입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향 (An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project)

  • 고대준;최은아;서용칠;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

신제품개발을 위한 PM시스템 (PM system for New Product Development)

  • 최성운
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2005년도 춘계학술대회
    • /
    • pp.123-127
    • /
    • 2005
  • This paper considers a set of project management practices for government R&D projects, enterprise R&D projects and new product design project. The approach of managing multi-project is proposed by the use of organizational structure and control.

  • PDF

공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안 (Efficient Application of Multi-Trade Contract Method to Public Construction Project)

  • 장철기
    • 한국건설관리학회논문집
    • /
    • 제14권2호
    • /
    • pp.35-44
    • /
    • 2013
  • 보금자리주택 건설에서 분양가 인하의 하나의 방안으로 직할시공제가 도입되었다. 특정 발주방식을 대규모 공공건설사업에 적용 할 경우 본격적인 적용이전에 해당 발주방식에 대한 각계의 논의를 수렴하고 해당 발주방식이 사업성과에 미치는 영향을 다각도로 분석할 필요가 있다. 이에 본 연구에서는 공공건설사업에의 직할시공제 적용에 따른 공사비, 공사기간, 품질, 리스크 등 사업성과에 미치는 영향을 전문가 면담과 해외사례 조사를 통해 분석하고, 이러한 문제점들을 해결하고 공공건설사업에의 직할시공제의 효율적 적용을 위한 방안을 제시하였다. 먼저 직할시공제하에서는 발주자의 업무가 대폭적으로 증가하므로 해당 공공발주자 조직에서 증가된 업무 수행이 가능한지를 점검해야 하고, 이에 따른 발주자 조직과 업무절차의 변화가 필요하다. 아울러 직할시공제의 효율적 적용을 위해 다중시공기반 CM방식 등 다양한 수행방식을 적용 할 필요가 있으며, 공사관리 절차 및 시스템 구축, 협력업체 강화 등이 필요하다.

플립드러닝 환경에서 게임수학 텀프로젝트 모형 설계 및 적용 (Design and Application of Term Project Model for Game Mathematics in Flipped Learning Environments)

  • 최영미
    • 한국멀티미디어학회논문지
    • /
    • 제20권7호
    • /
    • pp.1102-1112
    • /
    • 2017
  • The purpose of this study is to design and application of term project model for Game Math in flipped learning environment. In the term project self study model, students interacts with multi-instruction materials and multi-tutors on flipped learning. We develop a case for game update term project and implement it to a real Game Math classroom. As a result, we show the positive learning experiences focused on effects of technology and human relation through survey.

자원제약하의 복수 프로젝트 일정계획을 위한 휴리스틱 알고리즘 (A Heuristic Algorithm for Resource-Constrained Multi - Project Scheduling)

  • 공명달;김정자
    • 산업공학
    • /
    • 제13권1호
    • /
    • pp.110-119
    • /
    • 2000
  • Resource-constrained project scheduling is to allocate limited resources to activities to optimize certain objective functions and to determine a start time for each activity in the project such that precedence constraints and resource requirements are satisfied. This study suggests a multi-project scheduling model which can level work loads, make the most of production capacity and restrain the delay of delivery by developing a heuristic algorithm which minimizes the project completion time and maximizes the load rate under resource constraints.

  • PDF

퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리 (Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference.)

  • 박지은;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

Project scheduling by FGP to Time-Cost-Quality trade off: construction case study

  • Faregh, Najmeh;Ketabi, Saeedeh;Ghandehari, Mahsa
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.53-59
    • /
    • 2014
  • Project managers are responsible to conduct project on time with least amount of costs and the most possible quality with respect to shortage of resources and environmental certainties. They have to make the best decision to reach such conflicting objects. In this study the project scheduling with multi goals-multi modes was planned in fuzzy conditions under resource constraints and expanded by fuzzy goal programing (FGP). The project cost was calculated by the price of renewable resources and the quality criteria were evaluated by the quality function deployment method (QFD). Finally the model was verified by a construction case study with 22 activities along with solving by GAMS. The results showed that this model could provide a systematic framework to facilitate the decision making process and made the project managers to be able to schedule the project closer to reality.

유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발 (Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm)

  • 김민정;박문서;이현수;이정훈;이광표
    • 한국건설관리학회논문집
    • /
    • 제16권5호
    • /
    • pp.54-64
    • /
    • 2015
  • 모듈러 건축공법은 공장 생산, 운송, 현장설치 프로세스를 통해 기존 현장중심 건축공법에 비해 품질향상 및 공기단축이 가능한 특징을 가지고 있다. 특히 모듈러 유닛의 제작과 시공이 분리되어 수행되기 때문에 다수의 프로젝트가 동시에 수행될 경우 각 프로젝트에 따라 생산해야하는 모듈의 크기, 수량, 납기일, 생산 유형 및 과정을 고려하는 SCM(Supply Chain Management) 관점의 공장 생산 공정 계획 수립이 필요하다. 그러나 현재 모듈러 유닛 공장 생산 계획은 개별 프로젝트 중심으로 수립되고 있어 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 프로젝트 요구조건들을 동시에 고려한 공장 생산계획을 도출하는데 한계가 있다. 따라서 본 연구에서는 다양한 변수 간 상호 연계성 및 제약조건으로 공정 계획 최적화 결과 도출이 가능한 유전자 알고리즘 방법을 통해 모듈러 유닛 제작공장의 한정된 자원과 설치 현장별 요구사항이 반영된 모듈러 유닛 공장 생산 공정계획 최적화 수립 모델을 제시하며 이를 사례분석을 통해 검증하였다. 연구 결과, 기존 다중프로젝트의 공장생산계획에 비해 평균 7.9%의 현장설치 공기단축 및 43%의 최대 야적장 이용률 감소가 가능하였다. 향후 본 연구 내용을 바탕으로 제약 조건 범위 확장 및 생산성 데이터 추가가 될 경우 다중 모듈러 건축 프로젝트의 모듈러 유닛 공장 생산 계획 수립과 현장시공프로세스 구축을 동시에 지원할 수 있는 기초 자료로 활용될 수 있다.

다중 프로젝트 상황에서 제품개발 업무의 동적 순서결정 (Dynamic Task Sequencing of Product Development Process in a Multi-product Environment)

  • 강창묵;홍유석
    • 산업공학
    • /
    • 제20권2호
    • /
    • pp.112-120
    • /
    • 2007
  • As the market rapidly changes, the speed of new product development is highlighted as a critical element which determines the success of firms. While firms endeavor to accelerate the development speed, frequent iterations in a development process hinders the effort of acceleration. For this reason, many previous researches tried to find the optimal structure of the development process which minimizes the number of iterations. However, such researches have a limitation in that they can be applied to only a single-project environment. In a multi-project environment, waiting time induced by lack of resources also delays the process as well as the iterations do. In this paper, we propose dynamic sequencing method focusing on both iterations and waiting time for reducing the durations of development projects in a multi-project environment. This method reduces the waiting time by changing the sequence of development tasks according to the states of resources. While the method incurs additional iterations, they are expected to be offset by the reduced waiting time. The results of simulation show that the dynamic sequencing method dramatically improves the efficiency of a development process. Especially, the improvement is more salient as projects are more crowded and the process is more unbalanced. This method gives a new insight in researches on managing multiple development projects.