• Title/Summary/Keyword: Overseas Plant

Search Result 199, Processing Time 0.033 seconds

Bipolaris Stem Rot of Cactus Caused by Bipolaris cactivora (Petrak) Alcorn (Bipolaris cactivora(Petrak) Alcorn에 의한 접목선인장 줄기썩음병)

  • Chang, Mee;Hyun, Ik-Hwa;Lee, Young-Hee
    • Korean Journal Plant Pathology
    • /
    • v.14 no.6
    • /
    • pp.661-663
    • /
    • 1998
  • Bipolaris stem rot of cactus severely occurred up to 77% at the field of Koyang and Kimcheon from 1996 to 1997. The symptom was initially light yellow, water soaked round lesion, subsequently turned light brown and dried to death. The causal fungus was identified as Bipolaris cactivora (Petrak) Alcorn. Conidia were obclavate to fusoid, rounded ends, light brown color, 1~4 septate, and conidial size was 23~42$\times$6~9 ${\mu}{\textrm}{m}$ (av. 32.5$\times$7.5 ${\mu}{\textrm}{m}$). Conidiophores were caespitose, straight, pale to golden brown and 67~280 ${\mu}{\textrm}{m}$ in length. When healthy cacti were inoculated with the isolates obtained form the lesion of diseased plants, the same characteristic symptoms as those in the field were produced. The symptom of four-month-old cactus was developed more rapidly than that of six-month-old cactus. The pathogen was reisolated from the artificially inoculated lesions.

  • PDF

Economic Feasibility Analysis of an Overseas Green Hydrogen Supply Chain (해외 그린수소 공급망 경제성 분석)

  • HAEJUNG HWANG;YESEUL LEE;NAKHYUN KWON;SUHYUN KIM;YOUNGDON YOO;HYEJIN LEE
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.33 no.6
    • /
    • pp.616-622
    • /
    • 2022
  • At the present time, interest in hydrogen is increasingly growing worldwide to tackle climate change. Korea also takes an action by announcing the first hydrogen economy implementation basic plan with the import targets of 22.9 million tons of hydrogen from oversea in 2050. To achieve this plan, it is very essential to establish an overseas hydrogen supply chain. In this paper, the study estimates the import price for hydrogen into basic scenario and comprehensive scenario, and also analyses economic feasibility considering price of the each technology.

Economic Feasibility Comparison of Overseas Green Ammonia Project Using Renewable Energy (신재생 에너지를 이용한 해외 그린 암모니아 프로젝트에 대한 경제성 비교)

  • Hyun-Chang Shin;Hak-Soo Mok
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.3
    • /
    • pp.547-553
    • /
    • 2024
  • Hydrogen is considered a key energy source to achieve carbon neutrality through the global goal of 'Net Zero'. Due to limitations in domestic green hydrogen production, Korean companies are interested in importing green hydrogen produced overseas. Because Australia and the Middle East possess high-quality renewable energy resources, they are attracting attention as suitable regions for producing green hydrogen using renewable energy. The cost of constructing and operating a green ammonia plant varies depending on the region. In this study, an economic feasibility comparison of green ammonia plant construction in Australia and the Middle East is conducted. Through this, it is expected to contribute to the economic analysis and feasibility analysis of the project to import hydrogen in the form of green ammonia into Korea.

Preliminary Economic Analysis based on Optimization of Green Ammonia Plant Configuration in the Middle East for Import into Korea

  • Hyun-Chang Shin;Hak-Soo Mok;Woo-Hyun Son
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.27 no.2_1
    • /
    • pp.277-285
    • /
    • 2024
  • Hydrogen is considered a key energy source to achieve carbon neutrality through the global goal of 'net zero'. Due to limitations in producing green hydrogen domestically, Korean companies are interested in importing green hydrogen produced overseas. The Middle East has high-quality solar energy resources and is attracting attention as a region producing green hydrogen using renewable energy. To build a green ammonia plant, optimization of the production facility configuration and economic feasibility analysis are required. It is expected that it will contribute to reviewing the economic feasibility of constructing overseas hydrogen production plants through preliminary economic feasibility analysis.

A Study on Risk Analysis and Relevant Measures for the Successful Performance in Overseas Construction Projects - Including Case Analysis on A Overseas Construction Project - (해외건설 프로젝트의 성공적 수행을 위한 위험요소 및 대처방안에 대한 연구 - 해외건설 사례분석을 포함하여 -)

  • Kim, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.215-250
    • /
    • 2011
  • Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.

