Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Published : 2014.12.01

Abstract

Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

Keywords

References

  1. NCHRP, "Effect of weather on highway construction", National Cooperative Highway Construction (NCHRP) Synthesis 47, Transportation Research Board, National Research Council, Washington, D.C, 1978.
  2. H. Thomas, I. Yiakoumis, "Factor Model of Construction Productivity", Journal of Construction Engineering and Management, ASCE, vol.113, no.4, pp. 623-639, 1987. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:4(623)
  3. O. Moselhi, D. Gong, K. El-Rayes, "Estimating weather impact on the duration of construction activities", Canadian Journal of Civil Engineering, vol.24, no.3, pp.359-366, 1997. https://doi.org/10.1139/l96-122
  4. South Dakota DOT (SDDOT), "Development of working day weather charts for transportation construction in South Dakota", Final Report Study SD97-07, Rapid City, S.D., 1997.
  5. F. McDonald, "Weather delays and impacts." Cost Engineering, vol.42, no.5, pp.34-39, 2000.
  6. K. El-Rayes, O. Moselhi, "Impact of rainfall on the productivity of highway construction", Journal of Construction Engineering and Management, ASCE, 127(2), 125-131, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(125)
  7. O. Moselhi, Z. Khan, "Significance ranking of parameters impacting construction labour productivity", Construction Innovation: Information, Process, Management, vol.12, no.3, pp. 272-296, 2012. https://doi.org/10.1108/14714171211244541
  8. S. Apipattanavis, K. Sabol, K. R. Molenaar, B. Rahagopolan, Y. Xi, B. Blackard, S. Patil, "Integrated framework for quantifying and predicting weather-related highway construction delays", Journal of Construction Engineering and Management, ASCE, vol.136, no.11, pp. 1160-1168, 2012.
  9. S. S. Leu, C. H. Yang, "GA-Based Multicriteria Optimal Model for Construction Scheduling", Journal of Construction Engineering and Management, ASCE, vol.125, no.3, pp.420-427, 1999. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(420)
  10. A.B. Senouci, H. Adeli, "Resource scheduling using Neural Dynamics model of Adeli and Park", Journal of Construction Engineering and Management, ASCE, vol.127, no.1, pp. 28-34, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:1(28)
  11. A.B. Senouci, N.N. Eldin, "Use of genetic algorithms in resource scheduling of construction projects", Journal of Construction Engineering and Management, ASCE, vol.130, no.6, pp.869-877, 2004. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(869)
  12. A.B. Senouci, H.R. Al-Derham, "Genetic algorithm-based multi-objective model for scheduling of linear construction projects", Advances in Engineering Software, 39(12), 1023-1028, 2008. https://doi.org/10.1016/j.advengsoft.2007.08.002
  13. T. Blaszczyk, M. Nowak, "The time-cost trade-off analysis in construction project using computer simulation and interactive procedure", Technological and Economic Development of Economy, vol.15, no.4, pp.523-539, 2009. https://doi.org/10.3846/1392-8619.2009.15.523-539
  14. E. Kalhor, M. Khanzadi, E. Eshtehardian, A. Afshar, "Stochastic time-cost optimization using non-dominated archiving ant colony approach", Automation in Construction, vol.20, no.8, pp.1193-1203, 2011. https://doi.org/10.1016/j.autcon.2011.05.003
  15. P. Jaskowski, A. Sobotka, "Using soft precedence relations for reduction of the construction project duration", Technological and Economic Development of Economy, vol.18, no.2, pp. 262-279, 2012. https://doi.org/10.3846/20294913.2012.666217
  16. K. El-Rayes, A. Kandil, "Time-Cost-Quality Trade-Off Analysis for Highway Construction", Journal of Construction Engineering and Management, ASCE, vol.131, no.4, pp.477-486, 2005. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(477)
  17. A. Afshar, A. Kaveh, A., O. R. Shoghli, "Multi-objective optimization of time-cost-quality using multi-colony ant algorithm", Asian Journal of Civil Engineering (Building and Housing), vol.8, no.2, pp. 113-124, 2007.
  18. X. Diao, H. Li, H., S. Zeng, V. W. Y. Tam, H. Guo, "A Pareto multi-objective optimization approach for solving time-costquality trade-off problems", Technological and Economic Development of Economy, 17(1), 22-41, 2011. https://doi.org/10.3846/13928619.2011.553988
  19. A. B. Senouci, K. El-Rayes, "Time-profit trade-off analysis for construction projects", Journal of Construction Engineering and Management, ASCE, vol.135, no.8, pp. 718-725, 2009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000031
  20. H. Fathi, A. Afshar, "GA-based multi-objective optimization of finance-based construction project scheduling", KSCE Journal of Civil Engineering, vol.14, no.5, pp. 627-638, 2010. https://doi.org/10.1007/s12205-010-0849-2
  21. A. M. Elazouni, M. Abido, "Multi-objective evolutionary finance-based scheduling: individual projects within a portfolio", Journal of Automation in Construction, vol.20, no.7, pp.755-766, 2011. https://doi.org/10.1016/j.autcon.2011.03.010
  22. A. Jiang, R. R. A. Issa, M. Malek, "Construction Project Cash Flow Planning Using the Pareto Optimality Efficiency Network Model", Journal of Civil Engineering and Management, vol.17, no.4, pp.510-519, 2011. https://doi.org/10.3846/13923730.2011.604537
  23. A. Senouci, S. Mubarak, "Multi-Objective Optimization Model For Scheduling of Construction Projects Under Extreme Weather Conditions", Journal of Civil Engineering and Management, accepted for publication.
  24. C. Hendrickson, T. Au, "Project Management for Construction", Prentice Hall, Englewood Cliffs, New Jersey, USA, 1986.
  25. D. E. Goldgerg, "Genetic Algorithms in search, optimization, and machine learning", Addison-Wesley Publishing Company, Inc., Reading, Massachusetts, USA, 1

Cited by

  1. Maximizing expected contractor profit using an integrated model vol.26, pp.1, 2019, https://doi.org/10.1108/ECAM-04-2018-0149