• Title/Summary/Keyword: Post-project environmental management

Search Result 28, Processing Time 0.021 seconds

Improvements of Post-Project Environmental Management for the System of the Sea Area Utilization Consultation (해역이용협의제도의 사후환경관리 개선방안)

  • Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.16 no.2
    • /
    • pp.121-129
    • /
    • 2013
  • This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.

A Study on the Post-management and Improvement of Ecosystem Conservation Fund Return Projects (생태계보전협력금 반환사업 사후관리 실태와 개선 방안)

  • Lee, Ji Hyun;Sung, Hyun Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • This study reviews the current conditions of the completed 'Ecosystem Conservation Fund Return Project' sites to suggest management methods for their conservation and sustainability. For the scope of the study, five microsites of completed return projects in Seoul were selected and their project planning documents were reviewed to help with site surveying and analysis. To increase the accuracy of the site surveying and analysis, and to evaluate the management problems from different perspectives, the site managers were interviewed in-depth. The experts were surveyed as well to develop a realistic and practical improvement method. The survey results helped to categorize the post-management problems, and separate improvement methods were suggested for each category. First, the post-management guidelines are proposed for the ecosystem-based environment/ecosystem environment, user management, and monitoring. These guidelines will increase the expertise and practicality of the management principles. Second, the regulations for the participation of expert management enterprises and the development of separate monitoring or maintenance management team are suggested. These regulations will improve the participation of experts and consistency of management systems. Third, the post monitoring or maintenance management during the year after the project completion should be set as a separate project to secure budget. Furthermore, policies and/or institutions should be established to set a portion of ecosystem conservation return fund or a grant for post monitoring and maintenance management. Forth, as a way of adaptive management, at least more than three years of post-management should be evaluated under detailed categories and vigorous standard to improve the institutional operation for 'Ecosystem Conservation Fund Return Projects'.

A Study on the Analysis of the Importance of Natural Landscape by the Development Project (개발사업에 의한 자연경관 영향 저감방안 중요도 분석에 관한 연구)

  • Shin, Min-Ji;Shin, Ji-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.2
    • /
    • pp.99-117
    • /
    • 2019
  • Environmental impact assessment (EIA), which predicts, evaluates, and manages the influences on natural landscape, plays a role of monitoring natural resources for systematic management of natural landscape. However, the function of verification and correction of the system is still insufficient and feed-back, one of the most important features of EIA follow-up, has not been introduced in Korea's EIA system yet. As a procedure, it is required to check if the opinions of the evaluators are properly reflected to the outcomes of the project through a reviewing process after assessing environmental impacts of a development project. In reality, despite the awareness about the importance of follow-up inspection of the conformity with, the system mainly focuses on the agreement during the planning stage of the development project and fails to continuously manage after its completion. There have been various preceding studies related to prediction, evaluation, and management of environmental impacts on natural landscape for better management. They primarily dealt with the problems in the EIA process and suggested improvement measures, including directions for institutional development, step-by-step goals, and operation methods, to address the problems which arise in the EIA follow-up process. However, suggested measures are not actively applied with the focus only put on institutional operation, there are virtually no standardized methods to predict and assess landscape changes due to the development project and to manage landscape after the project. Against this backdrop, this study aims to explore the existing methods to analyze the impacts natural landscape and to establish a system where landscape management is continued after the development project. To this end, we will suggest reducing methods according to the predicted changes in landscape for post-project management of natural landscape. Characteristics of reduction methods by project type were examined through reviewing the guide to natural landscape rating and the importance of development project impacts on natural landscape by type of reduction was evaluated through questionnaire for experts. Evaluated types of reduction are classified and presented by characteristics of each development project and content of reduction type.