  • PDF

Application of 275kV XLPE Power Cables for Overseas Protect (275kV XLPE절연 전력케이블의 해외프로젝트 적용)

  • Kwon, B.I.;Seong, J.K.;Han, C.S.
    • Proceedings of the KIEE Conference
    • /
    • 2002.07c
    • /
    • pp.1736-1738
    • /
    • 2002
  • Oil-filled power cables and XLPE power cables have been globally applied for extra-high-voltage underground power transmission lines. The application of XLPE cables for the transmission lines have been largely increased at the domestic and overseas projects because of some issues. O.F cables have some week points, related with the issues of the environmental pollution and the needed maintenance work, even though they have been applied for several ten years and their reliability has been proven. Meanwhile, the demands on XLPE power cables increase as their manufacturing technologies have been improved and their simplicity of installations has been focused on. In Korea, for the first time, the 275kV XLPE cable is to be applied at an overseas power plant project. This paper introduces the project profile, the design of the XLPE cable and its accessories, the cable system design and the installation design.

  • PDF

Development of e-Catalog System for Overseas Construction Equipments (해외건설 기자재 전자카탈로그 시스템 구축)

  • Ahn, Ho-Jun;Park, Ho-Byung;Jang, Kwang-Sub;Youk, Jong-Gon;Lee, Jae-Chon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.13 no.2
    • /
    • pp.98-108
    • /
    • 2008
  • Plant, civil engineering and construction equipment data of overseas construction are obtained and then analyzed, classified and integrated by experts. With those refined data set, we built classification system and defined property information with reference to international standard (ISO 15926, IRDL). If class in ISO 15926 is predefined for equipment of interest, we used the class as is. If not, we created and defined new classes on the basis of ISO 15926 classes. If there is similar class for equipment of interest, extension or inheritance methods were used. As a result, classification system of five levels and 637 classes were built and construction equipment information were expressed in open structure of XML such as tree structure of classification system and detailed information with number equipments for each specific equipment. We also developed the electronic catalog system which is basically equipment information management system providing various product search functions.

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

A Study on Composition and Application of Risk Management Planning and Procedure for Successful Overseas Construction Projects - Based on the PRINCE2 Methodology in the UK - (성공적인 해외 건설 프로젝트 수행을 위한 리스크 관리 계획·절차 구축 및 활용 방안에 대한 연구 - 영국의 사업관리 기법인 PRINCE2를 기반으로 -)

  • Kang, Sinbong;Kim, Seungchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.48-55
    • /
    • 2016
  • Risk management is an important element for successful management of overseas construction projects. This study reports a case study in which we proposed a risk management planning and procedure for plant construction which can be applied throughout the project life cycle. We analyzed the risk management practices of Korean construction companies by applying the concept of the PRINCE2 method developed in the UK, and proposed a risk management planning and procedure with organizational structure and working process. The suggested risk management planning and procedure was applied to an overseas plant construction project, and produced good results. It is believed that the procedure suggested here can also be aplied to other companies to enhance the competency in the global construction market.

The Development of a Standardized Work Process for Planning of Plant Project - Focus on Excavating and Investing Participation Plan - (플랜트 프로젝트 사업기획단계 표준 업무 프로세스 개발 - 사업발굴 및 사업참여 결정을 중심으로 -)

  • Lee, Do-yun;Choi, Chang-Hoon;Won, Seo-kyung;Cho, Moon-Young;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.3-11
    • /
    • 2016
  • Recently, overseas plant orders of domestic enterprises are steadily increased, and the amount of orders in the first half of 2014 were 93% increased compared to the previous year. In addition, now which is the third quarter of 2015, overseas plant orders are already over 249.8 billion dollars so the interests of plant industry research has been increased. In the life cycle of the plant project, CM before the construction stage is to complement the uncertainties that are inherent in the early stages of the project, and from the viewpoint of supporting the rational decision-making, the importance of its role is on the rise. Among them, excavating and investing participation plan in the planning stage is an important work that has a large impact force to influence the success and failure of future project. However, the work has become a problem with frequent consultations due to decision-making, continuous modification, and inefficient repetitive tasks. Therefore, it is needed that work process should be changed to effectively accommodate. The purpose of this paper is to derive the major work items for excavating and investing participation plan in the planning stage of the plant project, and establish a standardized work process through the Delphi analysis. The result of this study is expected to be utilized for EPC companies in ensuring the technical competitiveness in planning on overseas markets, and improve the efficiency of work.