Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

교량의 생애주기비용 최적설계 (Optimal Life Cycle Cost Design of a Bridge)

  • 박장호;신영석
    • 한국안전학회지
    • /
    • 제25권6호
    • /
    • pp.115-122
    • /
    • 2010
  • 최근 들어 교량과 같은 구조물에 대한 생애주기비용(Life Cycle Cost, LCC) 분석의 중요성이 점차 커지고 있다. 그러나 교량의 공용수명 동안 발생할 수 있는 생애주기비용은 설계 및 시공조건 그리고 사용환경에 따라 많은 불확실성을 내포하고 있기 때문에 정확히 예측하기 힘들다. 본 논문에서는 교량의 생애주기비용 최적설계를 위한 설계방법을 제시하였다. 교량의 총생애주기비용은 초기비용, 손상비용 유지관리비용, 보수/보강비용, 사용자비용, 해제/폐기비용의 합으로 산정하였다. 생애주기비용을 목적함수로 하고 도로교설계기준을 제약조건으로 최적화를 수행하였다. 초기비용은 종합불가정보 및 참고자료를 근거로 산출하였으며, 하중 및 부재에 대한 불확실성을 고려하기 위해 손상확률의 개념을 도입하여 손상비용을 산출하였다. 교량의 내하율곡선을 이용하여 교량의 보수/보강 비용을 추정하였으며, 차량운행비용과 시간지연비용으로부터 사용자비용을 산정하였다. 이로부터 교량에 대한 생애주기비용 최적설계를 수행하고 주요인자들에 대한 영향을 살펴보았다.

Exact Activity Overlapping Method for Time-cost Tradeoff

  • Gwak, Han-Seong;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.109-110
    • /
    • 2015
  • This paper presents a computational method that identifies an exact set of optimal overlap rates between critical activities to meet job site specific needs by using rework cost-slope. The procedures to compute the exact solution are provided in peudocode algorithm. The method is coded into Exact Concurrent Construction Scheduling system that allows practitioners to make more informed decision in accordance with the site-specific condition involved in the overlapping of critical activities. Test cases verify the validity of the computational method and the usability of the system.

  • PDF

A Study on Optimal Reliability Criterion Determination for Transmission System Expansion Planning

  • Tran Trungtinh;Choi Jae-Seok;Jeon Dong-Hoon;Chu Jin-Boo;Thomas Robert;Billinton Roy
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권1호
    • /
    • pp.62-69
    • /
    • 2005
  • The optimal design of transmission system expansion planning is an important part of the overall planning task of electric power system under competitive electricity market environments. One of main keys of the successful grid expansion planning comes from optimal reliability level/criteria decision, which should be given for constraint in the optimal expansion problem. However, it's very difficult to decide logically the optimal reliability criteria of a transmission system as well as generation system expansion planning in a society. This paper approaches a methodology for deciding the optimal reliability criteria for an optimal transmission system expansion planning. A deterministic reliability criteria, BRR (Bus Reserve Rate) is used in this study. The optimal reliability criteria, BRR/sup */, is decided at minimum cost point of total cost curve which is the sum of the utility cost associated with construction cost and the customer outage cost associated with supply interruptions for load considering bus reserve rate at load buses in long term forecasting. The characteristics and effectiveness of this methodology are illustrated by the case study using IEEE-RTS.

