• Title/Summary/Keyword: Pit excavation volume

Search Result 13, Processing Time 0.018 seconds

A Study on Computing Pit Excavation Volume by Terrain Surface Approximation (지형곡면해석에 의한 토공량 계산에 관한 연구)

  • 문두열;정범석
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.6
    • /
    • pp.37-43
    • /
    • 2002
  • The calculation of earthwork plays a major role in the plan or design phase of many civil engineering projects, such as seashore reclamation; and thus, it has become very important to improve upon its accuracy. There have been common drawbacks to earlier methods of ground profiling, such as dialing with sharp corners or the grid points of any tow straight lines. In this paper, we prepose an algorithm for finding a terrain surface using the natural boundary conditions and the both direction spline method, which interpolates the given three-dimensional data by using spline. As a result of this study, the algorithm of the proposed two methods to estimate pit excavation volume should provide a better accuracy than Spot height, Chambers, Chen, or Lin method. Also, the mathematical model mentioned offers maximum accuracy in estimating the volume of a pit excavation.

A Study on the Reclamation Earthwork Calculation Formula (매립토공량 계산식에 관한 연구)

  • 이용희;문두열
    • Journal of Korean Port Research
    • /
    • v.15 no.1
    • /
    • pp.87-97
    • /
    • 2001
  • The calculation of earthwork plays a major role in plan or design of many civil engineering projects, and thus it has become very important to advanced the accuracy of earthwork calculation. Current method used for estimating the volume of pit excavation assumes that the ground profile between the grid points is linear(trapezoidal rule), or nonlinear(simpson's formulas). In this paper the spot height method, least square method, and chamber formulas, Chen and Lin method are compared with the volumes of the pits in these examples. As a result of this study, algorithm of chen and Lin me쇙 by spline method should provide a better accuracy than the spot height method, least square method, chamber formulas. The Chen and Lin formulas can be used for estimating the excavation volume of a pit divide into a grid with unequal intervals. From the characteristics of the cubic spline polynomial, the modeling curve of the Chen and Lin method is smooth and matches the ground profile well. Generally speaking, the nonlinear profile formulas provide better accuracy than the linear profile formulas. The mathematical model mentioned make an offer maximum accuracy in estimating the volume of a pit excavation.

  • PDF

Spline Surface Approximation for Computing Pit Excavation Volume with the Free Boundary Conditions

  • Jaechil Yoo;Lee, Seung-Hoon;Mun, Du-Yeoul
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2002.04a
    • /
    • pp.229-238
    • /
    • 2002
  • The calculation of earthwork plays a major role in plan or design of many civil engineering projects, and thus it has become very important to improve the accuracy of earthwork calculation. In this paper, we propose an algorithm of finding a cubic spline surface with the free boundary conditions, which interpolates the given three dimensional data, by using B-spline and an accurate method to estimate pit-excavation volume. The proposed method should be of interest to surveyors especially concerned with accuracy of volume computations. We present some computational results showing that our proposed method provides good accuracy.

  • PDF

Spline Surface Approximation for Computing Pit Excavation Volume with the Free Boundary Conditions

  • Yoo, Jae-Chil;Lee, Seung-Hoon;Mun, Du-Yeoul
    • Korean Journal of Geomatics
    • /
    • v.2 no.1
    • /
    • pp.25-29
    • /
    • 2002
  • The calculation of earthwork plays a major role in plan or design of many civil engineering projects, and thus it has become very important to improve the accuracy of earthwork calculation. In this paper, we propose an algorithm for finding a cubic spline surface with the free boundary conditions, which interpolates the given three dimensional data, by using B-spline and an accurate method to estimate pit-excavation volume. The proposed method should be of interest to surveyors especially concerned with accuracy of volume computations. We present some computational results showing that our proposed method provides good accuracy.

  • PDF

A Study on the Pit Excavation Volume Using Cubic B-Spline

  • Mun, Du-Yeoul
    • International Journal of Ocean Engineering and Technology Speciallssue:Selected Papers
    • /
    • v.5 no.1
    • /
    • pp.40-45
    • /
    • 2002
  • The calculation of earthwork plays a major role in the planning and design phases of many civil engineering projects, such as seashore reclamation; thus, improving the accuracy of earthwork calculation has become very important. In this paper, we propose an algorithm for finding a cubic spline surface with the free boundary conditions, which interpolates the given three-dimensional data, by using B-spline and an accurate method to estimate pit-excavation volume. The proposed method should be of interest to surveyors, especially those concerned with accuracy of volume computations. The mathematical models of the conventional methods have a common drawback: the modeling curves form peak points at the joints. To avoid this drawback, the cubic spline polynomial is chosen as the mathematical model of the new method. In this paper, we propose an algorithm of finding a spline surface, which interpolates the given data, and an appropriate method to calculate the earthwork. We present some computational results that show the proposed method, of the Maple program, provides better accuracy than the method presented by Chen and Lin.

  • PDF

On Estimating Pit-Excavation Volume using Spline Surfaces without Boundary Conditions (경계조건이 없는 스플라인 곡면을 이용한 토공량 결정에 관한 연구)

  • Yoo, Jae-Chil;Mun, Du-Yeoul
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.1
    • /
    • pp.5-12
    • /
    • 2010
  • It is very important to get the accurate calculation of pit-excavation volume in many civil engineering projects. There have been common drawbacks to earlier methods of ground profiling, such dealing with sharp corners or the grid points any two straight lines. There are several papers of using spline surfaces to obtain more accurate calculations of the earthwork. In this paper, we propose an algorithm of finding a spline surface without boundary conditions which interpolates the given data and an appropriate method to calculate the earthwork. We present some computational results showing that our proposed method provides good accuracy.