A Method of Improving Air Quality Impact Assessment and Prediction (대기질 영향평가와 예측방법에 대한 개선방향)

  • Park, Jong-Kil;Won, Gyeong-Mee;Kim, Seong-Su
    • Journal of Environmental Science International
    • /
    • v.3 no.2
    • /
    • pp.77-88
    • /
    • 1994
  • When we conduct environmental impact assessment, main contents consist of summary, project outline, environmental conditions, environmental impacts due to the project, mitigation devices, and alternative measures of harmful impact on environment. In this Paper, to understand how they really conduct air quality impact assessment and prediction and examine their effectiveness, we considered the provisions and actual case of environmental impact assessment in Korea with that in Japan. As a result, we propose a method of improving air quality impact assessment and Prediction, such as reflection of the result in environmental impact assessment, detailed assessment focused on relatively important environmental impact elements, field measurement investigation over four season and seven sucessive days, the uniformity of units, the proper model development to predict environmental concentration and a biennial environmental impact assessment for ex post management.

  • PDF

Follow-up Monitoring & Adaptive Management after Ecological Restoration for the Stream - Focused the Hakui Stream in Anyang City - (생태하천 복원 후 모니터링과 적응관리 - 안양시 학의천을 중심으로 -)

  • Choi, jungkwon;Choi, mikyoung;Choi, cheolbin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.18 no.6
    • /
    • pp.85-95
    • /
    • 2015
  • Recent years, nationwide projects for ecological restoration are implemented with emerging issues on the stream ecosystem. In order to enhance effectiveness of the ecosystem restoration and reduce negative impact, the appraisal of effectiveness through the follow-up monitoring and the adaptive management process are executed in consecutive phase. In this study, planning phase, monitoring and adaptive management in Hakui stream which is part of An Yang stream restoration project is introduced as representative ongoing case of effective adaptive management. The aim of this study is to verify the adaptive management process and suggest direction of effective restoration. Restoration project of Hakui stream resulted in increasing number and diversity of species (vegetation, fish, bird, invertbrates, amphibian and reptilia) according to monitoring from 2004 to 2013, and enhancing natural river landscape by evaluation of river naturalness among 2001(before restoration), 2007 (after), 2015 (recent). However, excessive vegetation expansion or sediment deposition on channel over time caused unexpected results such as terrestrialization or degradation of habitats. Adaptive management action such as removing disturbance species (Humulus japonicus)(2007), coppicing willow (2007), release of march snail (2007), creation of wetland (2014) were implemented based on monitoring results. And then appraisal of management action was discussed.

Studies on Establishing an Effective System for the Management after Construction in the EIA Process (사후환경관리시스템을 통한 사후관리의 실효성 확보)

  • Maeng, Jun-Ho;Joo, Yong-Joon
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.1
    • /
    • pp.57-66
    • /
    • 2008
  • Follow-up process consists of two steps. First, it monitors whether project proponents comply with reviews made by KEI. The second steps is to survey environmental impacts during and after implementation of the proposed action. The follow-up requires the proper participation of stakeholders: project proponents, compliance monitors, impact monitors, and environmental agencies approving and reviewing said projects. Currently, follow-up process does not work well because each stakeholder does not play his proper role for various reasons such as mutual distrust among stakeholders and problems associated with institutional settings. This study intends to improve effectiveness of follow-up process and, ultimately, to improve quality of EIA in Korea by devising a follow-up system that delineates clear roles and build a strong network among stakeholders. In order to do so, the study identifies current problems associated with follow-up process and examines basic concepts and procedures involved in it. Secondly, it analyzes relational dynamics among stakeholders to identify what's behind the current mutual distrust. Third, it proposes a way to delineate clear roles to each stakeholder so that follow-up process runs efficient as an organic network.