OPTIMAL DESIGN FOR CAPACITY EXPANSION OF EXISTING WATER SUPPLY SYSTEM

  • Ahn, Tae-Jin;Lyu, Heui-Jeong;Park, Jun-Eung;Yoon, Yong-Nam
    • Water Engineering Research
    • /
    • 제1권1호
    • /
    • pp.63-74
    • /
    • 2000
  • This paper presents a two- phase search scheme for optimal pipe expansion of expansion of existing water distribution systems. In pipe network problems, link flows affect the total cost of the system because the link flows are not uniquely determined for various pipe diameters. The two-phase search scheme based on stochastic optimization scheme is suggested to determine the optimal link flows which make the optimal design of existing pipe network. A sample pipe network is employed to test the proposed method. Once the best tree network is obtained, the link flows are perturbed to find a near global optimum over the whole feasible region. It should be noted that in the perturbation stage the loop flows obtained form the sample existing network are employed as the initial loop flows of the proposed method. It has been also found that the relationship of cost-hydraulic gradient for pipe expansion of existing network affects the total cost of the sample network. The results show that the proposed method can yield a lower cost design than the conventional design method and that the proposed method can be efficiently used to design the pipe expansion of existing water distribution systems.

  • PDF

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

경제성 평가에 의한 군함의 초기설계에 관한 연구 (A Study on Preliminary Design of Warships by Economic Evaluation)

  • 신수철
    • 대한조선학회논문집
    • /
    • 제45권2호
    • /
    • pp.221-228
    • /
    • 2008
  • This paper describes to determine optimum main particulars of warships which satisfy user's requirements in a concept design stage with minimum construction cost and maximum transportation efficiency. Present worth was used as an assessment criteria of the economical efficiency. And Pareto optimal set was used to have the optimum design.

수정된 Steiner Point를 이용한 Batcher Plant의 최적 위치 선정 (Optimal location of Batcher Plant using Modified Steiner point)

  • 하권열;이상중
    • 조명전기설비학회논문지
    • /
    • 제29권10호
    • /
    • pp.39-46
    • /
    • 2015
  • REMICON(Ready Mixed Concrete), the most essential material of construction work, is produced from facility called "Batcher plant." In order to produce Remicon, Batcher Plant needs to be supplied with basic raw material such as ballast, sand, cement, admixture and water. In remicon industry, overland transport vehicles are used during the whole manufacturing process from producing to infilling at the construction site. Thus, the transportation cost sums up be to 20 percent of whole manufacturing cost and transport capacity and distance travelled have direct and major effect on manufacturing costs. This paper suggests a method to find optimal location of batcher plant using modified Steiner point, suggesting the most effective and flexible connection through among construction site, aggregate, cement and remicon producing plant. This paper also proposes reducing of transport cost at maximum 60% by calculation through optimized plant location. The modified Steiner point theory proposed in this paper also can be applied to optimal location of a $2^{ry}$ substation or MCC panel for minimizing of power loss, voltage drop, line distance and etc.

A risk-based framework for design of concrete structures against earthquake

  • Hassani, Mohammadhassan;Behnam, Behrouz;Maknoon, Reza
    • Computers and Concrete
    • /
    • 제25권2호
    • /
    • pp.167-179
    • /
    • 2020
  • Optimal design of structures against earthquake loads is often limited to reduce initial construction costs, while the cost induced to structures during their useful life may be several times greater than the initial costs. Therefore, it is necessary to consider the indirect costs due to earthquakes in the design process. In this research, an integrated methodology for calculating life cycle cost (LCC) of moment-resisting concrete frames is presented. Increasing seismic safety of structures and reducing human casualties can play an important role in determining the optimal design. Costs incurred for structures are added to the costs of construction, including the costs of reconstruction, financial losses due to the time spent on reconstruction, interruption in building functionality, the value of people's life or disability, and content loss are a major part of the future costs. In this research, fifty years of useful life of structures from the beginning of the construction is considered as the life cycle. These costs should be considered as factors of calculating indirect costs of a structure. The results of this work represent the life cycle cost of a 4 story, 7 story, and 10 story moment-resisting concrete frame by details. This methodology is developed based on the economic conditions of Iran in 2016 and for the case of Tehran city.

건설자재의 적정 리드타임 산정에 관한 연구 (A Study on Optimal Lead Time Selection Measures of the Construction Materials)

  • 이상범
    • 한국건축시공학회지
    • /
    • 제4권1호
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.