• Title/Summary/Keyword: Planning Hierarchy

Search Result 351, Processing Time 0.031 seconds

A Study on Assessment Items Analysis for Eco-corridors' Area - Using the Analytic Hierarchy Process - (생태통로 우선 설치지역의 평가항목 중요도 분석 - AHP 기법을 적용하여 -)

  • Park, Jihee;Yoo, Heonseok;Park, Miyoung
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.5
    • /
    • pp.301-312
    • /
    • 2009
  • Recently, habitat fragmentation and shrinkage has occurred because of increased road construction. As a measures mitigating the adverse effect such as eco-island by road construction, Korea has been installed eco-corridors since 1995. Using the Analytic Hierarchy Process (AHP), this study analyzed the importance of assessment items and the criteria to determine which areas require eco-corridors the most. First, related literature reviews, preliminary surveys, and expert interviews were carried out to develop assessment items and criteria for constructing the hierarchy. Second, experts were surveyed in order to determine the relative importance of the assessment items by applying the AHP. As a result, it found that the restoration of the ecological network was the most important assessment item, followed by wild animal resources in the Level 3. In the Level 4, the eighteen items were ranked in the order of their relative weight and it was found that the 'Baekdudaegan Mountain Range (0.189)' was the highest ranked item. Therefore, this approach can be applied to effective selection of the priority areas in planning eco-corridors in the national scale.

A Study on the Connectivity between the Smart City Comprehensive Plan and Smart City Planning Using the Social Network Analysis - Focusing on Gwangmyeong and Chuncheon Smart City Services (사회연결망 분석을 활용한 스마트도시종합계획과 스마트도시계획간 연결성 연구 - 광명시와 춘천시의 스마트도시 서비스를 중심으로)

  • Kim, Hong Gwang;Yi, Mi Sook
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.36 no.6
    • /
    • pp.601-609
    • /
    • 2018
  • The Smart City Plan specifies that it should reflect the content of the Smart City Comprehensive Plan, which is the upper plan while presenting the basic direction, promotion strategy, service establishment and operation plans of a smart city construction project. However, there are not enough empirical studies on whether plan contents are systematically established according to smart city planning hierarchy. In this study, we are to use the social network analysis to find out the local government's smart city plan is actually highly connected to the Smart City Comprehensive Plan, a master plan at national level. To this end, we conducted a social network analysis on Gwangmyeong and Chuncheon, which were recently approved for smart city planning. First, 108 keywords were derived from the 2nd Smart City Comprehensive Plan, and the connectivity between these keywords and Smart City Planning was analyzed. The results of the social network analysis showed that the total connections of Smart City Planning in Gwangmyeong was 371, which was higher than 307 in Chuncheon, and the average degree of connection per keyword and network density were also higher in the Gwangmyeong Smart City Planning than the Chuncheon Smart City Planning. The results of the study showed that the Smart City Planning actually had a high connectivity with the Smart City Comprehensive Plan, and the keywords with high connection centrality were different for each local government. The result of this study can be used as a basis for judging whether there is a high correlation between plans.

Deriving of Critical Factors for Construction Planning in Large Span Roof Construction (대공간 지붕 철골공사의 시공계획 중점관리항목 도출)

  • Lee, Myungdo
    • Journal of Korean Association for Spatial Structures
    • /
    • v.18 no.1
    • /
    • pp.67-75
    • /
    • 2018
  • Steel roof construction is on the most important and critical factors in the large spatial construction and necessary to be prepared under a radical planning. Therefore, the major management factors of steel roofing structure assembly must be critically reviewed during planning. Through the review process, it is necessary to reduce the construction cost, to prevent delays in the construction schedule, and to minimize construction errors. However, domestically due to the lack experience in large spatial constructions, a planning of roof construction is limited to have a radical planning. Especially due to unclear organization of the management factors in hierarchy, using them in reality for construction planning is difficult and reliability is low. Therefore, in this study, the goal is to conduct the major management factors in the large spatial construction. To achieve this, we have reviewed and analyzed the numbers of construction plans and construction reports and conducted a total 68 of the management factors. Based on the conducted factors, we have interviewed 16 experts with experience in large spatial construction. From the interview result, we have deduced the factors scored above 4.20 of 10 for critical factors. The results of this study will be used as a guidance for planning steel roofing structure assembly in large spatial construction. The critical factors will be provided to the site mangers for the quality management of large spatial constructions in practice.

