References
- NCHRP, "Effect of weather on highway construction", National Cooperative Highway Construction (NCHRP) Synthesis 47, Transportation Research Board, National Research Council, Washington, D.C, 1978.
- H. Thomas, I. Yiakoumis, "Factor Model of Construction Productivity", Journal of Construction Engineering and Management, ASCE, vol.113, no.4, pp. 623-639, 1987. https://doi.org/10.1061/(ASCE)0733-9364(1987)113:4(623)
- O. Moselhi, D. Gong, K. El-Rayes, "Estimating weather impact on the duration of construction activities", Canadian Journal of Civil Engineering, vol.24, no.3, pp.359-366, 1997. https://doi.org/10.1139/l96-122
- South Dakota DOT (SDDOT), "Development of working day weather charts for transportation construction in South Dakota", Final Report Study SD97-07, Rapid City, S.D., 1997.
- F. McDonald, "Weather delays and impacts." Cost Engineering, vol.42, no.5, pp.34-39, 2000.
- K. El-Rayes, O. Moselhi, "Impact of rainfall on the productivity of highway construction", Journal of Construction Engineering and Management, ASCE, 127(2), 125-131, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:2(125)
- O. Moselhi, Z. Khan, "Significance ranking of parameters impacting construction labour productivity", Construction Innovation: Information, Process, Management, vol.12, no.3, pp. 272-296, 2012. https://doi.org/10.1108/14714171211244541
- S. Apipattanavis, K. Sabol, K. R. Molenaar, B. Rahagopolan, Y. Xi, B. Blackard, S. Patil, "Integrated framework for quantifying and predicting weather-related highway construction delays", Journal of Construction Engineering and Management, ASCE, vol.136, no.11, pp. 1160-1168, 2012.
- S. S. Leu, C. H. Yang, "GA-Based Multicriteria Optimal Model for Construction Scheduling", Journal of Construction Engineering and Management, ASCE, vol.125, no.3, pp.420-427, 1999. https://doi.org/10.1061/(ASCE)0733-9364(1999)125:6(420)
- A.B. Senouci, H. Adeli, "Resource scheduling using Neural Dynamics model of Adeli and Park", Journal of Construction Engineering and Management, ASCE, vol.127, no.1, pp. 28-34, 2001. https://doi.org/10.1061/(ASCE)0733-9364(2001)127:1(28)
- A.B. Senouci, N.N. Eldin, "Use of genetic algorithms in resource scheduling of construction projects", Journal of Construction Engineering and Management, ASCE, vol.130, no.6, pp.869-877, 2004. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(869)
- A.B. Senouci, H.R. Al-Derham, "Genetic algorithm-based multi-objective model for scheduling of linear construction projects", Advances in Engineering Software, 39(12), 1023-1028, 2008. https://doi.org/10.1016/j.advengsoft.2007.08.002
- T. Blaszczyk, M. Nowak, "The time-cost trade-off analysis in construction project using computer simulation and interactive procedure", Technological and Economic Development of Economy, vol.15, no.4, pp.523-539, 2009. https://doi.org/10.3846/1392-8619.2009.15.523-539
- E. Kalhor, M. Khanzadi, E. Eshtehardian, A. Afshar, "Stochastic time-cost optimization using non-dominated archiving ant colony approach", Automation in Construction, vol.20, no.8, pp.1193-1203, 2011. https://doi.org/10.1016/j.autcon.2011.05.003
- P. Jaskowski, A. Sobotka, "Using soft precedence relations for reduction of the construction project duration", Technological and Economic Development of Economy, vol.18, no.2, pp. 262-279, 2012. https://doi.org/10.3846/20294913.2012.666217
- K. El-Rayes, A. Kandil, "Time-Cost-Quality Trade-Off Analysis for Highway Construction", Journal of Construction Engineering and Management, ASCE, vol.131, no.4, pp.477-486, 2005. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(477)
- A. Afshar, A. Kaveh, A., O. R. Shoghli, "Multi-objective optimization of time-cost-quality using multi-colony ant algorithm", Asian Journal of Civil Engineering (Building and Housing), vol.8, no.2, pp. 113-124, 2007.
- X. Diao, H. Li, H., S. Zeng, V. W. Y. Tam, H. Guo, "A Pareto multi-objective optimization approach for solving time-costquality trade-off problems", Technological and Economic Development of Economy, 17(1), 22-41, 2011. https://doi.org/10.3846/13928619.2011.553988
- A. B. Senouci, K. El-Rayes, "Time-profit trade-off analysis for construction projects", Journal of Construction Engineering and Management, ASCE, vol.135, no.8, pp. 718-725, 2009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000031
- H. Fathi, A. Afshar, "GA-based multi-objective optimization of finance-based construction project scheduling", KSCE Journal of Civil Engineering, vol.14, no.5, pp. 627-638, 2010. https://doi.org/10.1007/s12205-010-0849-2
- A. M. Elazouni, M. Abido, "Multi-objective evolutionary finance-based scheduling: individual projects within a portfolio", Journal of Automation in Construction, vol.20, no.7, pp.755-766, 2011. https://doi.org/10.1016/j.autcon.2011.03.010
- A. Jiang, R. R. A. Issa, M. Malek, "Construction Project Cash Flow Planning Using the Pareto Optimality Efficiency Network Model", Journal of Civil Engineering and Management, vol.17, no.4, pp.510-519, 2011. https://doi.org/10.3846/13923730.2011.604537
- A. Senouci, S. Mubarak, "Multi-Objective Optimization Model For Scheduling of Construction Projects Under Extreme Weather Conditions", Journal of Civil Engineering and Management, accepted for publication.
- C. Hendrickson, T. Au, "Project Management for Construction", Prentice Hall, Englewood Cliffs, New Jersey, USA, 1986.
- D. E. Goldgerg, "Genetic Algorithms in search, optimization, and machine learning", Addison-Wesley Publishing Company, Inc., Reading, Massachusetts, USA, 1
Cited by
- Maximizing expected contractor profit using an integrated model vol.26, pp.1, 2019, https://doi.org/10.1108/ECAM-04-2018-0149