Suggestion of the Post-Environmental Evaluation of Road-side Cut Slope after Revegetation Works (도로비탈면 녹화공사의 사후환경평가 항목 제언)

  • Kim, Tae-Kook;Kim, Nam-Choon;Kim, Eun-Bum;Koo, Min-Kyu
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.4
    • /
    • pp.75-86
    • /
    • 2018
  • This research was thereby made to study and analysis ecological, landscape, and stability qualities of roadside cut Slopes in expressways and national highways that went through revegetation works. Also, evaluation items and framework for integrated assessment of plant structure and restored state for the maintenance were suggested. Following is the summary of the result. firstly, for stabilization of introduced native plant species on roadside cut slops, assessment on the post-project environmental management through long-term monitoring and maintenance works must be made. It signifies a form of authentic recovery and restoration by the native plants. second, current evaluation framework on the test beds is well managed with clear evaluation standards and table while its method of assessing the post management with only test bed results lacks conformity with this study site. Newly developed evaluation framework on the post construction sites is estimated to be used as assessment standards on any roadside construction sites. Third, after site investigation distinction was observed among different revegetating construction types in the long-term perspective. Due to the different duration time of vegetation state between seed-spray measures(degraded in time) and layer-spray measure(maintained), the use of coarse straw-mat mulching work or Coir net was suggested in long term maintenance of cut slopes. forth, segmentation of post environmental assessment is organized into three large categories of "ecological", "stabile", and "landscape" qualities regarding post restoration quality and stability of slope through native plants with which categories marks 50, 30, 20 points of rates. fifth, components of the post environmental assessment were segmented in twelve categories driving results from former experimental construction and newly focused items on site. In the future, it is possible to propose a customized assessment method considering the location and location of construction work if the research on the application of post-environment assessment methods for road construction surface recording is conducted systematically.

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

A Study on the Need of Specialized Institution for Post-Evaluation of Construction Projects (건설공사 사후평가 전문기관 설치 필요성 연구)

  • Lee, Du-Heon;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.285-295
    • /
    • 2016
  • The post-evaluation system after construction projects can evaluate estimates of use demand, project cost, and project schedule estimated in the planning phase of construction projects in public sector. Thus, it was introduced in 2000 for the purpose of reduction in future errors during similar constructions by project orderer by referring the post-evaluation results. However, many barriers to the post-evaluation system after construction projects have been reported due to evaluation systems that lack objectivity and reliability and lack of main bodies that utilize the system. Thus, this study derived implications for improvements of the post-evaluation system in Korea by benchmarking building project evaluation system and management as well as utilization systems of developed nations. Then this study conducted a survey with experts who have experienced activities in the post-evaluation committee and members of post-evaluation for public project owners. Therefore it identified the need of installation of specialized post-evaluation institutions as well as functions and work tasks to be taken by specialized institutions. Based on the analysis results, this paper provided revision drafts of related legislations and guidelines to be effective in post-evaluation. Through the study results, many trial and errors can be reduced in similar projects in the future by performing in-depth analysis on large-scale construction projects and repeatedly applied building project practices can be improved to raise technical competitiveness if the specialized institution is installed.

ENHANCING UTILIZATION OF BUILDINGS THROUGH INTEGRATED ANALYSIS OF SPACE, USER, AND USER ACTIVITY

  • Tae Wan Kim;Martin Fischer
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.570-575
    • /
    • 2013
  • Enhancing utilization of buildings is gaining in importance in response to a challenging economy; thus, there is a need for a method that analyzes space, user, and user activity in an integrated way to provide project stakeholders with utilization information to support their decision-making about buildings. Conventional methods, such as architectural programming and post-occupancy evaluation, lack a formal relationship between user activity and other information, and therefore, are coarse-grained. This relationship has been formalized by two relatively new methods that provide fine-grained utilization information: workplace planning and space-use analysis. We characterize these two methods with focuses on their usage in different phases (i.e., planning, design, occupancy), required information that needs to be gathered, and the achievement and limitations in terms of three criteria, i.e., consistency, efficiency, and transparency. This characterization would not only help project stakeholders select and use a method that best meets their purposes for enhancing utilization of their buildings, but also provide researchers with promising research topics regarding enhancing utilization of buildings.

  • PDF