This study is about the case study on the application of modular system to the superstructure of floating architecture in Europe. There are many restraints in the onsite construction of floating architecture. Then, various industrialized construction methods are needed to reduce the portion of the onsite construction in floating architecture. Among the various industrialized construction methods, the modular system can be more suitable for floating architecture. At this background, this study analysed the European cases of the application of modular system and classified the types of applied modular system. As a result, this study could classify the three types of modular system, such as, building unit modular, space unit modular and planning concept modular, and define the characteristics of three types by comparing with each other.
From 2000s, modular construction has gained more attention due to many advantages such as reduction of duration, recycling. The modular structure is being used for urban regeneration recently. However, even though most facilities in the modular structures which are used as urban regeneration building are commercial spaces, exhibition spaces, eating and drinking spaces, there are lack of natural or mechanical ventilation systems. Also, there are relatively limited spaces on modular structure characteristic. Therefore, indoor environment performance of four buildings, which are performed as urban regeneration in Seoul, was evaluated by HCHO and $CO_2$ emissions. Consequently, the HCHO and $CO_2$ emissions of the commercial and exhibition spaces were confirmed that can influence on health of occupants. Therefore, the urban regeneration modular structure needs to add local ventilation systems for improvement of indoor air quality to more healthy and comfortable.
Korean Journal of Construction Engineering and Management
/
v.24
no.5
/
pp.63-72
/
2023
This study investigates the virtual reality (VR) simulation to train construction workers for modular construction. Recently, the construction industry has been experiencing a growing demand for modular construction due to a shortage of labors and an increasing social need for safety. While the demand for modular construction has been increasing, construction labors suffer a basic knowledge regarding modular construction. The users of the simulation, developed by Unity program and Oculus Quest 2, experience the removal of hazardous elements at the location whether the modular unit suspended by a crane is lowered, the lowering and assembly of units through crane operation, and the fall from the roof which is the most frequent accidents in modular construction. The simulation was tested by 15 subjects. The effectiveness of the education was measured through a survey on self-efficacy, perceived usefulness, usability, and presence. It was found that the VR training is suitable for educating on the modular construction activities and safety issues related to them. This study also found that perceived usefulness is the factor that has the greatest impact on self-efficacy. This study can contribute to resolving the labor education issues for the deployment of modular construction.
Oh, Ji Hyun;Yang, Si Won;Cho, Bong Ho;Kim, Sun Sook
Journal of the Korean Solar Energy Society
/
v.34
no.3
/
pp.107-114
/
2014
Modular systems are widely used in various building types including housing, dormitory, and barracks. Steel studs have many advantages over other materials as construction components of modular buildings in terms of seismic performance, durability and maintenance. However, steel stud modular systems also have weakness in condensation resistance due to high thermal conductivity of steel. The purpose of this study is to investigate the condensation resistance of steel stud wall corner details in modular buildings by thermal simulation. The condensation resistance was evaluated by temperature difference ratio according to ISO 13788. The result showed that there was little difference between the alternatives of adding cavity and insulation. Separation of interstitial steel studs showed outstanding effect on the improvement of temperature difference ratio.
Journal of Korean Association for Spatial Structures
/
v.23
no.2
/
pp.45-52
/
2023
Modular construction is an economical and efficient construction that reduces time and costs by manufacturing units in factories and constructing them on site. Currently, the demand for modular construction is increasing not only abroad but also domestically. As the demand for modular construction increases, a lot of development and research on connections between modular units are being conducted. Connections between modular units should be quick and simple to assemble when assembling units on site, and should be in a form that allows each unit to be connected regardless of direction. In addition, it must be able to exert sufficient strength against external loads. In this study, a connection between modular units using connecting steel plates and bolts was proposed, and the nonlinear behavior of the connection to external lateral force was analyzed through finite element analysis, and resistance performance was evaluated.
Journal of The Korea Institute of Healthcare Architecture
/
v.28
no.3
/
pp.7-16
/
2022
Purpose: This study aims to establish the basic directions of the modular airborne infection isolation(AII) ward. Considering a specific function and purposed use as a modular AII ward, it is a chance to derive an address of current modular technology by overview the limitation and improvement of the existing modular architecture. Methods: In addition to the literature analysis on the configuration system of mobile hospitals, research cases on the operational effectiveness of the domestic and foreign mobile construction systems are analyzed. Results: In order to meet the various and strict space guidelines of the AII ward and a chance to improve limitations of uniformed existing modulars, AII modular the negative pressurized care setting should be minimized a structural restriction for reflecting its system on a architectural plan. For this unique requirements, it could be possible to apply various space boxes called infill box which needs to secure a large-scale space. So, a rahmen structure system could be adaptable for this purpose. A dead space between beams of the rahmen structure is to be used for MEP installation. Partial separation, dismantling, and repair should be possible by separating the MEP and infill box from the structure. The infill box must keep 3.5m width under the current Road Traffic Act. Implications: It is necessary to utilize and develop an improved construction method that can reduce the problems of existing steel modular and PC modular.
Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
Korean Journal of Construction Engineering and Management
/
v.16
no.5
/
pp.54-64
/
2015
The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.
Journal of Korea Society of Industrial Information Systems
/
v.8
no.3
/
pp.85-90
/
2003
This paper proposes a modular multiplier based on LFSR (Linear Feedback Shift Register) architecture with efficient area complexity over GF(2/sup m/). At first, we examine the modular exponentiation algorithm and propose it's architecture, which is basic module for public-key cryptosystems. Furthermore, this paper proposes on efficient modular multiplier as a basic architecture for the modular exponentiation. The multiplier uses AOP (All One Polynomial) as an irreducible polynomial, which has the properties of all coefficients with '1 ' and has a more efficient hardware complexity compared to existing architectures.
In modular architecture, manufacturing drawing which includes whole information for modular unit production is essential since works for modular unit have to be performed in manufacturing factory not construction field. Although the manufacturing drawing is important as known it is insufficient to utilize the manufacturing drawing in modular architecture project and this makes modular unit low-quality with re-work and work time delay. To prevent low-quality modular unit caused by insufficient manufacturing drawing, in this research firstly manufacturing drawing's current situation and error cases in manufacturing phase of past modular housing project were analyzed, and correlation between reduction of errors occurance frequency and improving manufacturing drawing was verified. Secondly manufacturing drawing improvement factors were deducted in interior, furniture, mechanical work phase which errors' occurance rate is high and the way of deducting manufacturing drawing lists and contents were suggested with light-weight work as an example in case of new type of errors occurance. A series of research process can contribute to good-quality modular unit by errors reduction. As a result of research, about half of errors occurance can be reduced with suggested manufacturing drawing improvement factors. And the manufacturing drawing process can contribute to modular production which have uniform quality.
In this paper, we propose an efficient architecture for radix-4 modular multiplication in systolic array structure based on the Montgomery's algorithm. We propose a radix-4 modular multiplication algorithm to reduce the number of iterations, so that it takes (3/2)n+2 clock cycles to complete an n-bit modular multiplication. Since we can interleave two consecutive modular multiplications for 100% hardware utilization and can start the next multiplication at the earliest possible moment, it takes about only n/2 clock cycles to complete one modular multiplication in the average. The proposed architecture is quite regular and scalable due to the systolic array structure so that it fits in a VLSI implementation. Compared to conventional approaches, the proposed architecture shows shorter period to complete a modular multiplication while requiring relatively less hardware resources.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.