Journal of Institute of Control, Robotics and Systems
/
v.4
no.6
/
pp.802-810
/
1998
The purpose of this study is to find the analytic solution of determining the optimal capacity of processes and storages to meet the product demand. Recent trend to reduce product delivery time and to provide high quality product to customer requires the increasing capacity of storage facilities. However, the cost of constructing and operating storage facilities is becoming substantial because of increasing land value, environmental and safety concern. Therefore, reasonable decision making about the capacity of processes and storages is important subject for industries. The industrial solution for this subject is to use the classical economic lot sizing method, EOQ(Economic Order Quantity) model, trimmed with practical experience but the unrealistic assumption of EOQ model is not suitable for the chemical plant design with highly interlinked processes and storages. This study, a first systematic attempt for this subject, clearly overcomes the limitation of classical lot sizing method. The superstructure of the plant consists of the network of serially and/or parallelly interlinked processes and storages. A novel production and inventory analysis method, PSW(Periodic Square Wave) model, is applied. The objective function of optimization is minimizing the total cost composed of setup and inventory holding cost. The advantage of PSW model comes from the fact that the model provide a set of simple analytic solution in spite of realistic description of material flow between process and storage. The resulting simple analytic solution can greatly enhance the proper and quick investment decision for the preliminary plant design confronting diverse economic situation.
Aerial application using an agricultural unmanned helicopter was suggested for an alternative against current pesticide application methods. Centrifugal clutches play important roles in the performance and safety of the helicopter operation. A previous study analyzed and verified the power transfer theory of the guide type centrifugal clutch. Based on the clutch theory, optimal designs of the clutch became possible and feasible using a simulation method. Design criteria of the clutch were the power transfer capacity of 24.66 kW(33.5 PS) at the rated engine speed and the engaging range speed of 3,000${\sim}$3,500 rpm. Various designs were accomplished using the simulation. An optimal clutch was simulated by determining the values of spring constant and mass of friction sector, which were 94,700 N/m and 123.7 g, respectively. The design performed the power capacity of 24.86 kW(33.8 PS) and engagement speed of 3,069 rpm, meeting the design criteria. Using the designed clutch, an efficient transfer of the power would be possible for the unmanned agricultural helicopter.
Proceedings of the Korean Operations and Management Science Society Conference
/
2004.05a
/
pp.306-310
/
2004
In this paper, we consider the Ring Loading Problem with integer demand splitting (RLP). The problem is given with a ring network, in which a required traffic requirement between each selected node pair must be routed on it. Each traffic requirement can be routed in both directions on the ring network while splitting each traffic requirement in two directions only by integer is allowed. The problem is to find an optimal routing of each traffic requirement which minimizes the capacity requirement. Here, the capacity requirement is defined as the maximum of traffic loads imposed on each link on the network. We formulate the problem as an integer program. By characterizing every extreme point solution to the LP relaxation of the formulation, we show that the optimal objective value of the LP relaxation is equal to p or p+0.5, where p is a nonnegative integer. We also show that the difference between the optimal objective value of RLP and that of the LP relaxation is at most 1. Therefore, we can verify that the optimal objective value of RLP is p+1 if that of the LP relaxation is p+0.5. On the other hand, we present a strengthened LP with size polynomially bounded by the input size, which provides enough information to determine if the optimal objective value of RLP is p or p+1.
In the production process, the buffer acts as a buffer to alleviate some of the problems such as delays in delivery and process control failures in unexpected situations. Determining the optimal buffer size can contribute to system performance, such as increased output and resource utilization. However, there are difficulties in allocating the optimal buffer due to the complexity of the process or the increase in the number of variables. Therefore, the purpose of this research is proposing an optimal buffer allocation that maximizes throughput. First step is to design the production process to carry out the research. The second step is to maximize the throughput through the harmony search algorithm and to find the buffer capacity that minimizes the lead time. To verify the efficiency, comparing the ratio of the total increase in throughput to the total increase in buffer capacity.
