Exact Activity Overlapping Method for Time-cost Tradeoff

  • Gwak, Han-Seong (School of Architecture & Civil Engineering, KyungPook National University) ;
  • Lee, Dong-Eun (School of Architecture & Civil Engineering, KyungPook National University)
  • Published : 2015.10.11

Abstract

This paper presents a computational method that identifies an exact set of optimal overlap rates between critical activities to meet job site specific needs by using rework cost-slope. The procedures to compute the exact solution are provided in peudocode algorithm. The method is coded into Exact Concurrent Construction Scheduling system that allows practitioners to make more informed decision in accordance with the site-specific condition involved in the overlapping of critical activities. Test cases verify the validity of the computational method and the usability of the system.

Keywords

Acknowledgement

This work was supported by a National Research Foundation of Korea (NRF) grant funded by the Korea government (MSIP) (No. 2013R1A2A2A01068316). The contribution of the Ministry of Science, ICT and Future Planning is gratefully acknowledged.