• Title/Summary/Keyword: Modular Construction Activation

Search Result 11, Processing Time 0.033 seconds

Fire Resistant Regulation Status and Activation Plan of Domestic Modular Construction (국내 모듈러 건축의 내화구조 제도 현황 및 활성화 방안)

  • Choi, Yun-Jeong;An, Jae-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.673-680
    • /
    • 2022
  • Modular construction is recognized as a construction method with various advantages, such as shortening the construction duration, achieving quality control through factory production, ease of maintenance, and reduced construction costs due to reduced weight of materials. However, despite efforts by the modular industry and government to activate modular construction, it has rarely been established in the domestic market. Currently, there are technical limitations to the modular construction fire resisting technology applied to general buildings. The lack of access to modular construction fire resistance regulation is considered a major factor. In this study, the current status and problems with modular construction fire resistance regulation, a significant hindrance factor, were considered to activate modular construction. This study is intended to present a direction for institutional improvement in modular construction fire resistance and a direction for research and development.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

The Study on the Activation of Domestic Co-Housing Module Application (국내 공동주택 모듈러 적용 활성화에 관한 연구)

  • Kim, Chung-Hee;Shim, Un-Jun;Ahn, Yong-Sun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.141-142
    • /
    • 2013
  • The modular construction method have improved quality, reduction of defects, such as the reduction of air, a number of advantages. It is utilized composite, larger, in skyscraper building already abroad. The domestic, various studies have been conducted on technical matters taller, automation of production, such as process control, but is still inadequate circumstances. Therefore, in this study, is the purpose that you have presented activation measures to investigate and analyze the case of co-housing with a modular construction system of outside, and to make the co-housing of modular construction system of domestic.

  • PDF

Establishment of Standard Construction Process of the Infill Modular Construction System (인필 모듈러 건설시스템의 표준 시공프로세스 구축)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.245-246
    • /
    • 2012
  • Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.

  • PDF

Development of Mobile Device of the Infill Modular Construction System (인필 모듈러 건설시스템의 이동장치 개발)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.163-164
    • /
    • 2012
  • Recently new construction system, the Infill Modular Construction System, is being emphasized depending on the industrialized technology introduction and the needs of high-rise housing. In order to applicate the Infill Modular Construction System and activate the domestic market, development of insufficient element technologies against the advanced technologies should be preceded and mobile device development of Infill Unit Module which is differentiated from the existing modular construction systems should be needed urgently. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve the constructability of Infill Unit Module. In addition development of mobile device considering weight of Infill Unit Module and construction errors are being planned.

  • PDF

The Study on the Developing Process of BIM Modeling for Urban-life-housing Based on Unit Modular (유닛모듈러 기반 도시형 생활주택의 BIM 모델링 프로세스 개발 연구)

  • Lee, Chang-Jae;Lim, Seok-Ho
    • KIEAE Journal
    • /
    • v.12 no.6
    • /
    • pp.77-84
    • /
    • 2012
  • The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.

Analysis of Core Tasks for Activate Modular Construction Projects in Korea (국내 모듈러 프로젝트의 활성화를 위한 핵심과제 분석)

  • Lee, Myungdo;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.459-470
    • /
    • 2024
  • As policy support for the modular construction method and measures to expand the market are being prepared, it is time to present and analyze clear tasks for activation. Therefore, this study aims to present core tasks for activating the modular construction method. The tasks were reviewed through analysis of existing research and supplemented through expert interviews to derive 30 core tasks. Following this, a questionnaire survey was conducted to analyze the important and urgent of these core tasks and to determine their priorities. The results of this study can contribute to a strategic approach for solving the core tasks necessary for revitalizing modular construction.

A Study on the Strategy for Creating Demand of Modular Construction through Case Analysis by Building Type (건물 유형별 사례분석을 통한 모듈러 공법 수요창출 방안 수립)

  • Kim, Dong-Soo;Kim, Kyung-Rai;Cha, Hee-Sung;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.164-174
    • /
    • 2013
  • It has been seriously difficult to create demand of modular construction because Korean modular method has been considered as container house or lightweight steel house. Actually, barrier factor of modular construction for activation was difficult to produce modular continuously in factories based on stable amount of demands. So, this research found successive factors of modular construction and proposed the method of demand creation through a plethora of case analysis by building types. In addition, this research found the scale of modular potential market. Owners will be able to use this strategy that is proposed in this research when they make a decision about construction system. Also, the modular construction can make potential market in Korea. As a result, modular system producer can make their business strategies and make continuous demand by conjugating the method of creating demand for modular construction which is proposed in this research.

Analysis of Importance and Expected Utility of Improvement Tasks to Activate Modular Construction Method (모듈러 공법 활성화를 위한 개선과제 중요도 및 기대효용 분석 연구)

  • Kim, Siyeon;Lee, Meesung;Yu, Ilhan;Son, JeongWook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.11-19
    • /
    • 2021
  • Despite of the various advantages of modular construction method and the continued growth of related markets, it is difficult to activate them because no specific system has been established in Korea. Accordingly, this study derived improvement areas and tasks for activating modular construction methods through existing literature reviews and preliminary surveys. Then, AHP analysis and expected utility evaluation were conducted for expert groups to derive priority for improvement areas and tasks. In addition, opinions of enterprise and architectural research were compared and analyzed, and the analysis results suggested the direction of policy establishment and system improvement. This study is expected to be used as a basic study for policy decision-making to activate modular construction method.

Development of Project Delivery System in Public Sector for Modular Building (모듈러 건축물의 특성을 반영한 공공발주 방식의 개발)

  • Nam, Sunghoon;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.49-56
    • /
    • 2016
  • Recent research has been ongoing for modular buildings in the country and interest increases. However, the activation of modular building projects is obstructed in the construction industry. There are many reasons to identity for this obstruction but one issue should be focussed. Modular buildings require to change the existing construction production system to a new construction production system, which is factory production - transportation - erection. However, the existing project delivery system in the public sector could not be adapted for this new construction production system due to the obligation of multi prime contract use, such as electrical, communication, fire fighting contracts by Law. Therefore, modular buildings in the existing project delivery system are separately contracted by multi prime contracts and modular units composed of the buildings are contracted by an architectural prime contractor as a commodity. As results, construction costs are increased, potential quality problems are raised and the existing project delivery system is finally an obstacle not to maximize benefits of the modular buildings. In this paper, we propose a new project delivery system for the modular buildings to adapt then ew construction production system.