A Study on the Pit Excavation Volume Using Cubic B-Spline

  • Du-Yeoul Mun
    • Journal of Ocean Engineering and Technology
    • /
    • v.16 no.4
    • /
    • pp.19-24
    • /
    • 2002
  • 항만공사같은 대규모의 매립공사에서 토공작업은 총공사비의 상당한 비중을 차지하므로 경제적인 시공을 위하여 절.성토량은 정확하게 계산되어야 한다. 따라서 본 연구는 주어진 3차원 표고데이터를 지나는 스플라인 곡면을 구하는 알고리즘을 제시함으로써 좀더 정확한 토공량 계산식의 결정을 목표로 한다. 스플라인에 대한 흥미로운 수학적 결과는 무척 많지만 본 연구에서는 스플라인 곡면을 기술하고 또, 그것을 이용하여 토공량 계산을 위한 알고리즘개발을 목표로 하기 때문에 알고리즘과 프로그래밍에 필요한 수학적 내용을 기술하며 그 수치적 계산결과는 Maple 프로그램을 이용하였다. 그리고 정확도를 비교하기 위하여 기존의 방법인 선형점고법, Chamber법, Chen과 Lin의 이론을 컴퓨터프로그램하여 본 연구에서 제시된 방법과 정확도를 비교, 분석한다. 아울러 각 이론식의 결과에 대한 보다 정확한 검사를 위하여 x, y 함수식을 이용한 실험지형을 인위적으로 만들었으며 그 때의 값을 기준값으로 하였다. 따라서 실험수치지형에 대한 기준값이 절대값에 가까우므로 각 토공량식들의 오차규명을 보다 명확하고 확실하게 비교할 수 있도록 하였다.

A Terrain Surface Approximation Using the Hermite Function (Hermite함수를 이용한 지형곡면근사)

  • 문두열;정범석;이용희
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.3
    • /
    • pp.265-272
    • /
    • 2002
  • By this time, many methods have been developed for computing the pit excavation volumes, ranging from a simple formula to more complicated numerical methods. Earlier the standard methods for pit excavation volume computation requires that the considered area be divided the boundary ranges of x and y directions into a rectangular grid. whereas these methods may not calculate the estimation of pit excavation volume that is often required in many surveying situation exactly. In Easa methods(1998), the rectangular grid is divided into the same linear in the range x and y directions respectively. This method employs a cubic Hermite polynomial for individual intervals in both directions of the grid. Because the height data over the same boundary of x and y interval ranges have to be exist, it is not possible to choose the governing points of the terrain boundary such as points of maximum and minimum height. In this study, a method of volume computation, that combines the advantages of Easa methods(1998) and avoids the drawbacks of it, is presented. The proposed method employs a cubic Hermite polynomial for individual intervals in both directions of the non-grid, the all over intervals of it may be unequal grid x in width and y in length y, partially. The new proposed method should produce better accuracy than the other conventional methods.

On the Reclamation Earthwork Calculation using the Hermite and Spline Function (Hermite와 Spline 함수를 이용한 매립토공량 계산)

  • Mun, Du-Yeoul;Lee, Yong-Hee;Lee, Mun-Jae
    • Journal of Navigation and Port Research
    • /
    • v.26 no.4
    • /
    • pp.473-479
    • /
    • 2002
  • The estimation of the volume of a pit excavation is often required in many surveying, soil mechanics, highway applications and transportation engineering situations. The calculation of earthwork plays a major role in plan or design of many civil engineering projects such as seashore reclamation, and thus it has become very important to improve the accuracy of earthwork calculation. In this paper the spot height method, proposed formulas(A, B, C), and chen and Line method are compared with the volumes of the pits in these examples. And we proposed an algorithm of finding a terrain surface with the free boundary conditions and both direction spline method drawback, i.e., the modeling curves form peak points at the joints. To avoid this drawback, the cubic spline polynomial was chosen as the methematical model of the new method. From the characteristics of the cubic spline polynomial, the modeling curve of the new method was smooth and matched the ground profile well. As a result of this study, algorithm of proposed three methods to estimate pit excavation volume provided a better accuracy than spot height, chamber, chen and Lin method. And the mathematical model mentioned makes is thought to give a maximum acccuracy in estimating the volume of a pit excavation.

Analysis of the Disposal Tunnel Spacing and Disposal Pit Pitch for the HLW Repository Design (심지층 처분시설 설계를 위한 처분터널 및 처분공 간격 분석)

  • Lee, Jong-Youl;Kim, Seong-Ki;Kim, Jhin-Wung;Choi, Jong-Won;Hahn, Pil-Soo
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.3 no.4
    • /
    • pp.349-358
    • /
    • 2005
  • In this study, analysis of the disposal tunnel spacing and disposal pit pitch was carried out, as a factor of the design to estimate the scale and layout of the repository. To do this, based on the reference repository concept and the engineered barrier concept, several cross sections of the disposal tunnel and disposal pit were established. After then, the mechanical and thermal stabilities of the established tunnels were analyzed. Also, an optimized disposal tunnel spacing and the disposal pit pitch reducing the excavation volume was proposed. The results of these analyses can be used in the deep geological repository design. The detailed analyses by the exact site characteristics data to reduce the uncertainty of the site and the modification for the optimization are required.

  • PDF