A Study on Critical Success Factor Analysis and its Usage : An Aplication Study to the Steel Industry in Korea (주요성과요인분석과 그 활용방안에 관한 연구 :한국 철강산업에의 적용사례)

  • 문태수;신영종
    • Korean Management Science Review
    • /
    • v.8 no.1
    • /
    • pp.13-25
    • /
    • 1991
  • Over the past few years, there has been a growing interest in using information technology for competitive advantage. A sustainable advantage is the key to the survival and growth of a firm. The successful implementation of information technology is dependent on efficient information systems planning. But the correct and complete information, requirements for effective information systems planning are frequently very difficult to obtain. In this paper the Critical Success Factors(CSF) method was employed as a means of managerial information requirements analysis for information systems planning in Korea's steel industry. CSFs are one of the few areas of activity that must go well to ensure the success of an organization. This paper addresses the concept and hierarchy of CSF analysis as a methodology in identifying corporate information needs and concludes with the use and benefit of results of CSF analysis.

  • PDF

정보통신표준화분야 우선순위결정을 위한 방법론 연구

  • 박기식;구경철;서의호
    • Korean Management Science Review
    • /
    • v.11 no.3
    • /
    • pp.129-151
    • /
    • 1994
  • This paper focuses on method of setting priorities for telecommunications Standardization in which usually includes prioritization, resource allocation, standardization schedule for each SWA is based on prioritization of SWAs. We mainly used the Analytic Hierarchy Process(AHP) and a modified Delphi technique as a method for planning process. Recently, rapid technology evolution in telecommunications fields increases the necessity of developing more and more new standards. Also increased complexity of technologies makes standards more complicated, more specified and more thick than the past ones. As a result, the number of SWAa(Standardization Work Areas) and SWIs(Standardization Work Iterms) is being increased continuously. Furthermore, rapid telecommunication environment changes such as deregulation, liberalization, privatization, regionalization, and globalization surrounding telecommunications standardization grows increasingly important. To cope with these challenges and to make the more efficient use of the limited standardization resources, i.e., time, financial, personal resources, we will suggest logical and rational approach that is a backbone of strategic plan for telecommunication standardization. The telecommunication standardization planning process involves a MCDM(Multi-Criteria Decision Making) process. The Analytic Hierarchy Process(AHP) is a kind of MCDM approach. Our method is based on a combination of a modified Delphi technique and an application of AHP(spreadsheet model). Analyzed data from Delphi technique is used as inputs to AHP. In addition we also focus on the technique how to combine group judgments and to handle a large number of comparisons.

  • PDF

A Study on the Development of Green-tourism Performance Indicators by Using BSC on Rural Village (BSC에 의한 농촌마을 그린투어리즘 성과지표 개발에 관한 연구)

  • Um, Dae-Ho;Kim, Dae-Sik;Kim, Tai-Cheol;Kim, Eun-Soon
    • Journal of Korean Society of Rural Planning
    • /
    • v.12 no.3 s.32
    • /
    • pp.43-55
    • /
    • 2006
  • Recently, increases of leisure activities and 5-day workweek system enforce government employ rural tourism policy and projects. Operating projects are Green Rural Experience Village, Rural Tradition Theme Village, etc. In this study under investigation of Green Rural Experience Village site, Green-Tourism performance indicators were developed. Green-Tourism performance indicators of rural village were developed by BSC(balanced scorecard) and AHP(Analytic hierarchy process). Four perspective of BSC are divided into financial perspective, customer, internal-business process, and teaming and growth perspectives. To develop green-tourism performance indicators of rural village, low perspectives of BSC are converted into investment effect, visitor, internal process, and village inhabitants perspectives. By these perspectives, green-tourism performance indicators of rural village were developed. Weighting values on importance were calculated by AHP. Performance indicators developed in this study applied in 12 villages. With the result, generally well-known villages gained high score, and in accord with survey content.

