used by system operators PSS/E program, which has been widely used as a tool for power system analysis. Provides only a limited function of editing PSS/E input data. Considering that more and more power system analysers will be developed and applied for power system planning and operation in the near future, unified handling of multi-types of power system data format, such as conversion of one input data format into another, is indispensible. In this paper, a new power system data editor, functionally augmented from PSS/E editor, is introduced. The new editing program was developed in GUI environment for users to conveniently edit input data for EUROSTAG program without running several editors. Considerable savings in time and manpower are expected.

  • PDF

Economic Analysis of the Piezoelectric Power using the California Standard Test (캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석)

  • Jung, Soon-Sung
    • Journal of Power System Engineering
    • /
    • v.21 no.4
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.

Program development For software maintenance of existing SCADA system in KEPCO (SCADA 시스템의 소프트웨어 연구 개발)

  • Shin, Keon-Hak;Woo, Hee-Gon
    • Proceedings of the KIEE Conference
    • /
    • 1987.11a
    • /
    • pp.321-324
    • /
    • 1987
  • The development of SCADA system program has been studied for the purpose of upgrading its function and increasing the effect of system application. The results of this project are divided into 3 steps, Analysis of the system function and operating system, Improvement of programs for effective alarm/logging system, Development of programs for the statistical analysis of power system operation.

  • PDF

Analysis of effect on power system considering the maximum penetration limit of wind power (풍력발전 한계운전용량에 대한 계통영향 분석)

  • Myung, Ho-San;Kim, Bong-Eon;Kim, Hyeong-Taek;Kim, Se-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.19-25
    • /
    • 2012
  • About supply and demand to see that you need to match, the limitations of wind power capacity is low demand and the commitment of the general generator will exist between the minimum generation. if the turbine's output can be controlled, The limitation of wind power capacity will be adopted based on instant power generation. Namely, The minimum limits of wind power generation based load operation by calculating the amount that is higher than if the output should be restricted to highest operation. in this paper, we committed to the demand for low enough that the combination of the general generator of wind power capacity to accommodate the operation of determining whether the limit is intended to. For this, power system analysis program PSS/E was used, Jeju system by implementing the model simulations were performed.

Analysis on transient stability for drilling rigs power system (석유 시추선 전력 계통의 과도 안정도 해석)

  • Kim, Yoon-Sik;Kim, Chul-Ho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.9
    • /
    • pp.1119-1124
    • /
    • 2014
  • This paper describes the emergency situation which occurs in Drilling Rig power system. Especially, we focused on power system transient characteristics on propulsion motor load and generator elimination situation in Drilling Rig operation. We performed numerical simulation and analyzed the result for power system transient stability characteristics on each condition for excitation system and governor control system using ETAP (Electrical Transient Analysis Program).