The Journal of Korean Institute of Communications and Information Sciences
/
v.32
no.12A
/
pp.1251-1259
/
2007
A scheme for selecting the mode with the maximum system capacity is proposed for cooperative relaying. Three possible modes are presented based on decode-and-forward relaying, and the time required by each mode is evaluated. Based on these results, a method is then developed for selecting the optimal mode with the minimum time duration (or maximum channel capacity). Computer simulations confirm that the optimal mode outperforms the other modes.
The superconducting magnetic energy storage (SMES) system is considered to be useful to charge or release an energy in power system because of the high efficiency and quick response. But we need much capital to construct and to operate a SMES. A site and capacity of SMES are important elements for effective operating and planning. In this paper, we proposed a performance function to determine an optimal site and capacity of SMES according to variety condition of power system such as fault point. In addition, to demonstrate the validity of a proposed method, the simulations were carried out on two-machine 5-bus system.
Kim, Wook-Won;Kim, Sung-Yul;Kim, Kyu-Ho;Kim, Jin-O
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.2
/
pp.273-278
/
2011
By introducing RPS(Renewable Portfolio Standard) for reduction of greenhouse gas, Renewable energy has becoming widespread gradually. Due to a large number of advantages, wind power, which is one of Renewable energy, has standing in the spot-light rather than other Renewable energy. Wind power, however, is difficult to control output and because of severe output fluctuation, it would cause some problems when it is connected with system. Using battery as a solution for these problems has been researched all over the world. In this paper, the reliability modeling of windfarm connected battery and reliability evaluation of system are executed. Also the optimum battery capacity is selected through evaluating reliability cost.
Jo, Jeong-Bok;Yang, Hwang-Gyu;Lee, Jae-Uk;Ham, Chang-Hyeon;Boading Liu
The Transactions of the Korea Information Processing Society
/
v.6
no.3
/
pp.672-680
/
1999
This paper presents an evolution program for optimal expansion problem with backlogs in demand which is to determine when and how much capacity should be added under varying types of demand and cost. To overcome premature convergence and stalling, we employ an exponential-fitness scaling scheme. To improve the chromosomes, we introduce hetero-dimensional mutation which generates a new dimension and produces a feasible solution, and homo-dimensional mutation which mutates the chromosomes in the negative of gradient direction. Finally, a numerical example is discussed.
In semiconductor manufacturing, the probe process between fabrication and assembly process is constrained mostly by the equipment capacity because most products pass through the similar procedures. The probe process is usually performed in a batch mode with relatively short cycle times. The capability of the probe process can be determined by the optimal combination of the equipments and the products. A probe line usually has several types of equipment with different capacity. In this study, the probe line is modeled in terms of capacity to give the efficient planning and control procedure. For the practical usage, the hierarchical capacity planning procedure is used. First, a monthly capacity plan is made to meet the monthly production plan of each product. Secondly, the daily capacity planning is performed by considering the monthly capacity plan and the daily fabrication output. Simple heuristic algorithms for daily capacity planning are developed and some experimental results are shown.
Journal of Korean Society of Industrial and Systems Engineering
/
v.33
no.1
/
pp.71-79
/
2010
This paper addresses capacity expansion planning model of distribution center under usability of public distribution center. For discrete and finite time periods, demands for distribution center increase dynamically. The capacity expansion planning is to determine the capacity expansion size of private distribution center and usage size of public distribution center for each period through the time periods. The capacity expansion of private distribution center or lease usage of public distribution center must be done to satisfy demand increase for distribution center. The costs are capacity expansion cost and excess capacity holding cost of private distribution center, lease usage cost of public distribution center. Capacity expansion planning of minimizing the total costs is mathematically modelled. The properties of optimal solution are characterized and a dynamic programming algorithm is developed. A numerical example is shown to explain the problem.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.