Selecting Strategic Energy Technology R&D Programs Applied to the AHP Approach as Planning a Big-sized Energy R&D Program (대형과제 기획시 계층분석적 의사결정기법을 적용한 전략적 에너지기술 R&D 프로그램 선정)

  • Lee, Seong-Kon;Mogi, Gento;Kim, Jong-Wook
    • New & Renewable Energy
    • /
    • v.4 no.1
    • /
    • pp.25-30
    • /
    • 2008
  • The R&D budget of energy technology development has increased in the sector of korean energy technology development continuously. In addition to that, KIER, the government invested research institute and unique energy technology R&D research institute, is trying to plan for a big-sized energy R&D program for the well focused R&D and excellent research outcomes. In the phase of R&D process, the planning is one of the most important sectors because it drives the direction of R&D. In this study, we suggest the assessment criteria to select a strategic energy technology R&D programs by the analytic hierarchy process, which is one of multi-criteria decision making method (MCDM)We structure 2 tiers of hierarchy for assessing a big-sized R&D program and also establish 6 criteria in the level 1, which are energy environment, economic spin-off, technical spin-off, marketability, KIER mission, and cost. We allocate the relative weights of criteria by checking the values of consistency ratio as making pairwise comparisons. The result of this research will provide the decision makers as they select a right well focused R&D program.

  • PDF

Selecting strategic energy technology R&D programs applied to the AHP approach as planning a big-sized energy R&D program (대형과제 기획시 계층분석적 의사결정기법을 적용한 전략적 에너지기술 R&D 프로그램 선정)

  • Lee, Seong-Kon;Mogi, Gento
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2007.11a
    • /
    • pp.690-693
    • /
    • 2007
  • The R&D budget of energy technology development has increased in the sector of Korean energy technology development continuously. In addition to that, KIER, the government invested research institute and unique energy technology R&D research institute, is trying to plan for a big-sized energy R&D program for the well focused R&D and excellent research outcomes. In the phase of R&D process, the planning is one of the most important sectors because it drives the direction of R&D. In this study, we suggest the assessment criteria to select a strategic energy technology R&D programs by the analytic hierarchy process, which is one of multi-criteria decision making method (MCDM). We structure 2 tiers of hierarchy for assessing a big-sized R&D program and also establish 6 criteria in the level 1, which are energy environment, economic spin-off, technical spin-off, marketability, KIER mission, and cost. We allocate the relative weights of criteria by checking the values of consistency ratio as making pairwise comparisons. The result of this research will provide the decision makers as they select a right well focused R&D program.

  • PDF

R&D Project Selection Methodology for Green Technology : Focused on Developing Country-Oriented Technology Commercialization (녹색기술 유망 R&D 과제 선정 방법론 : 개도국향 기술사업화를 중심으로)

  • Park, Chulho;Han, Joon;Ku, Jisun;Lee, Sanghoon;Lee, Hakyeon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.43 no.1
    • /
    • pp.49-61
    • /
    • 2017
  • This paper proposes an R&D project selection methodology for green technology centered on developing country-oriented technology commercialization. Eight selection criteria are derived from the R&BD logic model : technology needs of developing countries, effectiveness of green technology, technological potentials, domestic technological capability, commercialization feasibility, economic benefits, business feasibility, and spillover effects of developing countries. 21 qualitative and quantitative indicators are then defined for each criterion. The analytic hierarchy process is conducted to produce relative importance of evaluation indicators and to set final priority scores of R&D project candidates. The working of the proposed methodology is provided with the help of a case study example of Green Technology Center. The proposed methodology is expected to be effectively utilized for policy practices of R&D project selection in the field of green technology.

The Implication of Changes on Unit Plans of Condominium Apartments in Rural Area depended on Women's Spaces (수도권 신도시 근교 농촌 아파트 주거의 내부 공간구조 변화 - 주부인 여성이 주로 사용하는 공간을 중심으로 -)

  • Choi, Byung-sook
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.12 no.2
    • /
    • pp.13-22
    • /
    • 2010
  • This study is to analyze women's power in family to be related to Anbang, kitchen, dining room, and utility room planning in a unit plan of condominium apartment housing in rural area Data were collected 194 unit plans from 9 eastern regions of Kungi-Do. The results are as followed: 1) Anbang reflects the women's power on changing its space character into mater bedroom, the highest hierarchy in private zone, and planning a dress room in it. 2) Dining room and kitchen is openly centered on the unit plan, but kitchen is still only women's working space for family and agriculture depended on literature review. Dining space is not activated family interaction, so it is not different from urban apartment housing. However, its location and character are changed, and its hierarchy is relatively higher with women. Dining room and kitchen tend to plan visually separated after 2001, so its trend seems to establish women's territory at home. 3) Whole family can't be easy to access utility and back balcony close to kitchen, and these spaces are functionally separated for women's house work. This design trend seems to establish for women's area. 4) Finally, women's power seems to be effective in house working area including kitchen space depended on results. Also, these results from rural condominium apartment are similar to urban ones in previous study.